  • Proposal for crossing of water supply line for Bhors Bk. Supply Scheme Ta. Chalisgaon, District-Jalgaon crossing at Km. 410.610 of NH-211
  • Proposal seeking ROW permission for lying of 12" Dia underground Natural Gas Pipeline alongwith OFC through ROU (Right of User) and across NH-208 for proposed Agartala-Tulamura Natural Gas Pipeline under NH-208 in the State of Tripura
  • Request for Right of way permission for laying of Under Ground Water Pipe Line along the NH boundary from km 177/234 to km 177/884 on RHS. and across the Road at km 177/609 using Dia 76.2mm PVC water pipe using in Dia 152.4mm MS casing pipe on NH-544 (Salem-Cochin Section)
  • Construction 4 lane Flyover on NH-6 integrated with ROB's & river bridge including approach ramps, service roads, footpath over RCC utility duct from Pardi Octroi Naka to Itwari (Ch. 5441665 to 548/065) & inner Ring Road from Manewada to Kalamna (Ch. 201760 to 231190) & from Rani Prajapati Square to Vaishno Devi Square (Ch.00/000 to 00/596) including RUB on L.C. No. 71,72 & connecting inner ring road junction to APMC Kalamna market Gate No. 1 & 2, Nagpur, Maharashtra on EPC Mode-Access Permission for crossing 700mm dia water pipeline across Kalamna Road at km 22.600 (Bharat Nagar Square) at Parli, Nagpur
  • Proposal for permission of laying 4'' Dia of Carbon Steel Gas Pipeline along/ across NH-34 (Ghaziabad Aligarh Section) from Ch. 96.740 to 96.953 (LHS) including 1 crossing at Ch 96.740 to develop CGD network in Khurja in the State of Uttar Pradesh
  • Permission for 33 KV overhead from km 410.885 to km 411.480 (595M) & additional 11 KV underground from km 411.050 to km 411.170(120M) Electric utility line on Yavatmal-Wardha Road at village Dolamba, Ta.- & District-Yavatmal in the State of Maharashtra
  • Proposal seeking ROW permission for laying 220KV D/C Wagra TSS Line across Vadodara Mumbai Expressway between Km 295+000 and Km 295+100 at Village-Derol, Taluka-Bharuch, District-Bharuch in the State of Gujarat
  • Permission for crossing of 400 KV Double Circuit Twin mosse Transmission Line (S/C string on D/C Towers) from Kodumur PSS to Central Pooling Switching Station across Hyderabad–Bangalore section of NH-44 at Km.235.230, Near Ullindhakonda Village, Kallur Mandal, Kurnool-District in the State of Andhra Pradesh
  • Proposal for erection of 2.0 MW Over Head Transmission (22 KV) in 6 Lay Power Cables Line & Poles along the ROW from Km 41+050 to Km 41+180 on RHS, from Km 41+180 to Km 42+500 on LHS and across the road at Km 41+180 on NH-209 in the State of Tamil Nadu
  • ROW Permission for laying of OFC in Rajgir Section Near Hotel Diamond at Ch. 72+640 to Near Natraj Filling Station at Ch.73+950 on NH-82 (Total length 1.310) by M/s Bharti Airtel Ltd. in the State of Bihar
  • Permission proposal laying underground 3km long 12.75 inch dia City Gas distribution network and 125mm dia MDPE (Medium Density Poly Ethylene) pipeline along with 40mm OFC duct from km 0/000 to km 3/000 (between Sharjapur to Bagalur) along NH-648 (Old NH-207) in the State of Tamil Nadu
  • Proposal for laying of 11 KV 300 sqmm, 3-Core XLPE under ground HT cable across the NH-44 at chainage in km. 104.700 on Nagpur-Hyderabad section near Pohana Tower village, Ta. Hinganghat, District-Wardha for existing supply near 33 KV Pohana, Sub-station to new 11 KV Pohana feeder connection
