JavaScript is off. Please enable to view full site.
E.g., 06-12-2019
E.g., 06-12-2019
Circulars / Notifications related to National Highways
(Notifications include O.M.s, Circulars, Office Orders, Advisories, etc.)
S. No. Subject Date
1 Construction of New 4- lane Bridge(Parallel to the Existing MG Setu) with its approaches from km 0/0 to km 14/500 across river Ganga on NH-19 at patna in the state of EPC mode- Metting with the Intending Bidders (555.99 Kb application-pdf) 26-11-2019
2 Use of waste Plastic in Hot Bituminous Mixes in wearing courses (dry process) for construction of National Highways (827.87 Kb application-pdf) 26-11-2019
3 Policy Guidelines on surveying with network survey vehicle (NSV) for all the projects involving development of 2/4/6/8- lane, Expressway, Strengthning (1.61 Mb application-pdf) 13-11-2019
4 Interest Bearing working Capital Advance against unbiled executed work to mitigate the cash flow problems of HAM Concessionaire &EPC contractors and modification in Schedule- H of the EPC Contract (2.30 Mb application-pdf) 09-11-2019
5 Citizen and State actions for water conservations, augmentation and preservation (1.47 Mb application-pdf) 18-10-2019
6 Standard RFP for National Highways and centrally sponsored road works proposed to be implemented on EPC mode of Contract-Amendments-I to RFP (1.45 Mb application-pdf) 07-10-2019
7 Road Safety Measures on stretches of National Highways - reg. (2.24 Mb application-pdf) 20-09-2019
8 Stop use of "Single-use-plastic" (287.18 Kb application-pdf) 03-09-2019
9 Rain Water Harvesting and Artificial recharging along National Highways - Standard Operating Procedure (1.99 Mb application-pdf) 03-09-2019
10 Collection and re-use of Waste Plastic : Swachhata hi Seva Campaign (825.43 Kb application-pdf) 27-08-2019

Pages