Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Six laning of Chilakaluripet –Nellore section of NH-5 from Km 1182.802 to Km 1366.547 (length 183.620 km) in the state of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern – Kavali water supply improvement scheme under Amrut Project (2016-20) – Permission for laying of 200mm dia DI water supply pipe line with a carrier pipe line of 600mm dia. MS Pipe across NH-16 at Km.1313+150 at Maddurupadu Village near Kavali Mandal in the state of Andhra Pradesh

    Upload Document File:  3541 - Proposal to be uploaded(1).pdf ...

    morthadmin - 10/28/2022 - 10:31 - 0 comments

  2. 4/6 Laning of Thrissur (Km 270.000) to Angamali (Km 316.700) and Improvement, Operation & Maintenance of Angamaly (316.700) to Edappally (Km to 342.000) section of NH-47 (New NH-544) on BOT(Toll) basis in the State of Kerala-Laying of Natural Gas pipeline from Km.276+650-Km.294+300 and crossing at Km.276+650 and Km.282+150 of NH-544 by M/s IOAGPL

    Upload Document File:  1418-2022.pdf ...

    morthadmin - 09/13/2022 - 10:37 - 0 comments

  3. Four laning of Sambalpur Bargarh - Orissa / Chhattisgarh Border Section of NH-06 from Km.0.000 to 88.000 in the State of Orissa to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase-IIl - Proposal for Permission for laying of Irrigation Water Supply Pipeline across NH-53 pertaining Gangadhar Meher Lift Irrigation Project, Bijepur

    Upload Document File:  1821-1822-16.0.2022_00001.pdf ...

    morthadmin - 06/17/2022 - 10:18 - 0 comments

  4. Four laning of Sambalpur Bargarh - Orissa / Chhattisgarh Border Section of NH-06 from Km.0.000 to 88.000 in the State of Orissa to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase-II - Permission for laying 10” OD x 0.281" WT MS Natural Gas Pipeline along with 40 MM OFC duct LHS of the NH-6 and 90 mm MDPE pipeline both side of the NH-6 from chainage 0.000 (Ainthapali Chowk) to chainage 4.900 (Remed chowk) and one crossing 90mm MDPE pipeline at chainage 1.800 and one crossing 10” OD x 0.281" WT MS pipeline and 90 mm MDPE pipeline at chalnage 4.900 on NH-6 Remed chowk

    Upload Document File:  poijrebhufohiwqsajdwugfqwdwqsajd.pdf ...

    morthadmin - 06/15/2022 - 15:26 - 0 comments

  5. Six Laning of Surat-Dahisar Section of NH-8 from Km 263.000 to Km 502.000 (Length Km 239.000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V. Proposal for ROW Permission for laying 900mm Dia DIK 9 Pipeline parallel to NH-48 from Km 367+030 to Km 367+560 under Vapi City Underground Sewerage Line scheme in the state of Gujarat

    Upload Document File:  55. IPC_D-1633 dt. 06.06.2022_VNP_Km 367+030-Km 367+560_PD-Bharuch-152604(1).pdf ...

    morthadmin - 06/06/2022 - 14:36 - 0 comments

  6. Four laning of Solapur - Yedshi Section of NH-211 from Km. 0.00 to Km. 100.00 (Design length 98.717 km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase IVB - Submission of proposal for permission for laying optical fiber from Km.34/000 to Km.35/200 (1200 meter) on NH-211 (Working OFC which is damaged during the constructions of NH / MH State HW / PWD / ZP) laid under National Optical Fiber Network Project (NOFN)

    Upload Document File:  864-67382-876521-876213-87432(1).pdf ...

    morthadmin - 06/02/2022 - 10:15 - 0 comments

  7. O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 - Permission for laying of 3Cx400sqmm HT UG Cable from Km 17.995 to 18.055 and 250 m from the edge of the service road to EC-2 ramp slip road towards Toll plaza on LHS by HDD method

    Upload Document File:  igewjoiuhfwoijcsafsiuhfwq.pdf ...

    morthadmin - 05/31/2022 - 12:15 - 0 comments

  8. 4 laning of Kaithal Rajasthan Border Section of NH-152/65 from Km. 33.250 (Design km. 0.500) to km. 241.580 (Design Km. 165.759) in the State of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer ("DBFOT") Toll basis- Permission for Laying of underground pipeline of 700mm diameter crossing NH-52 at Km. 142.571 near Siwani Town District Bhiwani in the State of Haryana by HDD method

    Upload Document File:  02-283 dated 20.05.2022_00001.pdf ...

    morthadmin - 05/23/2022 - 10:40 - 0 comments

  9. Six-laning of Chilakaluripet - Nellore section of NH-16 from Km.1182.802 to Km1366.547 (length 183.620) in the state of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern - Permission of laying of OFC across NH-16 at 35 nos of locations

    Upload Document File:  1595(1).pdf ...

    morthadmin - 05/19/2022 - 13:43 - 0 comments

  10. RO - Vijayawada - Permission for laying of OFC Cable using HDD Method on NH-16 between KIMS Hospital Jn Km.718/600 to Akkireddy palem Jn Km.719/500 (900 Mts), Water Tank Jn Km.719/600 to Mindi Jn Km.720/300 (700 Mts), Sunrise Hospital Jn Km.721/800 to Celest Jn Km.722/800 (1000 Mts), Vadlapudi Rly Bridge Km.724/650 to Pavan Sai Hospital Jn Km.725/100 (450 Mts), near Toll Plaza Km.727/900 to Parveen Marble Km.729/000 (1100 Mts) and across at Km.718/600 (60 Mts), Km.722/000 (60 Mts), Km.722/800 (60 Mts), Km.727/900 (60 Mts), Km.729/600 (60 Mts) for a total length of 4450 Mts in Visakhapatnam District of Andhra Pradesh State

    Upload Document File:  1366 22.04.2022 Kims Hospital(1).pdf ...

    morthadmin - 04/27/2022 - 16:53 - 0 comments

Pages