Sorry, you need to enable JavaScript to visit this website.

You are here

  • Proposal for Overhead Crossing of 33KV DCDS line over NH-53 between Ch.110.000 & Ch.111.000 near Village- Chatigirola, District-Mahasamund (C.G) by M/s Clean Max Surya Energy Pvt. Ltd.
  • Proposal for the permission for laying of 66 KV BSES cables to infeed Bakkarwala Grid in Package 2 (UER-II) from Ch. 23+700 to 24+300 (LHS & RHS) in the State of Delhi
  • Proposal for permission for laying of HDPE pipe for crossing of traffic light (50mm cassing dia pipe) at Saras Km, 54.250, 54.280, 54.260, Ghana at Km. 54.920, 54.950, 54.940, Sisam tiraha at km. 55+250, 55+280, 55+270 on NH-21 at Bharatpur (Rajasthan)
  • Laying of water supply pipeline between km 18.765 to km 34.140 & crossing at km 20.200, in the State of Maharashtra
  • Permission for Proposal of M/s RWSS for laying and crossing of Rural Piped water supply project on NH-53 pertaining to 13 GPs Kamakhyanagar & 3 GPs Parjang Block District-Dhenkanal, in the State of Odisha
  • Permission for Proposal of M/s RWSS for laying and crossing of Rural Piped water supply project on NH-53 pertaining to 26 GPs Parjang & 9 GPs Kankadahada Block in District-Dhenkanal, in the State of Odisha
  • Permission for Proposal of M/s RWSS for laying and crossing of Rural Piped water supply project pertaining to 26 GPs Parjang & 9 GPs Kankadahada Block, District-Dhenkanal in the State of Odisha
  • Proposal for the NOC/ permission for establishment of overhead Gantry at NH-44 (GwaliorJhansi section) Km 1260.130 & 1265.400 and NH-27 (Shivpuri-Jhansi section) km. 1370.100 & 1373.400under Jhansi District in the State of Uttar Pradesh
  • Proposal for laying of Optical Fiber Cable (OFC) along Phulwari MS-6.4 Km Near Gate AIIMS Hospital, Patna to MS-2.6 Km Tumtum Padao on NH-98(New NH-139) in the State of Bihar Covering total stretch of 3.8 Km. of Land
  • Proposal for laying pipelines Solapur of National Highway 09-Maharashtra Karnataka border segment that 249+00 to 37+400 to Naldurong Water Supply Scheme under the Central Government sponsored Amrit-2 project in Village-Tuljapur in the State of Maharashtra
  • Proposal for permission of crossing of 11 Kv XLPE underground cable at km 372.800, in the State of Maharashtra
  • Proposal for permission of laying of water supply pipe from 197.020 to km 198.400 on RHS,
  • Proposal of M/s Sabarmati Gas Limited for laying 12" dia steel gas pipeline along NH-147 (Mota Chiloda-Gandhinagar road ) from design ch 0/000 to ch 0/200 LHS along gas pipeline from Nana chiloda tap off stain to Mota chiloda pipeline connectivity in Gandhinagar District, in the State of Gujarat
  • Proposal of M/s BSNL regarding RoW permission for laying of 1 nos. 40mm dia HDPE duct OFC Km 183.587 to 199.200 (Chichira-Bahragora) (Total Length-15.613Km) of NH-49 (RHS) by HDD method in the District of East Singhbhum, Jharkhand
  • Permission for Overhead crossing by 400KV DC (Twin HTLS) on National Highway Barmer-Bagundi section of NH-25 at Chainage 33.099 at Village-Baniya Dhora, Tehsil Baytu, Dist.- Balotra in the State of Rajasthan by M/s Rajasthan-IV A Power Transmission Limited
  • Proposal for grant of permission for laying of Optical Fiber Cable on NH-30 from Km.76+800 to Km.81+500 (along RHS) and 01 no. road crossing at Km.76+800 (total section ROW apply for length 4.700 Km)
  • Permission for Sewarkhedi-Silarkhedi MS Water Pipeline Crossing at Ch. (-) 0.700 on Ujjain-Garoth section of NH-752D, village Chnadesari, Tehsil & District-Ujjain under execution of the EE, WRD Ujjain
  • Permission for laying of underground Gas & Oil Pipeline at NH-15 (Tinsukia Makum Bypass Road) along the NH on LHS (towards increasing chainage) from Km. Chainage 635+447 to 640+004 on LHS and from Km. Ch. 640+004 to 645+596 on RHS (totat along NH: 10149 m) as well as across the NH at Km, Ch. 640+004 (total across NH-45m)