  • Proposal for laying of 11 KV 300 sqmm, 3-Core XLPE underground HT cable across the NH-44 at chainage in km 105.300 on Nagpur-Hyderabad section near Pohana Gas Office village, Ta. Hinganghat, District-Wardha for existing supply near 11 KV Pohana, Sub-station to new 11 KV Pohana feeder connection
  • Laying of TWAD Water pipeline along the road from Km.0/000 to Km.0/500 (RHS), Km.94/000 to Km.94/180 (RHS), Km.94/255 to Km.96/860 (LHS), Km.96/050 to Km.96/860 (RHS) by Open Trench method & across the road in 2 locations at Km.96/050 & Km.96/860 by HDD Trenchless Method on Karaikudi–Ramanathapuram section of NH-210 (New NH-536)
  • Permission for laying of underground optical fiber cable (40 mm dia duct pipe) by “Tata Communications Limited” from route Km. 20+316 to Km. 24+732 (RHS) & Crossing at Km. 24+732 on National Highway No. 8 (New NH-48) of Delhi-Jaipur Road
  • Trichy–Madurai section of NH-38-TWAD Board–Improvement of existing CWSS to Pudukottai Municipality, 3 Town Panchayats and 15 wayside habitations in Pudukottai District–Permission for laying of water pipeline along the road from km.25/850 to km.27/280 (LHS) and across at km.25/850
  • Approval for crossing of water supply pipe line of various size under Jal Jeevan Mission on NH-52 (Jhalawar-Aklera route) in the State of Rajasthan
  • Proposal for permission from NHAI for laying/ crossing of DI pipeline on/along NH-25 of 150mm DI at Chainage 0.65m near Bhojpura village, 150mm DI at Chainage 1.65Km near Shivnathpura village and 200mm DI at Ch. 4.10 Km. near Badiya Jagga village under Regional Water Supply Scheme (under Jal Jeevan Mission) P.S. Jawaja, Tehsil-Beawar, District-Ajmer in the State of Rajasthan
  • Proposal for grant of NOC for laying 350mm dai. DI Water pipe road crossing National Highway on NH-25 (Bar-Bilara-Jodhpur) in Kin, Stone no. 232+950 (RHS) of Village-Dantiwara, Tehsil-Jodhpur in the State of Rajasthan
  • Permission for laying of HDPE pipe for crossing of 11KV electrical line at Km. 213.005 (LHS & RHS) on NH-21 (Bassi to Jaipur) at Village Mansarkhedi, Tehsil-Bassi, District-Jaipur in the State of Rajasthan
  • Permission for laying of water pipeline along the existing road at Km.183/700 to Km.183/760 (2 line) (LHS) & across Km.183/700 of NH-45A for a total length of 190m in Karaikal District
  • Permission for Laying of Underground Optical Fiber Cable/ Duct 40mm dia HDPE Duct Pipe) by "Tata Communications Limited" from route KM. 0+000 to Km. 5+600 (RHS) on National Highway no. 248BB, Dwarka Expressway
  • Proposal for laying of 11 KV 300 sqmm, 3-Core XLPE underground HT cable across the NH-44 at chainage in km 99.100 on Nagpur-Hyderabad section near Pipari Village(Substation), Ta. Hinganghat, District-Wardha for existing supply near 11 KV MEL feeder connection
  • Permission for crossing of 600 mm dia water pipeline with 65mm dia OFC Duct through 1000 mm dia casing pipe from LHS to RHS of NH-520 at Ch.243+470 Km in Koida to Rajmaunda Section for drawl of water from River Kurarhi at village Badarama under Koira Tahsil in Sundargarh District to Kamanda Steel Plant of M/s Rungta Mines Limited
  • NOC for laying of 150mm, 200mm & 250mm diameter water supply pipeline (DI pipe along the Highway & MS pipe with cement lining & encasing for crossings) for the project of “Public Health Engineering Sub-Division, Badhra, Charkhi Dadri” along NH-334B from Km. 197.800 to 203.710 and from Km. 214.400 to 219.050 (Total Length=10560m) with crossings at Km. 208.158 & 214.400 on NH-334B in Tehsil Badhra, District-Charkhi Dadri (Haryana)
