Sorry, you need to enable JavaScript to visit this website.

You are here

  • Request for permission for crossing of 132KV DC Sarsawa-Rampur Maniharan transmission line between Ch. 67.600 & 67.700 across NH-73 in District-Saharanpur in the State of Uttar Pradesh
  • Permission for laying of 24" dia Natural Gas pipeline along with OFC by standard HDD method using bundle for carrier pipe and oFC across National Highway-59 at km 312/879 at village-Ambathaguda Dist-Ganjam in the state of Odisha
  • Rehabilitation and up-gradation to 2-lane with paved shoulder for Jind-Karnal section from existing km 68+660 (Design km 68+857)i.e junction with Narwana Road (NH-352) at Subhash Chowk ends at km. 153+700 (Design 154+219) at ITI Chowk which is the intersection with NH-1 of NH 709 A in the State of Haryana under NH (O) (Package-II)- NOC Proposal for laying of Sewer line on one side from Km 0.7 to Km 2.7 for total length of 2Km along NH-352 by open trench method in District Karnal in State of Haryana
  • Proposal for 220KV D/C Navsari (Power Grid) to Bhestan/Popda (GETCO) Line Overhead Power Line Crossing at Km 272+0.00344 between NH-48 Km. 272+000 to 273+000
  • Permission for laying proposed 6" dia underground Gas pipeline from CGSML Gana CNG station in Anand and laying 125 mm dia MDPE underground gas pipeline across NH-64 @km 91/248 & km 105/654 in Anand District in the state of Gujarat
  • Proposal for laying / crossing of 11 KV underground electrical Cable at Km.261.400 at Vyalla, Tq. Balapur, District Akola on Ahrravati- Chikali Section of NH-53
  • Proposal for final access permission to Private Property of “M/s Harbajan Lal” at Km 213.925 (RHS) on NH-1 (New NH-44) at Village Mehmadpur, Tehsil-Ghannur & Distt. Patiala in the state of Punjab
  • Four laning of Solapur-Bijapur section of NH-13 from Km. 0/000 to Km. 110/542 in the States of Maharashtra & Karnataka on DBFOT Basis - Proposal for the laying of Optical Fibre Cable by adopting HDD method along NH-52(Old-NH-13) fom Bijapur Ashram Road Km 102.700 to Bijapur Mahalbagayat Km.104.600 on RHS and one road crossing at Km 104.600 for total length of 1.90Km. in the State of Karnataka- Reg
  • Four laning of Solapur-Bijapur section of NH-13 from Km. 0/000 to Km. 110/542 in the States of Maharashtra & Karnataka on DBFOT Basis - Proposal for the laying of Optical Fibre Cable by adopting HDD method along NH-52(Old-NH-13) fom Bijapur Ashram Road Km 102.700 to Bijapur Mahalbagayat Km.104.600 on RHS and one road crossing at Km 104.600 for total length of 1.90Km. in the State of Karnataka
  • Proposal for permission for laying optical fiber cable (OFC) of M/s Reliance Jio Infocom ltd, Hyderabad along NH-340C from Km 57/900 to Km 63/527 for a total route length of 5627mtrs in Pamulapadu mandal, Kurnool District in the State of Andhra Pradesh
  • Access Permission for laying of Underground Pipetine of dia 900 mm with protection pipe of dia 1600 mm of M/s. Ahmedabad Municipal Corporation along & across NH-47 from Km 2/100 to Km 4/200 and crossing at Km 4/200 in Ahmedabad in the State of Gujarat
  • Invitation to Public Comments on proposal seeking permission for laying of OFC cable along NH-275 From KM 188.600 to Km 190.600 on LHS for a total length of 2.00 Kms through HDD method by M/s Railtel Corporation of India Ltd
  • 0507-2021-NHAI, Regional Office-Kerala-PIU-Palakkad-4 laning of Walayar - Vadakkanchery section from Km 182.250 to Km 240.000 (Design chainage Km. 182.250 to 236.135) of NH-47 (New NH 544) on DBFOT (Toll) basis under NHDP Phase –II in the State of Kerala (Package No. NS-2/BOT/KL-2) – Request for permission for overhead crossing of 110KV Double Circuit Power Transmission line at Km 233.200 of NH-544 by KSEB-Reg.
