Sorry, you need to enable JavaScript to visit this website.

You are here

  • Rehabilitation and up gradation to 4- laning of Teleibani- Sambalpur section of NH-53 (Km.493.300 ta Km.545.176 to Km.566.000) in the state of Odisha under EPC Mode- Permission for laying of underground Optical Fibre Cable from chainage 562+000 (Sindurpank) to chainage 567+500 (Ainthapali squre) (RHS) - 5.5 Kms & from chainage 563+500 (Bharat Benz) to chainage 567+900 (J.K. Automobiles) (LHS) - 4.4 Kms
  • Four Laning of Ausa-Chakur Section of NH-361 fram km 55.835 to km 114.600 (Design Length 58.51km) under Bharatmala pariyojna in the State of Maharashtra on Hybrid Annuity Mode-Proposal of M/s Maharashtra Information Technology Corporation Ltd. For permission for installation of Overhead Optical Fibre Cable on existing MSEDCL pole and / or erecting new poles along on NH-361, (1) Rajiv Gandhi Bus Sop of Mahatma Bzsweshwar Chowk Basweshwar Chowk Bus Stop km 73/000 to km 80/280 RHS Length - 2.28km, (2) Sirram Nagar to Aasta mode Bus Stop km 90/600 to km 35/950 RHS length - 5.05 km Total length 7.33 km
  • NOC for O/H crossing of NH-91 with 132 KV DC Gulaothi - Wair Transmission Line at Ch. 63.713, Village-Bilsuri (Chanderu), Tehsil-Sikandrabad, Distt.- Bulandshahr in the State of Uttar Pradesh
  • Laying of OFC cable through Aerial Method along NH-309B from MS 59.000 (Dhayari) to MS 77.000 (Panar), Total Length is 18.000 Km in the state of Uttarakhand
  • Access Permission for proposed private property of “ Tarc Green Retreat Pvt. Ltd.” at km.20.805 (RHS) on NH-8 (New NH-48) in village Samalkha, Tehsil- Mehrauli, District New Delhi.
  • NHAI-RO Kerala- Four laning of Thiruvananthapuram bypass from Kazhakuttam-Mukkola(Km.0+000 to Km.26+500) section of NH-47(New NH-66) under NHDP Phase-III in the State of Kerala -Laying of new KWA pipeline from Km.23+900-Km.24+540(LHS), Km.23+540-Km.23+670(LHS), Km.23+450- Km.23+670(RHS) and crossing of pipeline at Km.23+670 in Thiruvananthapuram Bypass
  • Proposal for permission for laying Optical Fibre cable (OFC) on NH along the NH- 167 road by M/s Telesonic Networks Limited from km 58/950 to km 62/800 (LHS) of Chintakunta — Adoni section of NH 167 for a total length of 3850mtrs in Kurnool District in the State of Andhra Pradesh
  • Proposal for permission for laying Optical Fibre cable (OFC) on NH along the NH- 67 road by M/s Telesonic Networks Limited from km 572/200 to km 589/400 (LHS) of Proddatur — Mydukur section of NH 67 for a total length of 17245mtrs in Kadapa District in the State of Andhra Pradesh
  • Proposal for Permission for laying Optical Fibre cable (OFC) on NH-167B (Mydukuru-Singarayakonda section) along the road from km. 154.300 to km. 175.750 (LHS) for a total length of 21.450kms in the Andhra Pradesh State
  • Proposal for granting permission lor laying proposed 12"O MS Steel Gas pipeline along NH-162A (Chittorgarh-Dabok) to develop City Gas Distribution Network in Fatehnagar & its surrounding areas Under Chittorgarh & Udaipur GA
  • ROW permission for laying of Optical Fiber Cable in NH-327E from Km. Ch. 203.800(Thalha North) to Km. Ch. 214.000(Bihara) Total length 10.200 Km. in the state of Bihar
  • ROW permission for laying of Optical Fiber Cable in NH-327E from Km. Ch. 195.300(Hussani Chowk) to Km. Ch. 199.00(Karanpur Tiraha) Total length 3.700 Km. in the state of Bihar
  • ROW permission for laying underground OFC on Delhi- Jaipur Highway, NH-48 area. (i) Chainage No. 36+800 km. to Chainage No. 39+200, Length=2400 m. (LHS towards Manesar) (ii) Chainage No. 37+950 km. to Chainage Mo. 39+100, Length=1150 m. (RHS towards Manesar)