  • Proposal for laying of 6” NB Carbon steel gas pipeline from Km. 6.460 to Km. 6.550 (LHS) & from Km. 8.000 to Km. 8.040 (LHS) and highway crossings at Km. 5.600, Km. 6.550 & Km. 8.000 through existing utility ducts of 600mm on NH-444A in district of Ambala in the State of Haryana
  • Proposal for laying of 8” Carbon steel gas pipeline of M/s IGL from Km. 134.400 to Km. 151.000 (LHS) and highway crossings of 4” dia. at Km. 134.400 & Km. 151.000 through HDD method on NH-1 (new NH-44) in District of Karnal in the State of Haryana
  • Proposal for permission for laying of GAIL’s 125 mm dia MDPE & 4” steel pipeline for Ranchi City Gas Distribution Network along NH-75E
  • Proposal for permission for crossing of Nuadiha-Chhatarpur Transmission Line at km 57.838 of NH-98
  • Proposal for laying of Public Utility-Liquefied Petroleum Gas Pipeline (LPG) 8” Carbon Steel Pipeline with OFC cable in HDPE duct (50mm) along NH-44 of decreasing chainage from km. 203/500 - Km 194/0 (RHS) from Kandampatty to Karuppur for a total length of 9.5 km by Open Trench & HDD Method in the limit of NHAI Salem by M/s Kochi Salem Pipeline Project (KSPPL), Coimbatore
  • Proposal for laying of Public Utility-Liquefied Petroleum Gas Pipeline (LPG) 8” Carbon Steel Pipeline with OFC cable in HDPE duct (50mm) along NH-544 of decreasing chainage from Km 8/560-Km 8/0 (RHS) and Km 8/0-Km 0/400 (LHS) from Ariyanur Junction to Salem for a total length of 8.160 km by Open Trench & HDD Method in the limit of NHAI Salem by M/s. Kochi Salem Pipeline Project (KSPPL)
  • Proposal for laying of 33KV electrical Overhead line by TS TRANSCO, Hyderabad from Km.54+800 to Km.62+200 (LHS) along Hyderabad to Vijayawada section of NH-65 in the State of Telangana
  • Proposal for construction of 400 KV M/C (Twin HTMLs) Navsari (New) South-Gujarat-Magarwada (CP) Transmission line crossing NH-64 at km 373/300 in eru Dandi road in Navsari District in the State of Gujarat
  • Permission for laying 14" dia Carbon Steel Pipeline along with fiber cable in HDPE duct across ROW of EPE at Km.117+650 in Jhalaka Village of District-Palwal in the State of Haryana
  • Proposal seeking ROW permission for Overhead Crossing of NH-48 at Km 324+405 between Rola & Sonwada Villages for construction of 400KV M/C (Twin HTLS) New Navsari-Magarwada Transmission Line in the State of Gujarat
  • Proposal seeking ROW permission for Overhead Crossing of NH-48 at Km 355+377 between Udvada & Bhagwada Villages for construction work of 400KV M/C (Twin HTLS) New Navsari-Magarwada Transmission Line in the State of Gujarat
  • Proposal for overhead crossing of NH-64 at Km. 372/530 for construction of 765 KV D/C Navsri (New) Padghe Transmission line in Eru-Dandi road in Navsari District in the State of Gujarat
  • Permission for laying & crossing of Environment Friendly Natural Gas Steel and MDPE pipeline along and across National Highway with OFC in Chakiya Muzaffarpur section of NH-28 (New NH-27) & Darbhanga OMT-20 section of NH-57 (New-27) in LHS in Muzaffarpur district covering length 23.470 Km.
  • Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Malout Bypass from Ch. 80+200 Km to Abohar Section CH. 58+400 Km. (New CH. 44+500 to CH. 66+300 Km) along LHS Approx. 21.8Km.
  • Permission for laying of 12 Carbon Steel Gas Pipeline Along/Across the NH-07 from Abohar Bypass from Ch. 66+300 Km to Abohar Bypass (Ganganagar side) Section CH. 76+500 along LHS Approx. 10.200 Km.
