  1. About 1,120 km approved length [aggregate length- 1,087 km at an revised cost of Rs. 6,461 km] of NHs are to be improved to 2-lane NH standards following corridor development approach under the World Bank Loan Assistance in Phase-I.  Loan Agreement for Phase-I (1,120 km under first tranches of Loan Assistance of US$ 500 Million) was signed with World Bank on 1 July, 2014. 
  2. For the proposed execution of projects under World Bank Loan Assistance as mentioned above, the cost of LA and utility shifting are to be borne by the Government of India as per the policy of the World Bank. Till March, 2019, 857 km of length has been completed with total expenditure of Rs. 4,190 crore.
  1. About 7 projects having NH length of about 738 km are to be improved under the Loan Assistance from JICA at the cost of about Rs. 18,172 crore. For the proposed execution of projects the cost of LA and utility shifting are to be borne by the Government of India. Out of these 7 projects, 5 projects are to be executed by NHIDCL, 1 project each is being executed by the Ministry through State PWD (BSRDCL) and by NHAI.
  2. The Ministry has awarded 92.935 km, Gaya- Rajgir - Nalanda – Bihar Sharif section of NH 82 in the State of Bihar at cost of Rs. 925.87 crore. The loan component of this project is JP¥ 21.426 billion. About 39 km of length has already been completed of this stretch. The Project is likely to be completed by 2020-21.
  3. NHAI awarded 127 km, Patna – Gaya - Dhobi section of NH 22 in the State of Bihar at cost of Rs. 1,231.98 crore. The loan component of this project is JP¥ 22.903 billion. About 14.5 km of length has been completed so far. However due to poor performance of the Company as well as Company going to NCLT, the project has been foreclosed. Re-award is in process.
  4. Remaining 5 projects are with NHIDCL. One project has started and bids for one project has been invited. Bids for another one project are to be invited. Remaining 2 projects are in pre-construction phase and are yet to be awarded.

The Ministry has awarded 2 projects of about 127.84 km length in the State of West Bengal at revised cost of Rs. 1,658.73 crore. The loan component of this project is US$ 145 Million. Works on 125.60 km has been completed at an expenditure of Rs. 1,301.48 crore as on April, 2019.


Externally Aided Projects (EAP) Documents
क्रमांक Category Subject दिनांक
1 Green National Highways Corridor Project (GNHCP) उत्तर प्रदेश राज्य में राष्ट्रीय राजमार्ग 92 के बेवर से इटावा भाग का सुधार एवं उन्नयन कार्य के लिए पुनर्वास कार्य योजना का कार्यकारी सारांश (1,004.48 Kb application-pdf)
16-08-2022
2 Green National Highways Corridor Project (GNHCP) विश्व बैंक की ऋण सहायता से हरित राष्ट्रीय राजमार्ग कॉरिडोर परियोजना (जीएनएचसीपी) के तहत हिमाचल प्रदेश राज्य में एनएच-70 के हमीरपुर-मंडी खंड (किमी 141.000 से किमी 250.592) के 2-लेन विन्यास का पुनर्वास और उन्नयन के लिए पुनर्वास कार्य योजना का कार्यकारी सारांश (1.88 Mb application-pdf)
31-05-2022
3 Green National Highways Corridor Project (GNHCP) उत्तर प्रदेश राज्य में राष्ट्रीय राजमार्ग 730 C और 731K के बेवर से पीलीभीत भाग का सुधार एवं उन्नयन कार्य के लिए पुनर्वास कार्य योजना का कार्यकारी सारांश (1.51 Mb application-pdf)
08-03-2022
4 Green National Highways Corridor Project (GNHCP) जी एन एच सी पी के लिए पुनर्वास नीति के कार्यकारी सारांश एवं पात्रता मैट्रिक्स का हिंदी व् तेलुगु संस्करण (359.39 Kb application-pdf)
04-03-2022