  • Proposal for NH crossing of Sewage Drainage at NH-703B RD KM 10.850, Moga to Makhu road at Kot Isse Khan Town District-Moga-Punjab Water supply & sewer
  • Permission for Laying of 132KV Underground cable line with 800 sq.mm XLPE Power cable from 220kv Popda Sub- station to 132kv Bhestan TSS i.e. M/s Western Railway with 1Cx800Sq.mm. (6+0) XLPE cable, parallel to NH-53 Chainage 39+630 to 36+990 KM RHS near Village Vanz, PardiKande & Sachin, District-Surat, in State of Gujarat
  • Permission for proposal of M/s Arcelor Mittal Nippon Steel India Ltd. for laying of 34-inch dia underground slurry pipeline along with 40mm dia power cable and OFC from Km. 368.020 to Km. 373.340 and 1 no. crossing at Km. 372.488 in the State of Odisha
  • Permission for laying of 250mm dia water pipeline along Dewas-Indore of NH-52 from km 581.732 to km 593.432 (Total length of 11.70 km)
  • Proposal for the permission of laying U/G Water Pipeline (HDPE Pipe) by HDD Method along/across NH-227A, Chhawani-Sikriganj Road, from Ch. 14.700 to 15.200 (RHS Length 500m) from Ch. 16.900 to 17.500 (RHS Length 600m, Ch. 40.100, Ch. 48.500, Ch. 50.900, Ch. 52.900 (Length 8x12.0=96.0m), Total Length 10396.0m at G.P Khusalganj, Dharampur Block -Dubuliya and G.P Narharpur, Block- Kaptanganj, Tehsil-Harraiya, and G.P Chakdah, Pau, Dihupur, Piparpati Ahatmali, Chakiya Block-Kudraha, Tehsil-Basti Sadar, District-Basti in the State of Uttar Pradesh
  • Proposal for the Permission for laying of 12-inch (323.95mm) carbon Steel Gas Pipe Line with OFC along NH-730 LHS from Koiladar (Sikara) Ch. 454.640 to Sandi Chowk Ch. 435.640 and across Ch. 451.840 RHS & Ch. 446.935 LHS approximately length 19.00 kms in the State of Uttar Pradesh
  • Permission for laying Drinking Water Pipeline along the road of NH-150A & NHAI in between Madabala to Hattigudur stretch of 22.04 kms in Yadgir District, in the State of Karnataka
  • Proposal for crossing of Gas pipeline at km 53.160 by M/s Unison Enviro Pvt. Ltd., in the State of Maharashtra
  • Proposal of permission for laying Optical Fibre Cable (OFC) along NH-58 from Km 55.000 to Km 58.000 (Total length 3.000 Km) on Jaipur-Jodhpur road of NH-58 in the State of Rajasthan
  • Overhead crossing of NH-48 at Ch. Km. 180+850 (Between stone No. 180 to 181) for LoC no. AP-52/0 to AP-53/0 of 400kv D/C Saykha-Jhanor line at near Village: Kargat & Nabipur Border, Taluka-Bharuch, District-Bharuch in the State of Gujarat for GETCO, Bharuch
  • Proposal of Bharat Petroleum Corporation Limited regarding ROW Permission for laying 6" Dia(152.4mm) Natural Gas CS Pipeline & OFC along LHS of NH-60A (New NH- 314) from near Birgiri village(km76.328) to Telkol para, Over Bridge more, Purulia(km 79.131) approx length(2.803 km) and 2(two) 6" dia pipeline crossing at km 77.010(Approx length 21 m) & at km 79.095(Approx length 18m) in the district of Purulia, West Bengal,(The total length is 2842m) of Bankura-Purulia Road
  • Proposal for crossing of Water pipeline at km 515.760 & km 518.426 on NH-53 by Commissioner, DMC, Dhule, in the State of Maharashtra
  • Proposal of Bharat Petroleum Corporation Limited regarding ROW Permission for laying 6" Dia(152.4mm) Natural Gas CS Pipeline & OFC along LHS of NH-60A (New NH-314) from near Birgiri village(km76.328) to Telkol para, Over Bridge more, Purulia(km 79.131) approx length(2.803 km) and 2(two) 6" dia pipeline crossing at km 77.010 (Approx length 21 m) & at km 79.095 (Approx length 18m) in the District of Purulia, West Bengal, (The total length is 2842m) of Bankura-Purulia Road
  • Proposal Permission for Laying of 4 inch (125mm) diameter MDPE/ Steel Under Ground Natural Gas Pipeline crossing at NH-03, Ch-55.290 (Gulab Bagh Circle), at Dholpur, Rajasthan