  • Permission for laying of 125mm Dia MDPE Pipeline for Dabwali PE connectivity Sirsa (A) Across NH Ch KM. 34/111, Km. 34/49 (B) Along NH CH KM 32/840 to 32/650 (LHS), KM. 32/840 to 33/665 (RHS), KM 32/980 to 33/569 (LHS), Km. 33/812 to 34/311 (LHS), Km. 33/705 to 34/500 (RHS) for NH-09 within RoU in Dabwali Village of Mandi Dabwali Thesil of Sirsa District falling under your jurisdiction
  • Permission for Crossing of 400 KV double circuit twin moose transmission line from Kodumur PSS to Central Pooling Switching station at Km.328.253 i.e., between the KM stones 328.250 to 328.400 from LHS to RHS of NH – 40 near Hussainapuram village, Orvakal Mandal in Kurnool District
  • Permission for Crossing of 400 KV double circuit twin moose transmission (S/C strung on D/C Towers) line from 400/300 KV Alamuru PSS to Central Pooling substation Near Somayajulapalli village, Orvakal Mandal in Kurnool District at Km. 322.689 of NH-40
  • NOC case for laying of Gas Pipe Line of “M/s. Indraprastha Gas Limited (IGL)” (4”Dia Carbon Steel Pipe) from Km. 33+000 RHS to Km. 36+235 RHS (Length 3235m) and One Crossing at Km. 36+235 (Length 90.0m), (Total Length 3325m) along Delhi-Meerut Expressway (NE3) (Dasna to Meerut Road), in the State of Uttar Pradesh
  • Request for Right of Way (ROW) approval for installing Pole Infrastructure at Junctions on NH-44 (Pathankot Chowk, PAP Chowk, Gujja Peer Chowk, Lamba Pind Chowk, Sanjay Gandhi Nahar Pulli, Sanjay Gandhi T Point, Aman Nagar road near GP Tower T point, Rama Mandi Chowk and Paragpur Chungi in the State of Punjab
  • Proposal for laying of Proposed Sewerage Pipeline for Residential Colony named “Eldeco Estate One” from Ch. 322.707 to 323.442 (RHS) of length 735 m along NH-01 (New NH-44) at Village Hussainpura and Bhattian on Ludhiana-Jalandhar Road, Tehsil & District-Ludhiana in the State of Punjab
  • Laying of water supply pipeline by crossing the NH road at Km.117/989 of Trichy Bypass (connecting Thuvakudi–Mathur–Panjappur) on NH-83 (Old NH No.-67)
  • Proposal for approval of overhead Crossing of 400KV DC line Gadag-Narendra (New) solar power transmission line at Km 62.170 near Mushikeri village Gajendragad taluk, Gadag district of NH-367 Bhanapura-Gaddanakeri section in the State of Karnataka
  • ROW Permission for laying 26" Dia (660 mm) Crude Oil Pipeline with 32 inch Casing Pipe along with 40 mm dia Optical Fiber Cable with 89 mm MS Pipe through HAB Method across NH-114 at Km 62.647 under NH Division-XII for proposed Paradip-Numaligarh Crude Oil Pipeline Project
  • Permisssion for laying of 273 mm OD X 6.4 mm WT CS Natural Gas Pipeline along with 40mm OFC duct along NH-53 from chainge 0.000 to km. 21.693 km. from Chandikhole to Kusunpur and across at chainge 0.767 km. near sunguda village and at chainge 15.400 near Nalipur Village on NH-53
  • Proposal for laying of underground irrigation pipeline (Lower Suktel Irrigation Project) across NH at km 70/497 of NH-26 and at km 6/445, km 12/720, km 21/725 & km 24/540 of NH-57 in Balangir District in the State of Odisha
  • Proposal seeking ROW permission for laying of 900mm U/G Class NP-3 Drainage Line along NH-48 from Km 260+830 to Km 261+630 on RHS, Village-Kadodara, Taluka- Palsana & District-Surat on Bharuch-Mumbai section of NH-48 in the State of Gujarat
  • Proposal seeking ROW permission for Laying for 66KV IC, 630 sqmm 2x(3+1) XLPE Power Cable from 220KV Vapi Sub-Station to feed power supply to new proposed 66kv Vatar Sub-station 1 no. of Crossing at Km 362+135 (between Km 362+000 to Km 363+000) and Parallel laying from Km 362+500 to Km 362+135 of NH-48 on LHS, Village-Balitha, Taluka-Vapi, District-Valsad in the State of Gujarat
