Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Four laning of Kundapur - Surathkal Section of NH-66 (formerly NH-17) from Km.283.300 to Km.358.080 (Section 1), Nantoor to Mahaveer Circle (Km.375.300 to Km.376.700) and Mahaveer Circle to Talapady (Kerala Border) Km.3/700 to Km.17.200 in the State of Karnataka - Package No.NHDP-III/BOT/KNT/04. - Proposal for granting of permission for laying 660mm dia MS water supply pipeline from Thokkottu junction to near Talapady toll gate along NH-66 on LHS (6250mtrs) from Ch:9.730 to Ch:15.980 and laying 559mm dia MS water supply pipeline across NH-66 near Thokkottu junction using 1200mm dia MS casing pipe by Horizontal ramming by trenchless technology (45 mtrs) at Ch:9.880 under providing water supply scheme to Ullala city, Kotekar TP, enroute 25villages, Educational and other institutions with Nethravathi river as source in the State of Karnataka

    Upload Document File:  Four laning of Kundapur - Surathkal Section of NH-66 (formerly NH-17) from Km.283.300 to Km.358.080 (Section 1), Nantoor to Maha ...

    morthadmin - 03/01/2021 - 15:17 - 0 comments

  2. Proposal for grant of permission for lay OFC along NH-11 from Km. 266/0 to 289/0 (RHS} on Bikaner-Phalodi section for NOFN Project from Phalodi Over Bridge near Railway line to Khirwa Panchayat (near toll plaza), Phalodi, Distt-Jodhpur in the state of Rajasthan by BSNL

    Upload Document File:  Proposal for grant of permission for lay OFC along NH-11 from Km. 266/0 to 289/0 (RHS} on Bikaner-Phalodi section for NOFN Proje ...

    morthadmin - 02/19/2021 - 11:11 - 0 comments

  3. Four laning of Biaora to Dewas Section from km 426+100 to km 566+450 of NH-3 in the State of Madhya Pradesh under NHDP Phase-IV in BOT (Toll) basis on DBFOT pattern - Progosal for construction of an approach road & slab culvert for proposed retail outlet of Reliance BP Mobility Ltd. on New NH-52 (Old NH-3) at Ch. 323.116 RHS, Khasra No. 248/1/1, 248/1/2, 248/2/1 & 248/2/2, Village-Birgod, Tehsil-Tonk Khurd & Distt-Dewas in the State of Madhya Pradesh

    Upload Document File:  Four laning of Biaora to Dewas Section from km 426+100 to km 566+450 of NH-3 in the State of Madhya Pradesh under NHDP Phase-IV ...

    morthadmin - 01/04/2021 - 15:54 - 0 comments

  4. Four laning of Solapur to Yedshi Section of NH-211 from Km. 0/000 to 100/000 (Design Length - 98.717 Km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT Pattern under NHDP Phase - IVB - Submission of proposal for permission for laying optical fiber cable along NH-52 from Km.58/500 to Km.60/300 RHS & Km.60/300 to Km.62/300 LHS for a total length of 03.800 Kms. and road crossing at Km.60/300 in the State of Maharashtra.

    Upload Document File:  Four laning of Solapur to Yedshi Section of NH-211 from Km. 0/000 to 100/000 (Design Length - 98.717 Km.) in the State of Mahara ...

    morthadmin - 01/04/2021 - 12:10 - 0 comments

  5. NHAI, RO - Vijayawada - 6 laning of Chilakaluripet – Vijayawada section of NH-16 from Km.355+000 to 434+150 in the state of Andhra Pradesh to be executed as BOT(Toll) on DBFO pattern under NHDP Phase-V- Laying of Water supply pipeline along Highway from Km.401/680 to Km.401/950 on LHS and from Km.401/950 to Km.401/680 on RHS and crossing at Km.401/950 on NH-16 towards Vijayawada

    Upload Document File:  6 laning of Chilakaluripet – Vijayawada section of NH-16 from Km.355+000 to 434+150 in the state of Andhra Pradesh to be execute ...

    morthadmin - 12/15/2020 - 14:48 - 0 comments

  6. Six Laning of Samakhiali-Gandhidham (306+000 to 362+160) section of NH-8A (Total length Km.56.16) in the state of Gujarat to be executed as BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) under NHDP Phase-V

    Upload Document File:  Six Laning of Samakhiali-Gandhidham (306+000 to 362+160) section of NH-8A (Total length Km.56.16) in the state of Gujarat to be ...

    morthadmin - 11/03/2020 - 11:28 - 0 comments

  7. Permission Proposal for laying R-LNG pipeline along with underground Optical Cable the NH across at Km 115/382 (Trichy- Madurai section) of NH 45B near Chittampatti Toll Plaza- Narasingampatti Village Madurai district in the State of Tamil Nadu

    Upload Document File:  Permission Proposal for laying R-LNG pipeline along with underground Optical Cable the NH across at Km 115/382 (Trichy- Madurai ...

    morthadmin - 09/21/2020 - 12:27 - 0 comments

  8. Four Laning of Hospet – Chitradurga section of NH 13 (New NH-50) from km 299+000 to km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll) basis (“Project”) – Permission for laying of 4” Natural Gas Pipeline along with OFC to Cross NH-50 (Old NH-13) at Km.414+500 and along the Road from Km.414+500 to Km.414+390 in GR Halli Village

    Upload Document File:  Four Laning of Hospet – Chitradurga section of NH 13 (New NH-50) from km 299+000 to km 418+750 in the state of Karnataka under N ...

    morthadmin - 09/18/2020 - 14:01 - 0 comments

  9. Four Laning of Hospet – Chitradurga section of NH 13 (New NH-50) from km 299+000 to km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll) basis (“Project”) – Permission for laying of 4” Natural Gas Pipeline along with OFC to Cross NH-50 (Old NH-13) at Km.414+500 and along the Road from Km.414+500 to Km.414+390 in GR Halli Village

    Upload Document File:  Four Laning of Hospet – Chitradurga section of NH 13 (New NH-50) from km 299+000 to km 418+750 in the state of Karnataka under N ...

    morthadmin - 09/18/2020 - 11:05 - 0 comments

  10. Proposal for permission to lay two runs of 33 KV, 3C 400 mm2 HT UG Cables along NH bypass from Kazhakuttom (Km.0/00) to near existing toll booth (Km.6/840) of NH-66 for a total length of 6.84 Km

    Upload Document File:  Proposal for permission to lay two runs of 33 KV, 3C 400 mm2 HT UG Cables along NH bypass from Kazhakuttom (Km.0/00) t ...

    morthadmin - 09/03/2020 - 16:25 - 0 comments

Pages