  • NOC Permission for laying of 125mm MDPE pipeline across NH-354 on Sri Muktsar Sahib to Malout road section for extension of pipeline network for PE Sri Muktsar Sahib city connectivity (Bathinda Chowk near Taneja Petroleum to Rupana village (M/s Satia Industries) in Muktsar city, Tehsil & District Sri Muktsar Sahib in the State of Punjab
  • Proposal of OPTCL for permission for crossing of 400kv DC Transmission line at km. 60.724
  • Proposal for grant of permission for laying optical fiber cable on NH-30 at Raipur-Simga Road at Village-Siltara from Km. 18+700 to Km. 19+700 (along RHS) & 60 Mtr road crossing at Kms 19+700. Total section ROW applied for length of 1+060 Kms in the State of Chhattisgarh
  • Four laning of CG/MH Border to Waingaga Bridge section from km 405 .000 to km 485.000 of NH-53 under BOT project in the State of Maharashtra-Laying of water supply pipeline between km 406.000 to km 413.600 & crossing at km 413.600
  • Proposal for permission of crossing of 33Kv underground cable at km 484.600, in the State of Maharashtra
  • Permission for laying underground 200mm dia. Water pipeline along NH-48 at Ch.224+897 km to Ch.227+443 km (2546m along) LHS for providing water pipeline to Rayzon Energy Private Limited at Village: Mahuvej & Kathwada, Tal. Mangrol, District-Surat in the State of Gujarat
  • NOC permission for 2 nos of crossing of Water Pipe Line of 200mm dia of DI pipe of PHED, Sirsa on NH-9 (old NH-10) of Hisar to Dabwali section at km 100.535 & 100.925 (total length 60m+60m=120m) at Village-Moriwala, District-Sirsa in the State of Haryana
  • Issuance of NOC to HPCL for laying of Visakh–Raipur underground product pipeline of 14” dia along with OFC at Km.419+496 (with 20” casing pipe up to IS specification with OFC placed in the casing)
  • Issuance of NOC to HPCL for laying of Visakh–Raipur underground product pipeline of 14” dia along with OFC at Km.456+172 (with 20” casing pipe up to IS specification with OFC placed in the casing)
  • Permission for laying of clear location Fulgawdi to Gunawad by pipe pushing at NH-47 Indore-Ahmedabad Mann Dam MVS District-Dhar, in the State of Madhya Pradesh
  • Laning of Thrissur (Km 270.000) to Angamali (Km 316.700) and Improvement, Operation & Maintenance of Angamaly (316.700) to Edappally (Km to 342.000) on NH-47 (New NH-544) on BOT(Toll) in the State of Kerala-Laying of 90mm casing pipe (63mm PVC) from Km.332+202-Km.332+268(RHS) of NH-544
  • Proposal for Permission for laying/crossing of underground water supply pipe line under Jal Jeevan Mission by HDD at Km. 73+250 to Km. 74+150, (900m) & Km. 70+491 to 71+981 (1490m) (LHS) and Km. 73+244to Km. 74+150 (906m) & Km. 70+491 to Km. 71+981 (1490m) (Total LHS+RHS=4786m) and crossing at Km. 72+900, Km. 74+150 (48mx2=96m) and Km. 71+773, Km.71+055 (50mx2= 100m) (Total 4 crossing length = 196m) on NH-530B (Bareilly-Badaun Section-Existing Chainage) at Village Kheda & Devchara Block-Alampur Jafarabad, Tehsil-Aonla, District-Bareilly in the State of Uttar Pradesh
  • Proposal for Permission for laying/crossing of underground water supply pipe line under Jal Jeevan Mission by HDD Method Crossing at Km. 198+060 to Km. 201+052 LHS (Length-2992m), Km. 199+170 to Km. 199+754 LHS (Length-584m), Km. 216+080 (Length-52m) on NH-530B (Bareilly-Badaun Section-Designed Chainage) at Village- Himmatpur, Sirohi, Makrandpur. Alampur Jafrabad, Sardar Nagar, Kohani Pratappur, Anguri Thakuran, Block- Alampur Jafrabad & Kyara Tehsil-Aonla & Bareilly, District-Bareilly in the State of Uttar Pradesh
  • Proposal for grant of ROW Permission to lay Optical Fiber Cable along NH-530B (Bareilly - Badaun Section) in RHS from Km. 215+500 to Km. 216+200 in the State of Uttar Pradesh