  • Submission of revised Proposal with correction of Single circuit line along NHAI & 11KV UG cable for road crossing on NH-65 road for location – 1) Near Tandulwadi Bus Stand for 11KV Tandulwadi feeder Ch. 268/100. 2) Near Tandulwadi Bus Stand for 11KV Sangdari feeder Ch. 268+100. 3) Near Bharat Petrol Pump for 11KV Boramani feeder Ch. 265/750. 4) Near Bhagwati Agro Ch. 261/500
  • Four Laning of Walayar-Vadakkencherry section of NH-544 in the State of Kerala-Laying/ crossing of Natural gas pipeline on NH-544 by M/s Indian Oil-Adani Gas Pvt. Ltd. (IOAGPL) from Km. 191+900 to Km. 205+050 (laying from Km.191+900 to 192+940-LHS, Km. 192+940 to Km.193+575-LHS, Km.196+340 to Km.196+940-LHS, Km.200+900 to Km.205+015-LHS Km.192+940 to Km.200+900-RHS. Km. 204+760 to Km.205+015-RHS and crossings at Km.192+940 from LHS to RHS & at Km.205+015 from LHS to RHS) for a total length at LHS is 6.390Km, at RHS is 8.215Km and crossing length is 0.185 Km
  • Proposal for Right of Way permission of crossing of 2900 mm, 2200 mm, 315 mm & 280 mm dia water pipe line across NH-934 Bina-Sagar road at Banhat km. 121/4, Silodha km. 128/10, Jarwas (Khurai bypass) km. 130/2 & 132/6 villages, tehsil-Khurai, District-Sagar, under Bina Complex Irrigation and Multipurpose Project in the State of Madhya Pradesh
  • Regarding NOC for road crossing and restoration for laying of water pipeline on NH-80 at Km. 132.860 to 135. 160 and Km. 140.07 to 140.757 by BUIDCO, Bhagalpur in the State of Bihar
  • Six laning of NH-5(New NH-16) Tangi to Bhubaneswar km. 355.0 to km. 414.0 in the State of Odisha under EPC mode-Permission for crossing of pipeline and Optical Cable for Drink from Tap & 24x7 water supply project at Khordha Municipality
  • Permission for overhead crossing of Jhansi–Kanpur highway on NH-27 between Km. 1565+800 to Km. 1565+900 of 132 KV D/C Gujare (Solar Plant)–Pukhrayan Transimission Line in the State of Uttar Pradesh by U.P. Power Transmission Corporation Ltd.
  • Proposal seeking ROW permission for Overhead Crossing NH-48 at Km 227+600 to Km 227+800 for construction work of 765 KV D/C Ahmedabad–Navsari Transmission Line (Part–II) associated with Transmission Scheme for evacuation of 4.5 GW RE injection at Khavda PS under Phase-II Part-C in the State of Gujarat
  • Proposal for approval of laying “Punjab State Power Corporation Ltd.” Electrical cable from Km. 349.330 to Km. 352.533 (LHS) Length 3203m, on Delhi to Amritsar, Punjab (overhead method) on NH-01 (New NH-44) on LHS in the State of Punjab
  • Proposal for grant of Permission to Garden Enclave Connectivity (Golden Gate to Garden Enclave–I & II) for laying of 125 mm dia PE Natural Gas Pipeline from GGL’s existing pipeline near Amritsar city & its surrounding area along on NH-01 (New NH-03) Jalandhar-Amritsar Section from Km 449.620 to Km 450.460 (LHS) (Golden Gate to Garden Enclave–I), Km 449.670 to Km 450.020 (RHS) (Golden Gate to Garden Enclave–II), and crossing of NH at Km 450.340 (Total Length–1.19 Km) near Amritsar in Tehsil & District–Amritsar in the State of Punjab by HDD Method
  • Proposal seeking ROW permission for erection of 33KV poles of Ampura-Khowai & Dhalabil Kalyanpur line along the NH-208 (Khowai Harina P-l) in the State of Tripura
  • Proposal seeking ROW permission for erection of 33KV poles of Agartala Mohanpur line along the NH-108B (Agartala Khorvai P-l) in the State of Tripura
  • Proposal seeking ROW permission for erection of 33KV poles of Hezamara-Dhalabil line along the NH-108B (Agartala-Khowai P-II) in the State of Tripura
  • Permission for laying of 132 KV Renigunta-Puttur Double Circuit XLPE UG cable along NH-71(Madanapalli to Naidupeta Road) from 125/6 KM to 127/3 KM including proposed Renigunta-Naidupeta 6-Lane NH from Km.1.100 to 1.950 for a total route length of 1649 mtrs including HDD crossing with 250 mm HDPE along Renigunta-Naidupeta Section of NH-71 in the State of Andhra Pradesh