  • Proposal for permission for laying Optical Fibre Cable (4G Project) along the NH-47 Ahmedabad-lndore from Km 157+300 to Km 158+000=700M at village Vadela, Taluka Limkheda, District Dahod, in the state of Gujarat
  • Proposal for permission for overhead crossing of 765 KV D/C Lakadia-Vadodara Transmiss1on l1ne across NH-48 at Km, 98.850 near Village Padamala of Taluka & District Vadoclara on Ahmedabad-Vadodara of NH-48
  • Proposal for ROW Permission for laying 160 mm Dia MSPE Gas Pioeline across NH-48 at Km 92+477 near Village-Vasad Taluka &. District-Anand on Ahmedabad-Vadodara Section of NH-48 in the state of Gujarat
  • Proposal for grant of permission for laying OFC at NH 11A Ext. Barkhapur to Datawas mode Km. 52.00 to km. 64.00, total length is 12 km. (as per enclosed SLD) on Dausa-Lalsot-Kauthun section by M/s. Dinesh Engineering Ltd
  • Permission of laying of 8" dia Natural Gas pipeline & 5" dia MDPE along NH-27, orai- Barajore from cg.1573+020 to ch. 1578+400 ( Amul Milk Plant Mati kbarpur to BArajore Tiraha Akbarpur)5.380km
  • Access Permission for laying of Underground PE Gas Pipeline of dia 90 mm of M/s. Gujarat Gas Limited along NH-47 from Km 63/560 to Km 64/252 on Right Hand Side Near Village Kariyani, Taluka-Wadhwan, District-Surendranagar in the State of Gujarat
  • Access Permission for the crossing of an Overhead electric line of 220KV S/C of M/s. Gujarat Energy Transmission Corporation Ltd across NH-47 between Km 83/600 and 83/700 near Choraniya Village, Taluka- Limbdi, District- Surrendernagar in the State of Gujarat
  • Permission to lay proposed 18” LPG pipeline from Kandla to Gorakhpur across NH-27 (Mundra – Ahmedabad) in Kutch District (Kandla to Viramgam Section)
  • Permission for laying sewerage pipeline along the National Highways from Km 169/720 to 171/820 and across the road in Km 179/790,Km 170/940,Km 171/100 ,Km 171/250 in Madurai-Dhanushkodi Road of NH-49 in the State of Tamil Nadu
  • Proposal for grant of permission for overhead highway crossing of 220KV OHL from MSPL’s 200 MW (AC) Solar PV Power Plant at Km 30+720 (NH-15) [Km. 298+215 of New NH-11] of Bikaner-Phalodi, Village-Khari Charnan (Gajner)
  • Proposal for overhead crossing clearance of NH-11 (old NH-15) from Jaisalmer-Bikaner at Km. 318 & 319 near Village-Kanji Ki Sird (Distt-Jodhpur) by LOOP-OUT of 765 KV D {Cc Ajmer-Bikaner Transmission Line at Bhadla-Il by M/s. PGCIL
  • Proposal for grant of permission for laying of OFC at Lalwadi Chauraha to Jhilai Pulia at NH-12 (New NH-52), Km. 69/2 to 73/2, (on Jaipur-Tonk-Deoli section) total 4.00 km length (as per enclosed SLD)
  • Proposal for grant of permission for road cut for PHED water pipeline crossing on NH-8 (New NH-48) km 261.520 on Delhi-Ajmer highway and Kalwar Road crossing in Jhotwara for providing connectivity from the Bilaspur water
