Sorry, you need to enable JavaScript to visit this website.

You are here

  • Proposal for ROW Permission for laying of 66KV underground cable line Along NH-8 from Km 102+580 to Km 105+490 (Length 2+910 Kms) on Left Hand Side and Across at Km 102+580 & Km 105+490, Village-Ranoli, Taluka & District Vadodara on Ahmedabad–Vadodara Section of NH-48 in the State of Gujarat
  • Proposal seeking ROW permission for laying proposed 6" Dia MS Gas Pipeline Along from Km 39+850 to Km 39+600 and Km 39+600 to Km 22+173 and across NH-47 at Km 32+700 and Km 22+700 from Kathlal to Mirzapur village in Taluka Kathlal, Distrct- Kheda in the State of Gujarat
  • Proposal seeking permission for laying of water supply along NH-69 (Old NH-206) between Km 345.500 to 370.600 through open trench method and 12 nos. crossing at Km 346.010, Km 349.270, Km 350.700, Km 352.780, Km 354.850, Km 355.730, Km 359.250, Km 363.100, Km 363.920, Km 366.820, Km 368.450 & Km 369.500 through HDD method, by KUWS & DB Division, Karwar, in the State of Karnataka
  • Proposal of WBSEDCL for obtaining NOC/ Permission for (a) drawing of 33 KV HT OH line from Km 112+600 to Km 115+100 on LHS & from Km 115+600 to Km 118+350 on RHS for NH-60, (b) laying of 33KV UG Cable from Km 113+620 to Km 113+770 on LHS of NH-60 within the utility corridor & (c) crossing of NH-60 at Km 112+600 and Km 118+350 of NH-60 from Rupnarayanpur to Khatranga under Kharagpur Division, WBSEDCL
  • Four laning of Boregaon Buzurg to Muktainagar section of NH-753L from Design Ch. 139.000 to 216.278 under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh & Maharashtra on Hybrid Annuity Mode – Permission for crossing of water pipeline under MPUSIP 2E scheme at Two locations at Ch.190+600 & 191+050, near Shahpur Village, District-Burhanpur
  • Proposal for installation of Ultra Lean Mobile towers on the NH-8 ROW of NHAJ From Shankar Chowk to Vasant Vihar, 18+560 (RHS), 23+640(LHS), 24+510 (Under flyover Island), 23+10(RHS), 23+960(LHS), 20+860(LHS), 24+110(RHS), 24+240(RHS),18+210(RHS)
  • NOC for access permission to proposed laying of 4" and 8" dia gas pipeline and 125mm MDPE Gas pipeline on NH-02 (New NH-44) betwen Km.18.950 to 91.820 in different reaches and across NH in the State of Haryana
  • Proposal for laying of Raw water clean water & Distribution pipe line along and across the NH-55 for the work "Execution of individual rural PWS projects to Goinda & Bhuban of Dhenknal District including 5 years O&M as submitted by MEIL" in the State of Odisha
  • Rehabilitation and up-gradation of existing 2 lane to 4-lane standards of Rimuli (Km 163.000) to Koida (Km 206.200) Section of NH-215 (New NH-520), i.e. Package-I in the State of Odisha on EPC Mode under NHDP Phase-IIl on EPC Mode- Permission for laying of 800 mm Iron Ore Slurry pipeline & 800 mm Return Water Pipeline from Rimuli-Bileipada, from Ch. Km 163+000 to Km 178+350 in the Utility corridor of NH-215 (New NH-520)
  • Permission for laying 12" underground Natural Gas Pipeline Crossing at Km 632.800 & along from Km 632.800 to Km 633.200 (BHS) of NH-19 (Old NH-2) for city gas distribution project of Hindustan Petroleum Corporation Limited (HPCL) at Mouza - Ratanpur, District - Hooghly in the State of West Bengal
  • Permission requested for Laying of underground water supply pipe line along the road 300mm dia DI and 140mm dia HDPE water pipe line along the road from km 121/700 to 122/180 (LHS & RHS) & Road crossing km 122/180 and 100 mm dia DI & 160mm HDPE water pipe line along the road from km 126/635, 75mm dia HDPE water pipe line km 126/635 to 126/970 (LHS) & road crossing at km 126/635, 75mm dia HDPE water pipe line km 126/970 to 127/950 (LHS) & 250mm dia DI water pipeline km 126/955 to 127/220 (RHS) of Salem –Cochin Road on NH-544 – Coimbatore and Tiruppur in the State of Tamilnadu