  • Proposal for permission for laying Natural Gas pipeline on NH-47 from km 2/8 to km 6/4 (Devguradia to Maa Renuka Dhaba) Total length of 3.700 Km by M/s Avantika Gas Limited, lndore in the State of Madhya Pradesh
  • Permission for laying steel gas pipeline/125mm MDPE pipeline in common trench along with OFC for city Gas Distribution project, Purnea along and across NH-131A from Katihar more to Belauri Chowk (NH Chainage Km 52.830 to Km 55.00)
  • Six Laning of Pune-Satara section of NH-4 from Km 725.000 to 865.350 (Length Km 140.350) in the State of Maharashtra to be executed as BOT (TOLL) on DBFOT pattern under NHDP Phase V- Proposal for grant of permission for laying water pipeline crossing at Km. 849+75 (Sus Mhalunge) across NH-48
  • Proposal for requesting permission for laying optical fiber cable and 40 mm 2 HDPE Pipe from Km. 00/000 to Km. 11/400 (Talegaon Dabhade to Dehu Cross Road) on LHS along NH-548 D
  • Proposal of M/s Gujarat Gas Limited for permission for laying 4” dia Steel pipeline to set up a piped natural gas distribution network in Pardi taluka & surrounding area of Valsad district across to NH-848 (Pardi-Chival-Jogvel road) at Ch 4.340 in village Kumbhariya, Taluka-Pardi, District-Valsad in the State of Gujarat
  • Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Malout Bypass from Ch. 80+200 Km to Abohar Section CH 58+400 Km. (New CH. 44+500 to CH. 66+300 Km) along LHS Approx. 21.8 Km.
  • Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Abohar Bypass from Ch. 66+300 Km to Abohar Bypass (Ganganagar side) Section CH. 76+500 along LHS Approx. 10.200 Km.
  • Proposal of Hindustan Petroleum Ltd. for ROW permission for laying Haldia–Panagarh LPG Pipeline of 10" NB dia (254 mm) with 16” diameter(406 mm) casing pipe along with 6” dia (153 mm) for OFC (conduit) across NH-116B (Nandakumar-Contai-Chandaneswari) at km 1.465 at Village-Bhabanipur-73 in the District of Purba Medinipur, West Bengal
  • Proposal of “West Bengal State Electricity Transmission Ltd. (WBSETCL) regarding ROW permission for crossing in between Tower Loc No.- AP-16/0(DD+3) to AP 17/0 (DD+15) over NH-60 (New NH-14) crossing at km 153.807 in between km 153.00 to km 154.00 in respect of “Construction of 132 KV D/C from Chandracona Road 132 KV Substation to propose Goaltore 132 KV Substation”
  • Proposal seeking ROW Permission for laying of 11KV Line across NE-1 (Ahmedabad-Vadodara section) at Km 57+950 & Km 57+800, Village-Samarkha, Taluka & Distirct-Anand in the State of Gujarat
  • Proposal seeking ROW Permission for laying of 450mm Dia Water Pipeline across National Highway-48 at Km 15+400 on Ahmedabad-Vadodara section of NH-48 in the State of Gujarat
  • Proposal seeking ROW Permission for laying of 1800mm x 16mm (with casing of 2500mm) Thick MS Carrier Water Trunk Main Line across NE-1 at Km 4+750 on Ahmedabad-Vadodara section of NE-1 in the State of Gujarat
  • Proposal for laying of underground cable crossing NH-6 km 281.100, km 284.758, km 292.521, km 291.950 & km 296.200 using HOD method
  • Proposal seeking ROW Permission for Crossing NH-53 Hazira-Palsana Highway by exiting 66KV Overhead Tower Line D/C Panther Tower with ASCR Panther Conductor for 66KV D/C Navsari Eklera Line at Km 36+710, near Sachin Over Bridge Bypass Surat in the State of Gujarat
  • Proposal for permission for laying of 11 KV Electric Underground cable road crossing Ch. Km 96.000 & km 102.659 (Total length 120m) under RDSS Scheme of Ausa-Chakur section of NH-361 in the State of Maharashtra
  • Proposal for laying of 11 KV underground Cable across National Highway at village Wani Rambhapur
  • Four laning of Amravad-Chikhali section of NH-6, Package-I [km 160.000 (Near-Amravati) to km 220.000 (Near Kurankhed)- Proposal for laying of 11 KV underground Cable across National Highway at Village-Anbhora