  • Permission for laying OFC along and across NH-56 (Rajpipla to Bodeli) section from km 454/400 to km 480/800 & km 489/300 to km 499/800 (Total 36.4 km) in the state of Gujarat
  • Permission for crossing of the National Highways in the state of West Bengal for laying of pipelines by IOCL from Haldia – Durgapur Loop line section at the following location: (i) At km 75.125 on NH-6, (ii) At km 71.977 on NH-6, (iii) At km 74.585 on NH-6, (iv) At km 34.233 on NH-6, (v)At km 42.343 on NH-6, (vi) At km 0.785 on NH-41, (vii)At km 12.800 on NH-41
  • Permission for laying Cross Country Underground Natural Gas Pipeline along with OFC through ROU(Right of User) and across NH-15
  • Permission for laying of OFC cable along/across NH-56 between km 579/00 to 636/00 in the state of Gujarat
  • Permission for laying OFC along NH-64 (old NH-228) from km 234/000 to km 247/200 under Bharat Net Phase-lll in the state of Gujarat
  • Rehabilitation and up-gradation to 2-lane with paved shoulder for Jind-Karnal section from existing km 68+660 (Design km 68+857)i.e junction with Narwana Road (NH-352) at Subhash Chow kana ends at km. 153+700 (Design 154+219) at ITI Chowk which is the intersection with NH-1 of NH 709 A in the State of Haryana under NH (O) (Package-II)-Proposal for laying of 900mm diameter RCC pipe from Km 0.700 to Km 2.786 by trenchless technology, crossing of box drain at Km 0+700 by open cut method and crossing of RCC pipe of 600mm at Km 1+520 to 1+540 by open cut method in NH-709A i.e. Karnal-Meerut Road in Karnal Town in the State of Haryana
  • Regarding permission for laying proposed Gas pipeline of 8 inch Diameter Steel and 125 mm MDPE Gas pipeline along from km 47.100 to km 57.880 (RHS) and km 57.880 to km 80.820 (LHS) across at km 51.150 and km. 57.000, valve chamber at km 47.100, km 50.100, km 53.100, km 56.100, km 59.100 km 62.100, km 65.100, km 68.100, km.71.100, km 74.100, km 77.100 and km 80.100 across NH 344 A in Rupnagar Hoshiarpur section Highway from Nawanshahr to Asron in District Nawanshahr in the State of Punjab.
  • Proposal for final access permission to private property of M/s Erisha Infratech at km. 219.420 (LHS) of NH-1 (new NH-44) Vill - Shambhu Khurd, Tehsil Rajpura & Distt. Patiala in the State of Punjab
  • Notice Inviting Public Comments - NHAI, RO Chennai – PIU, Chennai - Request for permission to lay 33KV 3 x 630 Sq.mm XLPE UG Cable MEPZ 110KV SS to Anakaputhur 33/11KV GIS SS along the road from Km.5/200 to Km.7/040 for a total length of 1840m by Open Trench & Trenchless Method and across the Road in two locations at Km.5/200 & Km.7/040 by Trenchless Method in Chennai Bypass in the State of Tamil Nadu – Reg
  • NHAI, Madurai Region – Highway Administration – laying of cables under PIU, Karaikudi - Permission for laying of pipeline by M/s. Trichirapalli City Coporation, Trichy Across highway (i) Km 134.620 on Trichy Bypass road section of NH67 & 45B in the State of Tamil Nadu – Invitation of Public Comments – Reg.