  • Request for permission to lay underground Optical Fibre Cable (OFC) on Chengapalli to Walayar Section of Salem – Cochin Road between km 130/205 to km 130/890 (LHS); km 135/420 to km 135/610 (RHS), km 135/610 to km 135/860 (LHS), km 138/210 to km 139/615 (LHS), km 180/112 to km 181/000 (LHS), km 181/000 (LHS), km 182/000 to km 182/302 (LHS) and across @ km 135/610, km 138/210, km 139/615, km 180/112 of Chengapalli to Walayar Section of NH-544
  • Request for permission to lay underground Optical Fibre Cable (OFC) on Pollachi – Coimbatore Section of Dindigul – Bangalore Road, NH-209 between km 147/235 to km 149/250 (RHS) and across @ km 147/080 @ km 147/210, @ km 149/300 of NH-209
  • Request of Permission for laying of Underground water pipeline at Km 29/813, crossing the road by HDD method by M/s.Chemplast Sanmar Limited in the Thoppur –Mettur –Bhavani –Erode section of NH-544H
  • Request permission for laying of a public utility – Natural Gas pipeline from km 109/000 to km 112/900 along the LHS of NHAI – City Gas Distribution (CGD) Project – Tiruppur GA
  • Permission for laying of 11 KV 3 x 185 Sqm XLPE UG Cable in 160mm Dia Pipe (HDPE) across at multiple locations (06 Nos., Vill Badagaon & Ata(01 No.) feeder, Orai, District Jalaun in the State of Uttar Pradesh
  • Proposal for permission of Erection/Laying of 11 KV 03 Nos. U/G Crossing at Km.117.265, Km.119.540, Km.123.627 of New NH-34 (Old NH-91) in the State Uttar Pradesh
  • Permission of laying of optical fibre cable (OFC) along the NH-731 (Old NH-56) (Sultanpur to Lucknow Section) from Km.209.126 to Km.217.776 & Crossing (115m) by HDD method at Km.217.776 at Ahimamau (Total length 8765m), District-Lucknow in the State of Uttar Pradesh
  • Proposal for NOC permission of water supply pipeline for laying & crossing by HDD method in Km.124.400 to km.127.50 (Kabrai to Varanasi Marg) of NH-35(76) at District -Chitrakoot in the State of Uttar Pradesh
  • Proposal for laying 02 Nos, 33 KV, 3x300 Sqmm insulated Cable along NH-30 (Old NH-24B), from Km.14.910 to Km.15.737 (827m) on Lucknow - Reabareli section at SGPGI, District-Lucknow in the State of Uttar Pradesh
  • Proposal for laying of APL 5L GR x 52, 10” x 6.4mm thickness of CS underground Gas pipeline along the road from 41/942 to km 65/279 (LHS) of NH-66 road in Tamil Nadu State for a total length of 23,337 m by M/s. Megha City Gas Distribution Private Limited, Trichy
  • Proposal for NOC permission of laying & crossing water supply pipeline from Km.81.600 to Km.150.350 (Sudinpur village to Dadhiya village) along with NH-35 (old NH-76) (Kabrai-Varanasi road) by Open Trench & Trenchless Technology method in the State of Uttar Pradesh
  • Proposal for NOC permission of laying & crossing of water supply pipeline from km.114.519 to km.147.125 (Shaleiya to Nathupura) along with NH-339(76) by Open Trench & Trenchless Technology method in the State of Uttar Pradesh
  • Proposal for NOC permission for laying & crossing of water supply pipeline from km.92.500 to km.110.300 (Lehchura to Kashipura) along with NH-339(76) by Open Trench & Trenchless Technology method in the State of Uttar Pradesh
  • Proposal for NOC permission of laying & crossing water supply pipeline from Km.151.050 to Km.154.630 (Dhawarrha to Sizwaha) along with NH-339(76) by Open Trench & Trenchless Technology method in the State of Uttar Pradesh
  • ROW permission for laying 200 mm dia DI MS Conduit 95 m length (12 mm thick) through 800 mm dia CMS Casing (6 mm thick) pipeline along NH-117 at km 3.109 beside Moukhali Crossing by Jack pushing technique for water supply scheme within aided areas for Howrah Municipal Corporation in the State of West Bengal