  • Request for NH 31C (New NH-27) clearance for crossing 33KV line UG cable works in Dhaligaon
  • Request for granting for the permission for laying of electrical line along the road new NH-46 (Old NH-69) from Start Point Km 39+600 RHS to End Point Km 40+900 RHS & crossing Km 40+900 RHS to LHS, Total no. of crossing (1) on behalf of Silk Resort at District-Narmadapuram, in the State of Madhya Pradesh
  • Request for ROW permission for laying Ariel OFC stretch from Jakheni to Chenani (21 Km) 5041 Link
  • Proposal for grant permission for laying 8" di a met er c arried STEEL Gas pipeline from Ch. 16.000 to Ch. 20.490 and across at Ch. 16.000 & Ch. 18.640
  • Proposal of Deesa Nagarpalika seeking permission for laying an underground water supply pipeline along between km. 569+400 to 569+605 on LHS and across at Km 569+605 on NH-27 in Deesa City of Banaskantha District in the State of Gujarat
  • Proposal for obtaining permission for laying 125MM/90MM dia. PE Pipeline along NH-48 Kheda-Nadiad Road) from NH Ch.33/991 km. to NH Ch.31/421km in Kheda District, along NH-48 (Kheda-Nadiad Road) From NH- Ch.52/935 km. to NH Ch.38/613 km. from Kismat Hotel Dabhan Village to Borpura Village in Kheda District and Across NH-48 (Kheda-Nadiad Road) At Ch.33/440km at Kheda District in the State of Gujarat
  • Proposal for laying Natural gas pipeline 4" Dia Carboin Steel pipe by HSDD/Trenching (M/s Indraprastha Gas Limited) along the Shamli to Karnal Highways), NH-709A from ch. 67+440 to 68+000 (LHS) in total length=560 m in the State of Uttar Pradesh
  • Permission for laying underground water pipeline along RHS of NH-16 (Old NH-6) from Km 126+000 to 128+750 (Kukrada PWSS) under Kharagpur Sub-Division of Midnapore Division PHE Dte
  • Submission of proposal to issue NOC for crossing of proposed water pipeline on NH-151A at Ch. 60+332 km near Village–Dharampur, Taluka–Khambhaliya, District-Devbhumi Dwarka
  • Proposal for laying of water pipeline on NH-26 along from km 184/150 to 186/100 (K. Bandoapala, WTP to Singhajharan Chowk) on LHS, km 188/200 to 202/200 (Badli Chowk to Hinjilibahali Chowk) on LHS and across at km 202/200 (Hinjilibahali Chowk) under PH Division, Bhawanipatna
  • Proposal for laying Natural gas pipeline 4" Dia Carboin Steel pipe by HSDD/Trenching (M/s Indraprastha Gas Limited) along the Shamli to Karnal Highways), NH-709A from ch. 67+440 to 68+000 (LHS) in total length=560 m in the State of Uttar Pradesh
  • Proposal for permission for laying of U/G water pipeline under Jal Jeevan Mission along from (Existing Chainage) Km. 141+252 to Km.141+560 (308 m) LHS, from Km. 141+235 to Km. 141+560 (325 m) RHS, from Km. 141+560 to Km. 141+999 (439 m) LHS, from Km. 141+560 to Km. 141+995 (435 m) RHS and Crossing by HDD method at (Existing Chainage) Km. 141+300, Km. 141+850 in Vill. Behta Gokul, Behta Dheera in Block Bawan, Tehsil-Hardoi in District-Hardoi on NH-731 (Shahbad-Hardoi Section) in the State of Uttar Pradesh
  • Proposal for permission for laying of underground water supply pipeline under Jal Jeevan Mission by HDD Method from Km. 317+320 to Km. 317+500 (180m) & from Km. 317+640 to 317+736 (96m) LHS and from Km. 317+000 to Km. 318+336 (1336m) RHS (Total length of LHS +RHS=1612m) and crossing at Km. 317+100, Km. 317+320, Km. 317+500 , 317+640 (Total length of 04 crossings 140m) at village Hafizganj Block, Tehsil-Nawabganj & District-Bareilly at NH-30 in the State of Uttar Pradesh