  • Permission proposal for laying TWAD Board-Augmenation of Water supply Scheme to 708 habitations in Annur, Avinashi and Sullur Unions in Coimbatore and Tiruppur Districts-laying underground water supply pipe along the road 250mm dia DI water pipe line from Km 4/175 to 5/345(RHS) & road crossing at Km 4/175 of NH-381( Avinashi-Tiruppur-Avinashipalayam road) in Tiruppur district in the state of Tamil Nadu
  • Rehabilitation and Up gradation to Six-laning of Chandikhole-Bhadrak Section of NH-5 (New NH-16) form Km 62.000 to Km 136.500 in the State of Odisha to be executed on Hybrid Annuity Mode under NHDP Phase-V- Crossing of water pipe line at km 78.510 of NH-16 under Mega Piped Water Supply Project in Jajpur District
  • Permission for laying of Underground Optical Fiber Cable line along NH-8 (New NH-48) Km. 27.880 to 18.311 (RHS) and crossing at Km. 24.550 on NH-08 of Delhi -Gurgaon Section
  • O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 - Permission for laying of 1600 mm MS pipe with 2000mm MS casing pipe crossing the NH-7 road parallelly between KM 14/600 to KM 14/800 by trenchless Method
  • O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 - Issue of ROW permission for laying 11 KV(3Cx400Sqmm) HT UG Electrical cable on National Highway NH- 44(Bangalore-Hosur section) along the ROW from KM 18.400 to KM 18.610 on LHS by HDD Method and KM 18.610 to KM 20.800 on RHS in Utility Duct and 1 Nos NH Across crossing @ KM 18.610 by HDD Method
  • Proposal for Permission for laying Gas pipeline of 8” dia. Steel pipeline by M/s AG&P Gas Pvt. Ltd. along the NH-71 road from km 187/360 to km 190/600 (RHS) from near Swarnamukhi river to Pandluru road junction and crossings at km 187.360, km 189.300 & km 190.600 of NH-71 for a total length of 3286mtrs in Nellore District in the State of Andhra Pradesh
  • Proposal for granting permission to Amritsar CGD Network for laying of 8” dia steel pipeline to be laid parallel 462.340 to 462.830 (LHS), 472.635 to 472.535 (LHS) & 476.675 to 476.910 (LHS) and across at 473.595 to National Highway No.01 (old NH-01) in the State of Punjab by HDD method
  • Permission for laying of proposed RCC NP3 Pipe Line of 800mm internal diameter from km.17.950 to 18.950 (RHS) on old NH-22 (new NH-152) on Ambala- Chandigarh section at Lalru Mandi in the State of Punjab by HDD method
  • Permission for laying of 500mm diameter water pipe line along NH-205A (Kharar-Banur-Tepla section) from km.33.019 to km.36.483 by HDD method and one crossing at km.33.019 at Village Basma in the State of Punjab by HDD method
  • Proposal for grant of Permission for laying proposed underground Dl Water pipetine of M/s Godrej & Boyce Mfg. Co. Ltd., Vikhroli Mumbai along and across on Pen - Khopoti NH-166- D, from Km,23/200 to Km, 25/050, in the State of Maharashtra, Applicant: M/s Godrej & Boyce Mfg. Co. Ltd., Vikhroli Mumbai- Laying permission
  • Proposal for grant of Permission for laying proposed underground Dl Water Pipeline of M/s Godrej & Boyce Mfg. Co. Ltd., Vikhroli Mumbai along and across on Pen - Khopoti NH-166- D, from Km, 21/800 to Km, 23/200, in the State of Maharashtra, Applicant: M/s Godrej & Boyce Mfg. Co. Ltd., Vikhroli Mumbai- Laying Permission
  • Proposal of Permission to laying Optical Fiber Cable (OFC) along Arvi - Wardha road section of NH-647- at Ch. Km, 53/500 to KM, 53/00 (LHS) of road and across at Km, 53/100 in District - Wardha, total length 0.500 Mtrs, in the state of Maharashtra. Applicant: M/s Reliance Jio Infocomm Limited Corp. Office; 5th Floor Maker Chamber IV, Nariman Point, Mumbai. 400021