  • Proposal for permisson (NOC) for road crossing of 2 nos of 33KV line and 3 nos of 11 KV line through 2 nos 3 core 400 Sq. m and 3 nos. sq. mm XLPE U/G cable respectively within 5 nos 150 mm dia G.I pipe for each cable under the soil of H-34 road at chainage 213.924 km near Dakhingram, Palsonda More, P.S- Nabagram, District–Murshidabad
  • Proposal regarding Permission of Cable Laying i.r.o. Construction of 132 KV S/C, 1-U/G cable line only as a spare from Raghunathganj 132 KV Sub-Stn. to Jangipur TSS point bulk power supply to Jangipur TSS
  • Proposal for permission of road crossing at Godutai Parulekar Nagar, Kumbhari water supply line scheme under Ekrukh Medium Project in the State of Maharashtra
  • Permission for laying of Optical Fiber Cable of 50mm Dia which is crossing Existing Ch.262.560 RHS and runs parallel for a route length of 21.29Km in LHS from Mandya Railway station to DRDO station at K.Shettihalli from Existing Ch.262.560 to Ch.258.320=4.24Km and Design Ch.104.400 to Ch.121.420=17.02km LHS in Six laning of Nidaghatta to Mysuru Section of NH-275 in the State of Karnataka
  • Proposal for crossing of 400 KV QMDC line between Km.77+000 to Km. 78+000 at Km.77+567 near Macharam Village in Jadcherla Mandal and Mahabubnagar District across Hyderabad to Bangalore section of NH-44 in the State of Telangana
  • Proposal seeking ROW permission for proposed laying of 300mm Dia DI Water Pipeline for Drinking Water across at Km 40+825 of NH-151 under the Junagadh-Vanthali RWSS (Part-2) near Shapur Bridge on NH-151 (Jetpur-Somnath) in the State of Gujarat
  • Permission for laying of 33KV underground power line crossing across and under highway tract Nagpur-Jabalapur Road, near JN Hospital Kandri (Godegaon Khadan), Teh- Parseoni, Nagpur Road under 100% DDF scheme under Mauda Division
  • Submission of National Highways Crossing proposal in r/o construction & laying of 220 KV Koradi -II-Butibori-III DCMC transmission line, NH-47, Nagpur-Saoner Road near Village Koradi, District- Nagpur, in the State of Maharashtra
  • Rehabilitation and Up-gradation of NH-209 from km 123.550 to Km. 150.400 of Dindigul – Bangalore Road (Pollachi to Coimbatore Section) to four lane with paved shoulder in the State of Tamilnadu under NHDP-IV on EPC Basis – Permission requested for laying of Public Utility–City Gas Distribution (CGD) Pipeline across NH-83 at Highway chainage 147/240 (Malumichampatti Junction)
  • Proposal for Access Permission of DW & SD Water Pipe Line Laying at Ghoranegi and adjoining villages Rural Water Supply Scheme, Saraikela- Kharsawan in the State of Jharkhand
  • Proposal for grant of permission for crossing NH for laying of PHED Pipeline across NH for work of Aug. of retrofitting of Water Supply project of Jal Jeevan Mission under PHED Div. Sujangarh crossing Salasar-Nagaur sec. of NH-65 (New NH-58) at Km. 55.860, Km. 58.400 & 60.500 (3 nos. crossings) by PHED
  • Proposal for NOC permission of LPG pipeline along with OFC cable for crossing by HDD method at Km.37.200 of NH-135A in vilage -Pachwal, Tehsil -Mariyahoo, District-Jaunpur in the State of Uttar Pradesh
  • Proposal for NOC permission of laying & crossing of water supply pipeline from Km.0.00 to Km. 07.489 along with NH-35 (old NH-76) (Kabrai-Varanasi road) by Open Trench & Trenchless Technology method in the State of Uttar Pradesh
  • Proposal for NOC permission of laying & crossing of water supply pipeline from Km.276.825 to Km.299.600 (in 8 parts) along with NH-35 (Prayagraj–Mirzapur Marg) by Open Trench & Trenchless HDD method in the State of Uttar Pradesh