  • NHAI, Madurai Region – Highway Administration – laying of cables under PIU, Karaikudi - Permission for laying underground Optical Fiber Cable by M/s.RailTel Corporation of India Ltd, Chennai along the road (i) From 0/000 to Km.1/500 LHS, in Thanjavur – Pudukottai section of NH226 in the State of Tamil Nadu
  • laying of cables under PIU, Thanjavur - Permission for laying underground Optical Fiber Cable by M/s.RailTel Corporation of India Ltd, Chennai along highway (i) From 89/530 to Km.89/875 LHS, (ii) from Km 89/530 to Km 89/800 (RHS) and (iii) Across at Km 89/530 on Thanjavur – Trichy section of NH83 (Old NH 67) in the State of Tamil Nadu – Proposal submitted for In-principle Approval – Observations – Reg
  • Notice Inviting Public Comments - PIU, Salem – M/s. Vodafone Idea Limited, Chennai – Request for laying of Underground Optical Fiber Cable on Salem – A.Pallipatti Section of NH-179A from Km 28/800 to Km 29/700 (LHS) for a total length of 900 meters in the Limits of National Highways, Salem
  • Invitation of public comments for Proposal for grant of permission for laying of 6” Carbon Steel and 125mm MDPE underground Natural Gas Pipeline from NH Ch. 3+237 (Firozpura-Kajipura crossing) to NH Ch. 6+975 (Saipau road, SH-23) at LHS along NH-123 at Dh
  • Application for seeking permission / NOC for installation of mobile network site at NH-8 Rao Tula Ram Marg, Near Arjun Path Bus Stand (Lat/Long 28.5749 1/77.14685) New Delhi - 110057
  • Permission for laying underground optical Fibre Cable (OFC) on NH 167B (Mydukuru-Singarayakonda section) along the road from Km.99/197 to 99/312(RHS), Km.99/312 Road crossing (RHS-LHS), Km.99/312 - 99/347 RHS & LHS both sides, Km.99/347 Road crossing (RHS- LHS), Km.99/347 to 107/117 (LHS) for a total length of 7.955 km in the Andhra Pradesh
  • Proposal seeking permission for laying of OFC cable from Km 269.500 to 290.00 along NH-69(Old NH 234) on LHS for a total length of 20.50 Kms through HDD method by M/s Telesonic Networks Ltd
  • Laying of OFC along NH-565 - Proposal for access permission for laying of OFC by M/s Telangana Fiber grid Corporation Limited along NH-565 from Ch.3/300 to Ch.83/900 for 61.600km in the State of Telangana
  • Water grid Project-Providing drinking water supply scheme to Uddanam area of Srikakulam District-Laying of Drinking water pipe line along and across NH 326A- NH Circle, Vijayawada-(R&B) NH Division Vishakhapatnam
  • Laying and crossing of 560mm dia iron ore slurry pipeline & 560 mm dia water pipeline and 65mm Optic Fibre Cable along NB-5A (New NB-53) from Chandikhole to Paradip km. 0.000 to Km. 67.500- Proposal ofMls. Essar Minmet Ltd
  • Proposal for the permission for laying of 12" dia carbon steel gs pipeline, 125mm MDPE Gas pipeline & 50mm duct trench from NH ch. 114.100 ( near Vehalna Choek cut on NH-58) on NH-58
  • 4- laning of Rohtak to Hisar section of NH-10 (from km 87+000 to km 170+000) including connecting link from Km 87+000 (NH-10) to Km 348+000 (NH-71) to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III in the state of Haryana - Proposed Layout Plan for Granting the Permission to Lay 200mm Diameter Natural Gas Pipeline (CS Pipe) of “m/s HCG (KCE) Pvt. Ltd.” Along NH-10 (New NH-9) from Km. 157.912 (RHS) to Km. 176.430 (RHS) (Length 18518m) with one Crossing at Km. 169.500 (length 60m) (Total length 18578m) in District Hisar, State Haryana