  • Proposal of Permission to laying Optical Fiber Cable (OFC) along Arvi - Wardha road section of NH-647- in section Wardha - Pipri at Ch. Km, 0/00 to KM, 1/800 (Both side) of road and across at Km, 1/800 in District - Wardha, total length 1800 Mtrs, in the state of Maharashtra. Applicant: M/s Reliance Jio Infocomm Limited Corp. Office; 5th Floor Maker Chamber IV, Nariman Point, Mumbai. 400021
  • Proposal of Permission to laying Optical Fiber Cable (OFC) along Arvi - Talegaon road section of NH-347-A at Ch. Km, 61/300 to KM, 63/00 (Both side) of road and across at Km, 62/119, 62/390 in District - Wardha, total length 4.400 Km, in the state of Maharashtra. Applicant: M/s Reliance Jio Infocomm Limited Corp. Office; 5th Floor Maker Chamber IV, Nariman Point, Mumbai. 400021
  • Permission for laying of pipeline of 350mm diameter for canal water for Distillery Plant on Zira-Faridkot section from km.183.600 to km.188.800 (RHS) and one crossing at Km.188.800 by HDD method across NH-54 at Village Mansoorwala, Tehsil Zira,District Ferozepur in the state of Punjab
  • Permission proposal for laying underground water supply pipe along the road from Km 93/600 to 95/800(RHS) of NH-230(New NH-85)(Madurai- Thondi road) in the state of Tamil Nadufor providing CWSS to 8Town Panchayats 2452 Rural Habitations and bulk provision to 3 Municipalities in Sivagangai District
  • Permission for laying of underground gas pipeline (8" dia of Steel Pipe and 125mm dia MDPE gas pipeline) of M/s Indraprastha Gas Limited from existing Ch. 59+800 to existing Ch. 61+700 along left-hand side of the National Highway. The total section length for ROW applied is 1.9km on along Meerut-Karnal Road, National Highway, New NH-709A (Old SH-82) in the State of Uttar Pradesh
  • Laying of OFC cable along and across Km 19/820 to Km 20/520 on RHS including Road crossing at Km 20/520 (Total length=760m) on NH-44
  • Proposal for NOC permission for underground water supply pipeline pipeline laying & crossing by HDD method in Km.226.300 to km.229.300 (Shaktinagar to Renukoot section) of NH- 75E (New NH-39) in District -Sonebhadra in the state of Uttar Pradesh
  • Proposal for NOC permission for underground water supply pipeline pipeline lying & crossing by HDD method in Km.215.104 to km.230.600 and km.230.627 to km.238.584 (Shaktinagar to Renukoot section) of NH-75E (New NH-39) in District -Sonebhadra in the state of Uttar Pradesh
  • Permission proposal for laying TWAD board -water supply improvement scheme(WSIS) to added areas of Coimbatore Corporation with Bhavani as source(Pillur-Ill)- laying underground water supply pipe along the road 1016mm dia water pipe line from Km 21/930 to 22/032(RHS) & road crossing Km 21/930 of NH-381( Coimbatore to Mettupalayam road section) in Coimbatore district in the state of Tamil Nadu
  • Proposal for NOC proposal for the permission for laying of 4" Dia Steel Pipeline along the Km. 58.100 to Km. 58.770 and 6" Dia steel pipeline at km. 53.840 across NH-58 (Meerut-Muzaffarnagar Section) to develop CGD Network in District-Meerut in the State of Uttar Pradesh
  • Permission for laying of 11KV underground electrical cable for separation of agriculture Consumer and associated work at Ch. 13.100, 20.530, 21.150 & 25.868 of Agra-Gwalior section of NH-3 (New NH-44) - Km 230.080 of NH-46 } on LHS and crossing at 96+600 Km (KM 222.030 of NH-46 from RHS to LHS)- Recommendation for issuance of permission as per MoRT&H Guideline dated 22.11.2016 and Section-38 of Chapter VI of “The Control of National Highways (Land & Traffic) Act, 2002”.