  • Proposal for crossing of 400 KV QMDC line from proposed 400/220KV Maheshwaram SS to proposed 400/11KV Uddandapur LISS at Km 36+950 near Debbadaguda Village, Kandukur Mandal, across Hyderabad to Srisailam section of NH-765 in the State of Telangana
  • Rehabilitation and up gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388.376 to Km.428.074) of NH-200 (New NH-53) in the State of Odisha under NHDP-III & Rehabilitation & up gradation of existing two lane to four lane standards from End of Kamakhyanagar Bypass to Duburi section of (Km.335+946 to Km.388+382) of NH-53 in the State of Odisha under NHDP-III
  • Permission proposal for laying underground water supply pipe along the road from Km 18/400-18/610(LHS), Km 19/000-19/220(LHS), Km 19/265-21/415(RHS),Km 23/430-Km 23/926(LHS),Km 26/450-28/922(RHS) and crossing the road at Km 19/196, Km 19/198,Km 19/200,Km 19/510,Km 21/415,Km 23/926 & Km 26/450 of NH-230(New NH-85)(Madurai- Thondi road) in the State of Tamil Nadu-for providing CWSS to 8 Town Panchayats, 2452 Rural Habitations and bulk provision to 3 Municipalities in Sivagangai District
  • Laying of water supply pipeline of size various Dia HDPE pipeline along the road from Km.119/000 to Km.124/000; Km.125/130 to Km.126/800 (RHS) for a length of 6.670Kms and from Km.119/150 to Km.119/800 (LHS) for a length of 0.650Km by open Trench method & across the road in 6 locations at Km.118/200, Km.118/650; Km.119/800; Km.124/300; Km.124/750 & Km.126/800 by Trenchless Method in Thirumayam–Manamadurai section of NH-226 in the State of Tamil Nadu
  • Permission for road crossing by trenchless method-HDD at Ch 393+860 (Old Ch) for connectivity of proposed online CNG station under laying & construction of 12" steel pipeline network & associated works from Biaora (Indore Naka) to Narsinghgarh Naka pipeline section under city gas distribution Bhopal & Rajgarh GA
  • Permission for laying of water supply pipeline across NH at Km.306/715 – Across NH road for SRV Matriculation Higher Secondary School at Samayapuram in the State of Tamilnadu
  • Proposal for grant of permission for overhead transmission line crossing at Km. 194+00 to 194+100 near Village-Bhojera, Tehsil & District-Bikaner on Sangariya-Rasisar PKG-AJ/SR-07 of Amritsar-Jamnagar, NH-754K by 400 KV 2x D/C Line (Twin HTLS) Bikaner-II SEZ PP-Khetri Transmission line (Part-I) associated with transmission scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1 GQ) under Phase-II-Part-F through Tariff Based Competitive (TBCB) Route by M/s. PGCIL
  • Proposal for grant of permission for 400 KV D/C overhead transmission line crossing NH-8 (New NH-48) of Delhi-Jaipur road, at Km.115+00 & Km. 115+200 for Transmission Line Package TW04 for Sikar-2-Neemrana 400 KV D/C transmission line under Transmission scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1 GQ) under Phase-II-Part-C through Tariff Based Competitive (TBCB) Route by M/s. PGCIL
  • Construction of Six Lane access controlled highway (NH-152D) starting from Junction with Rewari-Kanina road (SH-24) near Kanina to Narnaul [Ch. 200+000 to 227 + 020; length 27.02 km] on EPC mode under Bharatmala Pariyojana in the State of Haryana (Pkg-8) - Crossing of 765 KV D/C Khetri-Narela TL under TBCB Transmission line package TW02 associated with transmission scheme for evacuation of Power from Solar Energy Zones in Rajasthan (8.1) GW under phase-II, Part-G
  • Permission for crossing of 66 KV overhead electric transmission line between Km 124/200 to km 124/3000 of NH-47 (Ahmedabad-Bagodara) in the State of Gujarat
  • Permission for accommodation of 66 KV electric line from existing LOC No. 02 to LOC No. 5 (Palanpur- Lalawada CKT-2 ) line across NH-58 (between km 158 to km 159) in the State of Gujarat
