JavaScript is off. Please enable to view full site.
E.g., 15-10-2019
E.g., 15-10-2019
Circulars / Notifications related to National Highways
(Notifications include O.M.s, Circulars, Office Orders, Advisories, etc.)
S. No. Subject Date
11 Amendment to Model document for RFP for Road and Bridge Works to be implemented on EPC mode (94.49 Kb application-pdf) 27-06-2019
12 Report sought by National Human Rights Commission regarding adherence to Ministry's and IRC: 103 "Guidelines for pedestrian facility" for persons with Disabilities (2.21 Mb application-pdf) 25-06-2019
13 Report sought by National Human Rights Commission regarding adherence to Ministrys and IRC: 103 “Guidelines for pedestrian facility” for persons with Disabilities, letter to NHAI dated 25.06.2019 (7.09 Mb application-pdf) 25-06-2019
14 Report sought by National Human Rights Commission regarding adherence to Ministrys and IRC: 103 "Guidelines for pedestrian facility" for persons with Disabilities, letter dated 25.06.2019  (2.21 Mb application-pdf) 25-06-2019
15 SOP for the provision of falseworks (or scaffolding or temporary structures) as required for safe construction of any permanent concrete/steel structures on National Highways in the country (181.41 Kb application-pdf) 20-06-2019
16 SOP for the provision of false works (or scaffolding or temporary structures) as required for safe construction of any permanent concrete/steel structures on National Highways in the country, circular dated 20.06.2019  (181.41 Kb application-pdf) 20-06-2019
17 Principles to be adopted while considering the highway near or within wildlife sanctuaries/National Parks/Animal Corridor, circular dated 29.05.2019 (880.46 Kb application-pdf) 29-05-2019
18 Principles to be adopted while considering the highway near or within wildlife sanctuaries/National Parks/Animal Corridor (880.45 Kb application-pdf) 29-05-2019
19 CVC instructions relating to use of official email id for tender related communications and mechanism for online submission/verification of bid documents, OM dated 27/05/2019  (368.33 Kb application-pdf) 27-05-2019
20 Deployment of key personnel of various consultancy assignments inter - alia during feasibility/DPR (753.73 Kb application-pdf) 04-04-2019

Pages