  • NOC for permission of laying 30” dia underground Hydrocarbon pipeline along with OFC duct of IOCL across NH-116B at km 2.150 for proposed Haldia-Barauni underground Hydrocarbon pipeline in West Bengal
  • NHAI, PIU — Viluppuram — (N/04022/03001/TN) - Proposal seeking NOC & Permission for laying of underground sewerage pipeline from Km.121/250 to Km.121/690 (LHS), from Km.122/060 to Km.122/800 (LHS) and Km.123/000 to Km.123/150 (LHS) with Manhole (2mx2m) at 30m spacing and crossing at Km.123/380 for dedicated sewerage scheme to Tindivanam Municipality of NH-45 (Tindivanam to Ulundurpet section) in the state of Tamilnadu
  • NHAI, Madurai Region – Highway Administration – Permission for shifting and relocating of 6 nos of EHT Towers under PIU, Tuticorin by the Superindenting Engineer, TNEB, General Construction Circle, Madurai from Km 260/000 to 261/500 (RHS) in Madurai – Aruppukottai – Tuticorin section of NH-38(Old NH No.45B) in the state of Tamilnadu
  • NHAI, Madurai Region – Highway Administration – Permission for Construction of Strom Water Drain under PIU, Tuticorin - Construction of Strom Water Drain by Thoothukudi City Municipal Corporation, Thoothukudi Storm water drain from Km 260/000 to 261/500 (RHS) in Madurai – Aruppukottai – Tuticorin section of NH-38 (Old NH No.45B) in the state of Tamilnadu
  • Balance work of 4-laning of Fagne- Maharashtra / Gujarat Border Section of NH-6 from Km.510.000 to Km.650.794 in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojna- Proposal for trenching and laying OFC cables with Ducts (2 Ducts) at NH-6 from Shewali village Ch. km 571.800 to Sakri city km 575.200 Total length 3.4 kms
  • Proposal for permission for installation of Overhead Optical Fibre Cable on existing MSEDCL pole and/ or erecting new poles along on NH-361, Loha- Waranga & Waranga Mahagaon Road Ch. km 252.400 to km 260.120 the total length of 7.72 kms in the State of Maharashtra
  • Four Ianing of Ausa- Chakur section of NH-361 from km 55.835 to km 114.600 (Design length 58.51 km.) under Bharatmala Pariyojana on Hybrid Annuity Mode -Proposal of M/s Telesonic Networks Ltd. for permission for Trenching and laying of OFC Telecom Ducts / Cable (01 Nos) along NH Jurisdiction of NH-361 from km 75.100 to km 78.200 on Right Hand Side for the section of total length 3.100 kms under NHAI PIU Nanded
  • NHAI-RO Kerala-Accomodation of Public and Industrial Utility Service along National Highways-Laying of PLB Duct and OFC through Open trenching/HDD/existing duct by BSNL from Chinnakkada to Elampalloor (Km.0+000 to Km.12+150) of NH-744
  • Six laning of Vadodara- Bharuch Section from Km 108.700 to Km 192.000 of NH-8 in the state of Gujarat on BOT basis (BOT Package-l). - Proposal for ROW Permission for laying of Utility Services Across at Km 143+600 and Along from Km 140+860 to Km 143+600 on RHS (Total 2.740 Kms) & from Km 143+600 to Km 140+350 on LHS (Total 3.15 Km)(Total Length 5+890 Kms) on NH-48 for connectivity of Piped Natural Gas (PNG) to Por Ramangamdi GIDC, Por Village and Surrounding area.