  • Permission for laying of water pipeline along the road on NH-34 (Old NH-86) from Km 123.900 to 127.600 for 400 mm dia along with NH-34 total length of 3.7 Km & 02 Nos. crossing at Km.123.900 and 131.280 on NH-34 in the State of Uttar Pradesh
  • Proposal for laying of 6" (150mm dia) - DI/HDPE/MS Pipe/ductile iron pipe, ch. 7.130 across NH-24 at (Near Metro Yard) along NH-24 (New NH-09)
  • Proposal for 11 KV XLPE cable U/G road crossing at Ch. 135+390 on NH-34 (Old NH-91), Village-Haridaspur Tehsil Koil & District- Aligarh in the State of Uttar Pradesh for erection of electric line towards Residential Colony Link City
  • Proposal for crossing of electric cable at Km. 290.420 through HDD method on old NH-1 (new NH-44) in the District Ludhiana, Punjab
  • NOC case for crossing of 300mm diameter pipeline at Km. 5.275 (LHS) on old NH-1A (New-44) (Jalandhar to Jammu Road) at Dalwal in the State of Punjab by HDD method
  • Proposal seeking ROW permission for laying underground Water Pipeline (Panam Lift Irrigation) across NH-47 at Km 131+407 at Village-Gadh, Taluka-Godhra, District-Panchmahal in the State of Gujarat
  • Proposal seeking ROW permission for laying of 220KV Underground Cable Line with 800 sqmm XLPE Power Cable from 220KV Balitha (Vapi) Sub-Station to proposed 220KV Vapi (Pariya) TSS (NHSRCL) Sub-Station with 1CX800 Sqmm (2X3) XLPE cable parallel to NH-48 between Km 361+870 and Km 360+750 for 220KV Vapi (Pariya) NHSRCL (Bullet Train) Sub-Station in the State of Gujarat
  • Proposal seeking ROW Permission for laying proposed MS, Water pipe line along and across NH-48 at Km 269+890 for providing basic Utility Service at Village-Baleshwar District-Surat in the State of Gujarat
  • Proposal seeking ROW permission for laying of Steel Gas Pipeline along NH-48 at 3 locations (i.e. (i) From Km 11+353 to Km 18+987 (LHS), (ii) From Km 11+353 to Km 11+985 (RHS) & (iii) From Km 11+985 to Km 12+185 (RHS) (Total Length 8+466 Km) and across NH-48 at Km 11+985 on Ahmedabad-Vadodara section of NH-48 in the State of Gujarat
  • Proposal seeking ROW Permission for laying 250mm Dia Water Pipeline along Ahmedabad-Vadodara section of NE-1 from Km 5+468 to Km 5+520 on LHS & from Km 5+468 to Km 5+520 & Across NE-1 at Km 5+520 in the State of Gujarat
  • Four laning of Panikoili-Rimuli section of NH-215 (New NH-20) from Km 0.000 to Km. 163.000 (Design Chainage Km.0.000 to Km. 166.173) in the State of Odisha, 4-L of 145.123 Km currently under Operation & Maintenance Stage and 21.05 Km under implementation stage through balance work project
  • Permission for laying of 75mm. dia & 140mm. dia HDPE water supply pipeline on BHS along the road and crossing of 75mm. dia HDPE water supply pipeline at Tembhurni under Jal Jeevan Mission Nagar Water Supply Scheme at Tembhurni on NH-65
  • Proposal for NOC for overhead crossing of 220 KV D/C transmission line (Barchhawa TSS Line) at km.12.290 of NH-931A (Salon to Jais section) in the State of Uttar Pradesh
  • Proposal for grant of permission for laying of underground MDPE gas pipe line along Delhi-Agra section of NH-2 between Ch.188+160 and 189+460(RHS) through HDD method at Artauni village in District-Agra, Uttar Pradesh
  • Construction of Six Lane access controlled highway (NH-152D) starting from Junction with Rewari-Kanina road (SH-24) near Kanina to Narnaul [Ch. 200+000 to 227+020; length 27.02 km] on EPC mode under Bharatmala Pariyojana in the State of Haryana (Pkg-8) - Crossing of Khetri-Bhiwadi 400 KV D/C Transmission line (Twin HTLS) associated with transmission scheme for evacuation of Power from Solar Energy Zones in Rajasthan (8.1) GW under phase-Il, Part-F, through Tariff Based Competitive Bidding (TBCB) route