  • Proposal of permission of laying underground Optical Fibre Cable (OFC) along National Highway from Km 0/000 to 0/500(LHS),Km 2/100 to 28/110(LHS),Km 27/600 to 28/110(RHS) & crossing at Km 3/310,Km 6/510,Km 21/720,Km 22/210,Km 27/600,Km 28/110 of NH-383 (Dindigul- Natham-Kottampatti Road) in the state of Tamil Nadu
  • Permission for laying of drinking water supply pipelines of DI Pipes of maximum dia 600mm under Mega Rural Piped water supply project consisting of 33 GP.s under Ghasipura & Anandapur Blocks . of Keonjhar
  • Permission for laying of underground power cable from proposed 132/33KV Badagada GIS s/s existing 132/33 KV Gride S/S at Kesura, Laying Underground Cable from Km. 4.500 to 7.750 km LHS & Crossing at km. 7.750 in Bhubaneswar to Puri section of NH-316
  • Operation & Maintenance Period of Tada – Nellore (Km. 52.800 to Km.163.600) Section of NH-5 (New NH-16) (BOT – Toll) – Permission for laying 8"gas steel pipeline from Km.120/140 to Km.120/280 on RHS, crossing at Km.120/280, from Km.120/280 to Km.133/960 on LHS and crossing at Km.126/330 for a length of 13.92 kms in the state of Andhra Pradesh
  • Proposal of M/s Tata Communications Ltd. for laying Optical Fiber cable from Km. 86.250 to Km. 92.500 (BHS) through HDD method along NH-1 (new NH-44) in the state of Haryana
  • Rehabilitation and up-gradation to 2-lane with paved shoulder for Jind-Karnal section from existing km 68+660 (Design km 68+857)i.e junction with Narwana Road (NH-352) at Subhash Chow kana ends at km. 153+700 (Design 154+219) at ITI Chowk which is the intersection with NH-1 of NH 709 A in the State of Haryana under NH (O) (Package-II)-NOC Proposal for laying of 12” carbon steel pipeline for CNG station of Indraprastha Gas Ltd. on Jind-Karnal-Meerut Road (NH-709A) from Km 145.685 to Km 148.865 (LHS) in District Karnal
  • Proposal for NOC permission for laying of 324 mm dia LPG pipeline( under Unnao-Gorakhpur Pipeline Project) & 89 mm MS duct for OFC cable across NH-31 at Km 264.668 through trenchless method In Village Jamalpur, Tehsil-Pindra, District Varanasi in the state of Uttar Pradesh
  • Six laning of Surat-Dahlsar Section of NH-8 from km 263.000 to Km 502.000 (Length Km 239.000) in the State of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V
  • Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (length 102.300 Km.) in the state of Gujarat and Improvement of Ahmedabad Vadodara Expressway from Km. 0.000 to Km. 93.302 In the State of Gujarat (Length 93.301 Km.) under NHDP Phase Von Design, Build, Finance, Operate&. transfer (DBFOT) Toll Basis
  • Permission for laying 700 mm dia M.S. Pipeline along the NH-113 (Padhi-Dahod Section) from Km. 183+700 to Km. 192+500, LHS (Kalinjara to Chirolabada section) in the State of Rajasthan
  • Proposal for NOC permission for execution of water pipeline at nh-26 at ch. 21.380 to 21.400 village- near Chaharpur by MP Jal Nigam Maryadit, PIU, Azad Ganj, Niwari, Distt- Niwari
  • Permission for laying of sewerage and PHED water Pipeline at Km. 47.470, 47.490, 49.500, 49.510, 49.860, 49.870km. at Village - Manesar, Dist.- Gurugram on NH-8 (new NH-48) of Gurgaon
  • Four Laning of Gujarat/Maharashtra Border-Surat-Hazira Port Section of NH-6 (approx. length 131.500krn) in the State of Gujarat under NHDP Phase Ill
  • Permission for laying of water Pipeline along NH-8 (48) crossing at Km. 74.087, Village - Kharkara on NH- 8 (New NH-48) of Gurgaon - Kotputli - Jaipuir section in the state of Haryana by Haryana shahari Vikas Prashikaran (HSVP)