  • Submission of Kolkata Enviornmental Improvement Investment Program (KEIIP) for laying of 500mm dia underground water pipeline across NH-117 at revised km 22.780 (old km 22.760) at Mouza-Joka, P.S. Thakurpukur, Dist. South 24 Parganas, State-West Bengal
  • Submission of Kolkata Enviornmental Improvement Investment Program (KEIIP) for laying of 300mm & 150mm dia underground water pipeline along RHS of NH-117 from km 22.790 to km 23.818 (old km 22.772 to km 23.818) at Mouza-Joka, P.S. Thakurpukur, Dist. South 24 Parganas, State-West Bengal
  • Submission of Kolkata Enviornmental Improvement Investment Program (KEIIP) for laying of 400mm & 150mm dia underground water pipeline along RHS of NH-117 from km 22.790 to km 23.168 (old km 22.765 to km 23.168) at Mouza-Joka, P.S. Thakurpukur, Dist. South 24 Parganas, State-West Bengal
  • Permission for laying of 33kV Underground Cable in front of Teok 33/11 kV Teok Sub Station by APDCL, Teok Electrical Division: Application for Grant of crossing permission at Km 482.807 of NH-37
  • Laying of Clear Water rising Main and Distribution pipeline along & across NH-143 for execution of 02 nos, individual RPWS Project to Kuarmunda & Nuagaon blocks of Sundargarh district by the Superintending Engineer, RWS&S Division, Rourkela
  • Proposal for NOC for overhead crossing of 132 KV S/C overhead transmission line (Bisalpur - Bisalpur TSS Line) at km.32.850 of NH-730B (Bisalpur - Bareilly Section) in the State of Uttar Pradesh
  • Proposal for NOC for overhead crossing of 132 KV S/C overhead transmission line (Bisalpur - Bisalpur TSS Line) at km.42.100 of NH-731K (Bisalpur - Shahjahanpur Section) in the State of Uttar Pradesh
  • Proposal for Laying Optical Fibre Cable along SH 4 from Khadphra to Nongiri Ch. Km 0+000 to km 30+000 for a total length of 30 km in the Ranikor-Maheshkhola- Baghmara (R-M-B) Project Highway
  • NHAI, Madurai Region - PIU, Trichy - Permission for erection of 22 KV HT line EB Pole along the road from Km 409/962 to Km 410/285 on LHS, from Km 410/285 to Km 410/400 on RHS & across NH at Km 410/285 at Paraipatti Village in Trichy - Dindigul section of NH-45 (New NH-83) in the State of Tamil Nadu - Proposal submitted
  • Construction of four laning of Nagpur-Katol section of NH-353J from km. 13.000 to km. 62.900 (Design Chainage) in the State of Maharashtra under NH(O) on EPC Mode-Permission of laying of 18" dia Natural Gas Pipeline alongwith 40mm OFC cross National Highways 353J at km 19+139.60, village Pipla Taluka Kalmeshwar, Dist. Nagpur
  • Proposal for Overhead crossing of NH-509 by 132 KV D/C Hasanpur Sambhal (400 KV) Transmission line between Km. 68 & 69 near Pathakpur, District- Sambhal, Uttar Pradesh
  • ROW permission for laying optical fiber cable at location Gulab Baag to ACB office Karauli
  • Permission proposal for laying underground water pipe line along the road from Km 72/700 to 75/100(LHS) & Km 75/100-93/600(RHS) Total 20.900km and 13 crossing in between Km 74/400-74/500, between Km 75/00-75/100, between Km 75/700-75/800, between Km 76/600-76/700, between Km 77/900-78/000, between Km 78/300-78/400, between Km 82/300-82/400, between Km 82/700-82/800, between Km 84/300-84/400, between Km 85/400-85/500, between Km 89/500-89/600, between Km 90/200-90/300, between Km 91/000-91/100 Madurai-Thondi road of NH-230(New NH-85) for providing CWSS to 8 Town Panchayats and 2452 Rural Habitations with Buk provision to 3 Municipalities in Sivagangai District with River Cauvery as source (Package III) in the state of Tamil Nadu
  • RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State Fiber Net Limited) using HDD Method across the road of NH-65 at Km. 21/500, Km.23/200 and Km.24/600 for a total length of 180 mtrs (Across the road each 60 mts) in Vuyyuru Mandal, Machilipatnam, Krishna District of Vijayawada -Machilipatnam section of NH-65
