1100.1 |
Min. distance between existing and proposed bridge |
10-07-1957 |
WI-48(18)/56 |
|
|
1100.2 |
Standard Procedure for Bridge Project Preparation |
18-01-1971 |
PL-2(1)/70 |
|
|
1100.3 |
Fixation of Alignment of Bridges and their Approaches |
29-01-1971 |
NHI-40(3)/71 |
|
|
1100.4 |
Need for Correlating all GTS Bench Marks |
02-07-1975 |
NHII/Misc/120/75(1) |
|
|
1100.5 |
Estimates for Construction of Bridges on NHs and Approaches thereto Submission |
20-03-1976 |
NHIII/MISC/120/75(I) |
|
|
1100.6 |
Coordination between Construction of Bridges and there Approaches |
20-03-1976 |
NHIII/MISC/120/75 |
|
|
1100.7 |
Guidelines regarding Construction of New Bridges at the Existing Sites |
09-12-1976 |
NHIII/P/75/76 |
|
|
1100.8 |
Bridges across Irrigation Canals |
14-01-1977 |
PL-67(35)/76 |
|
|
1100.9 |
Fixation of Deck level of High Level Bridges/ Culverts |
27-09-1977 |
NHIV-50(20/77) |
|
|
1100.10 |
Coordination between Construction of Bridges and there Approaches |
19-10-1977 |
NHIII/P/30/77 |
|
|
1100.11 |
Requirement for Integrated Project Planning for Bridges on Adjacent Streams |
25-02-1978 |
NHIII/P/30/77 |
|
|
1100.12 |
Reference for Bridge Project Preparation |
31-05-1978 |
NHIII/P/31/77 |
|
|
1100.13 |
Coordinated Completion of Realignment of NHs dictated by Submergence |
13-07-1978 |
NHIII/P/5/77 |
|
|
1100.14 |
Coordination with other Departments Regarding bridge Projects |
01-03-1979 |
NHI/Misc/84/78 |
|
|
1100.15 |
Coordination with Irrigation Authorities, Irrigation Dams-Road & Bridges Affected |
11-07-1979 |
NHVI/Misc/25/79 |
|
|
1100.16 |
Improvement/Reconstruction of Weak and Narrow Bridges |
06-10-1980 |
NHIII/P/13/80 |
|
|
1100.17 |
Norms for Working out Requirements of Materials for Bridges |
12-11-1980 |
NHIII/Misc/137/78 |
|
|
1100.18 |
Preparation of Detailed Project Estimates for NH Works |
30-12-1980 |
NHIII/P/10/80 |
|
|
1100.19 |
Survey and Investigations for Road/Bridge Projects |
03-05-1984 |
NHIII/P/2/84 |
|
|
1100.20 |
Modified Procedure for Submission of Estimates for Bridges costing more than Rs. 10 lakhs |
10-01-1985 |
NHIII/P/31/77 |
|
|
1100.21 |
Check Lists of points relating to Technical Appraisal Notes and Original Estimates for construction/reconstruction of ROBs on National Highways and other centrally Financed Schemes |
14-01-1988 |
RW/33047/12/ 87/NH(Std.) |
|
|
1100.22 |
Greater emphasis on adoption of improved technology in site investigation, design, construction condition assessment, repair and rehabilitation of important bridges on National Highways-Implementation of the Report of the Special Committee |
04-02-1988 |
RW/NHVI-50(3)/83-Vol.II |
|
|
1100.23 |
Siting of rail and road bridges |
02-03-1988 |
NH-11052/5/87-NHIII/ DI |
|
|
1100.24 |
Steps proposed for improvement in existing procedure for approval of design of bridges |
06-09-1988 |
RW/33044/2/88-DO II |
|
|
1100.25 |
Width of roadway on minor bridges on NHs |
04-01-1989 |
RW/NH-33044/2/88-DO II |
|
|
1100.25A |
Supplemental Measures for Design, Detailing & Durability of Important Bridge Structures on NHs and other centrally financed schemes |
17-04-1989 |
RW/NH-33044/2/88-DOII |
|
|
1100.26 |
Use of equipments in Bridge Construction on NHs and under other centrally sponsored schemes |
28-05-1989 |
RW/NH-33044/2/88-DO II |
|
|
1100.27 |
Width of roadway on minor bridges on NHs |
01-06-1989 |
RW/33044/2/88-D,O.II |
|
|
1100.28 |
Width of Bridges on NHs |
21-09-1990 |
RW/33044/2/88-D.O.II |
|
|
1100.29 |
Width of Bridges on National Highways |
09-05-1999 |
RW/NH-33044/2/88-S&R |
|
|
1100.30 |
Construction of Road Over/Under Bridges on Build, Operate and Transfer Basis (BOT) |
16-12-1999 |
NH- 15015/121/97-PL |
|
|
1100.31 |
Width of Bridge on two lane NH |
24-03-2009 |
RW/NH/33044/2/88-S&R(B) |
|
|
1100.32 |
Width of Bridge on 2 lane NH on Hills |
21-10-2009 |
RW/NH/33044/2/88-S&R(B) |
|
|
1100.33 |
Design and General Features for bridge structure to be constructed on National Highways |
02-09-2016 |
RW-NH-35075/9/2006-S&R(B) |
|
|
1100.34 |
Construction of a bridge cum barrage structures on National highways serving dual purposes i.e. to cross the water body as well as to store water on upstream side |
18-04-2017 |
RW-NH-34066/59/2015-S&R(B) |
|
|
1100.35 |
Project Preparation for ‘In Principle’ declared National Highways |
04-05-2022 |
RW/NH-33044/24/2020-S&R(P&B) |
|
|
1100.36 |
Guidelines on length of viaduct vis a vis RE Wall in flyover/ underpasses in urban/ built up areas |
30-01-2025 |
NH-24036/34/2023-H |
|
|