  • Permission for the install/laying of Optical Fiber Cable (OFC) of M/s Jio Digital Fibre Private Limited along NH-168A between km 36/300 to km 38/800, for the Total Project Length as 2500.00 m, in the State of Gujarat
  • Permission for the install/laying of 80 mm dia. Optical Fibre Cable (OFC) HDPE duct of M/s Jio Digital Fibre Private Limited across NH-168A between km 11/800 to km 36/500, for the Total Project Length as 24.70 km, in the State of Gujarat
  • Permission for the install/crossing of 220KV D/C Radhanesda — Vay (Khimanvas PGCIL) Overhead Transmission Line of M/s Gujarat Energy Transmission Co. Ltd. (M/s GETCO) across NH-68 at km 347/538, for the Total Project Length as 60.96 m, in the State of Gujarat
  • Laying of OFC on Hyderabad Manneguda Road Section between km 17.200 to km 31.400 of NH 163 in the State of Telangana
  • Laying of OFC on Hyderabad Srisailam Road Section between km 9.600 to km 19.600 of NH 765 in the State of Telangana
  • Permission of laying for Optical Fiber Cable Work along the route on NH-48 from “Vapi to Talasari km. 363.850 to km. 395.850 (LHS) & Across the road 3 crossing, (i) km. 363.850 (ii) km.370.950 & (iii) km.385.750 the Total Length- 32.180 kms
  • Proposal seeking permission for laying of OFC cable from Km 504.400 to 530.500 along NH-181 (Old NH 67) on LHS for a total length of 26.100 Kms and one road crossing at Km 530.500 through HDD method by M/s Jio Digital Fibre Ltd
  • Talcher to End of Kamakhyanagar Bypass section from Km.301.474 to Km.336.900 of NH-200 & from Km.8.500 to Km.14.800 of NH-23 in the state of Odisha under NHOP-III- Proposal to lay 600 mm dia slurry pipeline with OFC Duct in the LHS of NH·53
  • Proposal for grant of permission for crossing of NH No. 25 at Bhakarwas Ch. 19.982 for 132 KV S/C transmission line on D/C Tower (Stringing S/C only) from 132 KV GSS Jaitaran to M/s. Ultratech Cement Ltd
  • NOC proposal for ROW access permission for laying of 1 no. Iron Ore Slurry pipeline of Steel of dia 450mm for iron ore transportation, 1 no. return water pipeline of Steel of dia 450mm & 50mm dia OFC to Tata Steel Ltd
  • NOC proposal for ROW access permission for laying of 1 no. Iron Ore Slurry pipeline of Steel of dia 560mm for iron ore transportation, 1 no. return water pipeline of Steel of dia 560mm & 50mm dia OFC to Pallet plant at Paradip from Ch.Km.O+OOO at Panikoil
  • Permission for laying of 4" dia steel gas pipe line Malatipatpur Bus Stand to Tulasi Chaura Chowk (LHS) (Km 54.700 to Km 53.000), laying of 8" dia pipeline from Malatipatpur Bus Stand to Batagaon chowk (RHS) (Km 54.700 to Km 56.500)
  • Laying of pipeline in the RoW of NH-220 from Karanjia to Patna (km 90/350 to 101/320) and from km 103/082 to 104/590) along with 4 nos of road crossing in connection with Mega Piped Water Supply scheme pertaining to Saharapada Block of Keonjhar District in the state of Odisha
  • Proposal for Extension of Provisional NOC to Private Property of “Indraprastha Global Education and Research foundation” at km. 81.650 (LHS) on NH-44 (Old NH-01) in village Sewah, Tehsil & District Panipat (Haryana)
  • NHAI, RO Chennai - PIU, Coimbatore – Request for permission to lay Underground Optical Fibre Cable (OFC) on NH-47 (New No.544) (Chengapalli to Walayar Section) along the road from Km 131/200 to Km 144/380 (RHS) in the limits of National Highways by M/s. PGCIL
  • Proposal submitted by RVPNL, Jaisalmer for grant of permission for overhead crossing of 132 KV S/C chandan Mohangarh line from AP-4/0 (DD-3) at Km. 49 of NH-11 (Phalodi- Jaisalmer section) in the state of Rajasthan