  • Permission for overhead crossing of 132 kV Bhadrekhi Orai (400 M/s BSUL Kalpi Solar project line @ 400 kV Sub-Station Bhadrekhi Orai between Ch.1524+360 on NH-27 near villagr-Aata, Distt- Jalaun
  • Operation and Maintenance of 4 lane divided Carriageway facility of Tada - Nellore (Km.52.8 to Km.163.6) section of NH-5 constructed on BOT basis in Andhra Pradesh - Permission for laying of Optical Fibre Cable (OFC) of M/s. APSFL across NH-16 at 29 No of locations
  • Six-laning of Chilakaluripet - Nellore section of NH-16 from Km.1182.802 to Km1366.547 (length 183.620) in the state of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern - Permission of laying of OFC across NH-16 at 35 nos of locations
  • NHAI-PIU-NSK- Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 from Km 380.000 to 440.000 in the State of Maharashtra - Maharashtra Natural Gas Limited’s (MNGL) Proposal for laying Gas Pipeline from Km. 411.382 to Km. 409.200 (LHS) and Km. 409.200 to Km. 406.100 (RHS), Total length- 5.282 Km & 2 Crossing at Km. 409.200 & Km. 406.100 on NH-3
  • Proposal for NOC permission for underground water supply pipeline pipeline laying & crossing by Trenchless HDD method in Km.290.00 to km.302.500 in both side of National Highway of NH-75E (New NH-39) (Renukoot to Jharkhand Border section) in District -Sonebhadra in the state of Uttar Pradesh
  • Grant of ROW permission for laying of underground 125mm dia MDPE pipeline along NH-71 from Ch. 178/450 to Ch. 179/770 (length 1320 mtrs) on LHS by open cut method and 4” dia steel pipeline & 125mm dia MDPE pipeline in one trech along NH-71 from Ch. 179/770 to 182/270 (length 2500 mtrs.) by open cut method and 125mm dia MDPE pipeline along NH-71 from Ch. 179/680 to Ch. 182/270 (length 2590m) on RHS by open cut method & two crossings for 4” dia steel pipeline (Casing pipe 8” dia), one at Ch. 178/450 (width 60 mtrs) and another one at Ch. 179/810 (width 30 mtrs) on NH-71 by HDD Method
  • Laying of underground 12” Steel Gas Pipeline along NH-50 from Km.360.275 to Km.415.000 and across at Km.375.951 and Km.377.192 and installation of underground sectionalizing Valve (Chamber Size 2.85 m x 2.40 m) in Bidar and Gulbarga District
  • Four Ianing of Tarsod to Fagne section of NH-6 from km 422.700 to km 510.000 in the State of Maharashtra to be executed as Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV (Package-II-B)-Permission of laying and crossing of OFC of M/s Jio Digital Fiber Pet. Ltd. Across National Highway NH-53 for the total length of 6.240 km at Jalgaon city and Nahata Chowk
  • Proposal for laying underground Telecom Cable at NH-6 RHS Jalgaon Road Chainage km 518/300 to LHS km 520/200 total length 1.9 km
  • NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 5.65 Km from Km.?05+563 ta Km,.?1?+02? (RHS) along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.206+463, Km. 209+913, and Km, 212+022 on Warangal to Khammam section of NH-563 in the State of Telangana
  • NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 10.53 Km from Km.146+050 to Km.146+800 (RHS), Km. 167+400 to Km.175+000 (RHS), and Km. 175+000 to Km. 177+000 (LHS), along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.167+400, Km. 167+650, Km. 174+450, Km. 171+460, Km. 174+850, and Km. 175+000 on Warangal to Khammam section of NH-563 in the State of Telangana
  • 4 laning of Kaithal Rajasthan Border Section of NH-152/65 from Km. 33.250 (Design km. 0.500) to km. 241.580 (Design Km. 165.759) in the State of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer ("DBFOT") Toll basis- Permission for Laying of underground pipeline of 700mm diameter crossing NH-52 at Km. 142.571 near Siwani Town District Bhiwani in the State of Haryana by HDD method
  • Proposal for NOC for the pipeline carrying drinking water from Labhandih Chowk to Bhatagaon Chowk via Telibandha chowk, Pachpedi Naka from Km. 266.09 to Km. 273.57 at NH-06 under Mission Amrut Phase-II In NH-06 (New NH-53)
