Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Six-laning of Ahmedabad to Vadodara section of NH-8 from Km 6+400 to Km 108+700 (Length 102+300 Kms) and Improvement of Ahmedabad-Vadodara Expressway from Km 0+000 to Km 93+302 in the State of Gujarat (Length 93+302 Kms) under NHDP Phase-Von DBFOT Toll Basis.Proposal for ROW Permission for laying of 66 KV XLPE cable along NH-48 from Km 8+600 to Km 6+400 at District Ahmedabad on Ahmedabad-Vadodara Section of NH-48 in the State of Guiarat

    Upload Document File:  43. IPC_D-1090 dt. 27.07.2021_GETCO-Nadiad_Km 6+400 to Km 8+600_PD-Ahd-91703.pdf ...

    morthadmin - 08/26/2021 - 12:13 - 0 comments

  2. Six laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length 102.300 Km.) and Improvement of Ahemedabad-Vadodara Expressway from Km. 000. to Km. 93.302 in the state of Gujarat (Length 93.302 Km.) under NHDP Phase-V on DBFOT Toll Basis

    Upload Document File:  39. IPC_D-1026 dt. 13.07.2021_IOCL-Vadodara_Across Km 100+234.pdf ...

    morthadmin - 08/26/2021 - 11:46 - 0 comments

  3. Six laning of Samakhiyali-Gandhidham section of NH-8A from Km 306+000 to Km 362+160 in the state of Gujarat to be executed as BOT (Toll) on Design,Build,Finance,Operate and transfer (DBFOT) under NHDP Phase-V

    Upload Document File:  38. IPC-D-971 dt. 01.07.2021_Gallantt Metal_Water Pipeline Across Km 308+375_86372.pdf ...

    morthadmin - 08/26/2021 - 11:27 - 0 comments

  4. Four laning of Solapur- Yedshi section of NH-211 from Km.0.00 to Km.100.00(Design length 98.717 Km.)in the state of Maharashtra to be executed as BOT (Toll)on DBFOT pattern under NHDP Phase IVB-Submission of proposal for laying overhead 11KV composite electrical line on existing LT line along NH-211 at Km.52/750 to Km.53/160 and Km.52/150 to Km.52/470 on LHS at village Wadgaon Siddheshwar,Tal.& Dist. Osmanabad on Solapur Yedshi section of NH-211 in the State of Maharastra

    Upload Document File:  Four laning of Solapur- Yedshi section of NH-211 from Km.0.00 to Km.100.00(Design length 98.717 Km.)in the state of Maharashtra ...

    morthadmin - 08/25/2021 - 14:19 - 0 comments

  5. Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (length 102.300 Km.) in the state of Gujarat and Improvement of Ahmedabad Vadodara Expressway from Km. 0.000 to Km. 93.302 In the State of Gujarat (Length 93.301 Km.) under NHDP Phase Von Design, Build, Finance, Operate&. transfer (DBFOT) Toll Basis

    Upload Document File:  Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (length 102.300 Km.) in the state of Gujarat a ...

    morthadmin - 04/26/2021 - 15:23 - 0 comments

  6. Six laning of Surat-Dahlsar Section of NH-8 from km 263.000 to Km 502.000 (Length Km 239.000) in the State of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V

    Upload Document File:  Six laning of Surat-Dahlsar Section of NH-8 from km 263.000 to Km 502.000 (Length Km 239.000) in the State of Gujarat and Mahara ...

    morthadmin - 04/23/2021 - 22:41 - 0 comments

  7. 4- laning of Rohtak to Hisar section of NH-10 (from km 87+000 to km 170+000) including connecting link from Km 87+000 (NH-10) to Km 348+000 (NH-71) to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III in the state of Haryana - Proposed Layout Plan for Granting the Permission to Lay 200mm Diameter Natural Gas Pipeline (CS Pipe) of “m/s HCG (KCE) Pvt. Ltd.” Along NH-10 (New NH-9) from Km. 157.912 (RHS) to Km. 176.430 (RHS) (Length 18518m) with one Crossing at Km. 169.500 (length 60m) (Total length 18578m) in District Hisar, State Haryana

    Upload Document File:  4- laning of Rohtak to Hisar section of NH-10 (from km 87+000 to km 170+000) including connecting link from Km 87+000 (NH-10) to ...

    morthadmin - 04/20/2021 - 10:27 - 0 comments

  8. 0507-2021-NHAI, Regional Office-Kerala-PIU-Palakkad-4 laning of Walayar - Vadakkanchery section from Km 182.250 to Km 240.000 (Design chainage Km. 182.250 to 236.135) of NH-47 (New NH 544) on DBFOT (Toll) basis under NHDP Phase –II in the State of Kerala (Package No. NS-2/BOT/KL-2) – Request for permission for overhead crossing of 110KV Double Circuit Power Transmission line at Km 233.200 of NH-544 by KSEB-Reg.

    Upload Document File:  0507-2021-NHAI, Regional Office-Kerala-PIU-Palakkad-4 laning of Walayar - Vadakkanchery section from Km 182.250 to Km 240.000 (D ...

    morthadmin - 04/09/2021 - 16:36 - 0 comments

  9. Six laning of Belgaum – Dharwad Section of NH-4 from Km.433.000 to Km.515.000 (Length – 79.36 Km) in the State of Karnataka to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase – V (Package No. NHDP –V/MC-II/19)– Granting of permission to lay OFC along NH-48 (Old NH-4)

    Upload Document File:  Six laning of Belgaum – Dharwad Section of NH-4 from Km.433.000 to Km.515.000 (Length – 79.36 Km) in the State of Karnataka to b ...

    morthadmin - 03/30/2021 - 10:50 - 0 comments

  10. NHAI, RO Jammu-PIU Jammu- PERMISSION FOR INSTALLATION OF TELECOM TOWER AT KM. 22+700 (LHS) AS PER REQUIREMENT FOR LEASE LINE IN THE PREMISES OF BANN TOLL PLAZA

    Upload Document File:  NHAI, RO Jammu-PIU Jammu- PERMISSION FOR INSTALLATION OF TELECOM TOWER AT KM. 22+700 (LHS) AS PER REQUIREMENT FOR LEASE LINE IN ...

    morthadmin - 03/23/2021 - 12:47 - 0 comments

Pages