  • Proposal for permission for laying of underground water supply pipe line under Jal Jeevan Mission by HDD Method from Km. 5+540 to Km. 6+471 (931m) & Km. 23+680 to 23+740 (60m) & Km. 24+335 to Km. 25+035 (700m) & Km. 27+300 to Km. 27+690 (390m) LHS and from Km 5+236 to 5+690 (454 m) & Km. 23+680 to 23+740 (60m) & Km. 24+335 to Km. 25+035 (700m) RHS (Total Length LHS + RHS = 3295 m) & crossing at Km. 5+690, Km. 6+278, Km. 23+680, Km. 24+685, Km. 27+690 (Total Length of 5 crossings = 225m) at villages Labhera, Gargaiya, Dhoerera, Adhkata Nazrana Block, Tehsil-Nawabganj & District-Bareilly at NH-30 in the State of Uttar Pradesh
  • Permission for laying underground water pipeline along RHS of NH-16 (Old NH-6) from Km 126+000 to 128+750 (Kukrada PWSS) under Kharagpur Sub-Division of Midnapore Division PHE Dte
  • Proposal for permission for laying underground water supply pipe line under Jal Jeevan Mission ALONG from Km. 138+092 to Km. 141+210 (3118m) LHS, from Km. 140+770 to Km. 142+666 (1896m) RHS, from Km. 146+443 to Km. 147+622 (1179m) LHS, from Km. 148+676 to Km. 149+678 (1002m) LHS, Km. 159+320 in Vill. Baraunia, Saidpur, Behta Dheera, Tolwa Antdanpur, Kaurah & Korria in Block Bawan, Todarpur in Tehsil Shahbad & Hardoi in District- Hardoi on NH-731 (Shajahanpur-Hardoi Section) in the State of Uttar Pradesh
  • Permission for underground crossing of double circuit between Ch. 41.897 and Ch.41.997 , Ch. 45.683 on NH-30 in the construction work of newly constructed 33KV of green field yeast manufacturing plant of A.B. Mauri India Pvt. Ltd.
  • Proposal for permission for laying of underground water supply pipe line under Jal Jeevan Mission by HDD Method from Km. 310+750 to Km. 311+000 (250m) LHS & from Km. 310+750 to Km. 311+000 (250m) RHS (Total Length LHS + RHS = 500m) & crossing at Km. 310+850 (Total Length of crossing = 35m) at village Richola Kifaytulla Block, Tehsil-Nawabganj & District Bareilly at NH-30 in theState of Uttar Pradesh
  • Permission for laying of sewerage line (400mm DWC HDPE Pipe) of Block development & Panchayat Officer at km. 44+445 to km. 44+550 (RHS) (length 102.0m) & km. 44+550 to km. 44+660 LHS (length 110.0m) & crossing at km. 44+550 (RHS to LHS) (Length 60.0m) (Total Length 275.0m) on NH-44 in the State of Haryana
  • Proposal for permission of crossing of Electric cable across NH-52 at Ch. No. 202+170 & 202+200 at Village-Karanwas, District-Rajgarh State of Madhya Pradesh
  • Proposal for permission for PGCIL, Bhopal 765KV Kurawar Transmission overhead crossing line at Ch. 231.373 on Biaora-Dewas section of NH-52, Village-Nainawada, Tehsil-Sarangpur & District-Rajgarh in the State of Madhya Pradesh
  • Proposal for laying crossing for water pipeline on Jaisalmer-Phalodi section of NH-11 at chainage Km 202+000 to 203+000 (Gomat Selvi) 150mm & 201+750 to 202+250 (Gomat Selvi) 125mm District-Jaisalmer, in the State of Rajasthan
  • Demand for obtaining permission for laying of 33 KV overhead electrical transmission line crossing at Km. 104+525 on Akkalkot Solapur NH-150(E), (Akkalkot Bypass), Tal.- Akkalkot, District-Solapur, in the State of Maharashtra
  • Proposal for the permission of laying U/G Water Pipe Line at Ch. 95+245 to 98+240 Km and crossing Ch. 97+803 & 97+808 Km (Length-120m) across NH-44 District-Lalitpur, in the State of Uttar Pradesh
  • Request for granting permission for laying of proposed 6 & 4 dia natural Gas Steel pipeline along the nH-07 at Km. 138.658 (RHS) (bathinda to barnala road) for the project CNG & DRS Connectivity near Bucho Khurd in Bathinda Tehsil of Bathinda District in the State of Punjab
  • Permission for laying of electrical 11KV HT UG Cable supply from MUSS (Alkola) to Kotegangur Coaching Depot along NH-69 (NH-206) Km 156.100 to 158.110 in Shimoga City Limit, Honnavar–Chittor section in the State of Karnataka
  • Proposal for extending of pipe from Nalas to the 15 Nos. of Tanks under Holalkere tank filing scheme & filing up Kalakere Tank under Chitradurga Branch canal of upper Bhadra Project is being installed in the State of Karnataka by HDD method