  • Submission of proposal for permission of erecting and maintaining 11 KV underground power line across the Highway track on Highway crossing location on NH-53 for RDSS Scheme under Mouda Division
  • Permission for lowering & laying of 600mm Gl Water Supply pipeline highway track on Wardha Nagpur Road from Umred Bypass Junction, Tah. Nagpur(Rural), District-Nagpur in Arut 2.0 Scheme
  • Proposal for laying of 11 KV underground electrical cable crossing from (i) km 26.750 near Dhamna village (ii) km 30.100 near Satnavari Village (iii) km 24.100 near Peth (iv) km 34.600 Fun & Food Village & (v) km 54.600 Patel Swanill Masod crossing in Nagpur Kondhali section of NH-6
  • Proposal for permission for laying of 11 KV Electric Underground cable road crossing at Ch. Km 48.020 & km 48.200 on NH-361 under RDSS Scheme of Tuljapur-Ausa section of NH-361, Total length-120m in the State of Maharashtra
  • 4/6 Ianing of Bodhare to Dhule section from km 390.000 to km 457.231 (Design Chainage) of NH-211 (New NH-52) (Design length-67.231) in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode- Proposal for permission for installation of 11 KV HT cable for crossing on NH-52 Highway under MSEDCL Chalisgaon R1 & R2 submission of Chalisgaon Division
  • Proposal for permission for laying of 11 KV Electric Underground cable road crossing Ch. Km 63.600 & km 66.170 (Total length 120m) under RDSS Scheme of Ausa-Chakur section of NH-361 in the State of Maharashtra
  • Proposal for permission for laying of 11 KV Electric Underground cable road crossing Ch. Km 67.150, km 82.500 & km 91.100 on NH-361 under RDSS Scheme of Ausa-Chakur section of NH-361, total length-180m in the State of Maharashtra
  • Proposal for permission for laying of 11 KV 300 sqmm 3 Core XLPE underground HT cable across the NH-44 at ch. 59.165 on Nagpur-Hyderabad section near Shedgaon Fata
  • Proposal for laying of 11 KV underground electrical cable crossing at NH-161 at Eight no. locations under Ta. Patur, District-Akola in the State of Maharashtra
  • Proposal for permission for laying of 11 KV Electric Underground cable road crossing Ch. Km 28.950, km 30.400, km 33.950, km 36.230, km 38.730, km 41.320, km 48.400, km 49.800 & km 51.300 on NH-361 under RDSS Scheme of Tuljapur-Ausa section of NH-361, Total length-540m in the State of Maharashtra
  • Submission of proposal for permission of laying of 11 KV 95 sqmm underground Cable across the Highway NH-353D(Nagpur-Umred) at 4 locations for 11 KV Adhyali Feeder under RDSS Ag FS Scheme under Congress Nagar Division
  • Proposal for permission for laying & crossing of water pipeline from Janapuri to Derla & Chainage from km 192.920 to km 196.360 (LHS), Crossing @ Ch.192.920 under Jal-Jeevan Misison, Telki Water Supply Scheme in the State of Maharashtra
  • Proposal for permission for laying of 11 KV 95 sqmm UG Cable across the highway on NH-44 (Nagpur-Chandrapur Highway) near Sagar Bar for 11 KV Tembhari Feeder and near Nirmal Jinning & Processing for 11 KV Brahmni Feeds under EDSS AG FS Scheme under Butibori Division
  • Permission for proposal for fixing Pole line at km 401.715 to km 402.300 on LHS (along 585 km on road) on section of National Highway-361 Yavatmal City Water Supply Scheme
  • Proposal for laying proposed 125mm Dia Natural Gas Pipeline along/ across on NH-734 (Moradabad-Kashipur Road) Along from Ch. 349.275 Km to Ch. 353.890 Km (RHS) & Ch. 350.550 Km to Ch.352.250 Km (LHS), Across at Ch. 350.745 km to develop CGD Network in Moradabad District of Uttar Pradesh
  • Widening of existing 2 lane carriageway to 4/6 lane carriageway configuration for Dhule–Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra–Proposal for Crossing 800mm dia. Water Supply Pipeline across NH-3 near Shirwade Phata at Km. 378.240