  • Gas Distribution network for sirohi & Jalore GA in Rajasthan state (pindwara Spuerlin) - Proposal for grant of permission for laying 8 dia steel Natural Gas Pipeline to supply natural gas to Pindwara city
  • NHAI, RO Chennai - PIU, Salem – Laying of Underground Optical Fibre Cable (OFC) on (Krishnagiri – Thumbipadi section) NH-44 (Old NH-7) between Km 169/700 to Km 170/800 (RHS), Km 173/800 to Km 174/800 (RHS) and cross @ Km 169/700, Km 170/800, Km 173/800, Km 174/800 and proposed OFC MH’s @ Km 169/700 (L), Km 170/800 (L), Km 173/800 (L), Km 174/800 (L) of NH-44 (Old NH-7) for a total length of 2314m in the limits of National Highways by M/s. Jio Digital Fibre Pvt Ltd, Chennai
  • NHAI, RO Chennai - PIU, Coimbatore – Rehabilitation and up-gradation of NH-209 from Km 123/550 to Km 150/400 of Dindigul – Bangalore Road ( Pollachi to Coimbatore section) to four lane with paved shoulder in the state of Tamilnadu under NHDP-IV on EPC Basis - Proposal for crossing underground 22 KV electrical power cable (2 Nos. of 160mm dia HDPE pipe at Km 132/180 by HDD method in connection with Railway electrification of Pollachi – Podanur railway section in the limits of National Highways by M/s. L&T Constructions Limited
  • NHAI, RO Chennai - PIU, Coimbatore – Rehabilitation and up-gradation of NH-209 from Km 123/550 to Km 150/400 of Dindigul – Bangalore Road ( Pollachi to Coimbatore section) to four lane with paved shoulder in the state of Tamilnadu under NHDP-IV on EPC Basis - Proposal for crossing underground 22 KV electrical power cable (2 Nos. of 160mm dia HDPE pipe at Km 132/180 by HDD method in connection with Railway electrification of Pollachi – Podanur railway section in the limits of National Highways by M/s. L&T Constructions Limited
  • Proposalfor overhead crossing of NH-24 at Chainage 82.550 km near Village-Bihuni,Tehsil-Garhmukteshwar, District-Hapur by under construction 400KV D/C Meerut-SimbhawaliTransmission Line
  • Proposalfor overhead crossing of NH-24 at Chainage 79.419 km near Village-Saroorpur,Tehsil-Garhmukteshwar, District-Hapur by under construction 400KV D/C Muradnagar-SimbhawaliTransmission Line
  • NHAI – RO Madurai - Permission for laying underground Optical Fiber Cable along the NH in the section of Trichy-Dindigul of NH-45 from Km 420/400 to Km 420/700 (LHS) in the State of Tamil Nadu
  • Grant of permission for laying of 18” dia Natural Gas Pipeline by M/s. GAIL (India) Limited along with 6” dia OFC by standard HDD method using bundle for carrier pipe and OFC across NH-16 at Km.537.89 for a length of 63.890mt
  • Grant of permission for laying of underground R-LNG Pipeline (ETBPNMTPL) along with Optical Fibre Cable (OFC) across NH-4 (New NH-40) at Km 150.623 between Gopalapuram to Reddigunts, Anupalli (V), Chittor (M) and across NH-4 (New NH-69) at Km 192.971 between Palamaner to Bangarupalem, Palamaner (V&M) in Chittor District in the State of Andhra Pradesh
  • Permission for laying of 18” dia Natural Gas Pipeline by M/s. GAIL (India) Limited along with 6” dia OFC by standard HDD method using bundle for carrier pipe and OFC across NH-16 at Km.585.700 for a length of 60mt – Public comments – Reg.
  • Permission for laying of 18” dia Natural Gas Pipeline by M/s. GAIL (India) Limited along with 6” dia OFC by standard HDD method using bundle for carrier pipe and OFC across NH-16 at Km.537.89 for a length of 63.890mt
  • Permission for laying of OFC by M/S Telangana Fiber Grid Coporation limited along with NH565 from Ch.156/400 for 6.210km in the State of Telangana