  • NHAI - RO Hyderabad - PIU Nirmal- Proposal for laying of Optical Fiber Cable for a total length of 3.33 Km from Km.450+475 to Krn.452+225 (LHS), and Km.461+140 to Km.462+600 ({RHS), along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.450+475 and Km. 4524225 on Nagpur ta Hyderabad section of NH-44 in the State of Telangana
  • RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State Fiber Net Limited) using HDD Method across the road of NH-65 at Km. 11/250, Km. 13/465 and Km.21/100 for a total length of 180 mtrs (Across the road each 60 mts) in Kankipadu and Vuyyuru Mandals, Machilipatnam, Krishna District of Vijayawada - Machalipatnam section of NH-65
  • RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State Fiber Net Limited) using HDD Method across the road of NH-65 at Km. 31/600, Km.38/600, Km.45/980, Km.51/900, Km.55/250 and Km. 63/670 for a total length of 360 mtrs (Across the road each 60 mts) in Vuyyuru Pamarru, Movva, Guduru and Machilipatnam Mandals, Machilipatnam, Krishna District of Vijayawada -Machalipatnam section of NH-65
  • Laying & crossing telecom cables / OFC / ducts in stretches of Aurangabad & Paithan blocks of Aurangabad district along Solapur - Dhule road section of NH-52 (old NH-2311) from km 247.050 to km 286.900 & 8 numbers of crossing having total length 20.15 km
  • Permission to lay 12” dia Natural Gas Pipeline along with OFC Cable across National Highway-320 at Ch. Km. 24+390 & Pipeline Ch. 1+129 for Tie-in Connectivity of ONGC Bokaro into JHBDPL Network
  • Permission for laying of Optical Fiber Cable by aerial methodology on existing MSEDCL Pole and I or erecting new poles along NH-52 starting from Taluka Office T point to Bhambarwadi village total length 28.900
  • Four/Six Laning of Gujarat/ Maharashtra Border - Surat - Hazira Port Section of NH-53 (old NH-6) (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Reg. Proposal seeking ROW Permission for Crossing of Drainage line for 1400mm Dia MS Pipe Pushing Work on Hazira Dhuliya NH-53 at km 22+170 near Dumas Road-ONGC Bridge Junction Surat in the state of Gujarat
  • Four/Six Laning of Gujarat/Maharashtra Border-Surat-Hazira Port section of NH-6 (approx. Length 131.500 Km) in the state of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Reg. Proposal for ROW Permission of laying Pipeline near Unn-Gabhani Junction at Gabhani Khadi Bridge- Across NH-53 at Km 33+800 and Km 33+840 in between Km 33+000 and Km 34+000 by Boring & Pushing Method (HDD Method)
  • Laying of HDPE pipeline dia 6”/8 for treated water supply on NH-62 from 2.05 km to 11.45 km.(Total km.9.4000km) ( In between NH-52 & NH-62) Jaipur Jodhpur bye pass, Bikaner state of Rajasthan
  • Rehabilitation and up-gradation of existing 2 lane to 4-lane standards of Rimuli (Km 163.000) to Koida (Km 206.200) Section of NH-215 (New NH-520), Le. Package-lin the State of Odisha on EPC Mode under NHDP Phase-Ill on EPC Mode & Rehabilitation and up-gradation of existing 2 lane to 4- lane standards to Koida (Km.206.200) to Rajamunda (km.259.453) Section of NH-215 (New NH- 520), ie., Package-ll in the State of Odisha under NHDP Phase Ill on EPC Mode- Request for installing 600mm Dia Pipe Conveyor and 33 kV insulated cable over an overhead structure with 1700mm width along the LHS of NH Utility Corridor in Rimuli- Rajamunda section of NH- 520 from Km.204.000 to Km.212.000 by M/s JSW USL
  • Permission for laying of steel gas pipeline (8” dia) & MDPE pipeline (90 mm dia) parallel to NH-316 (Bhubaneswar: Puri) from Km.13.700 to Km.53,000 (Uttara Chowk to Tulasi Chaura Chowk) & from Km.13.700 to Km. 16.000 (Uttara Chowk to GAIL LCNG Plant)
  • Permission for crossing of GAIL's 8” dia steel Natural Gas Pipeline along with 40 mm duct for OFC across NH-316 (Bhubaneswar- Puri) at Km.55+637 in village- Harekrushnapur, Tehsil- Purisadar in Puri District
  • Proposal for laying of OFC by M/s Dinesh Engineers from Km 184/040 to 187.000, for a Total length of 2.960 Km along Haggari Raichur Jadcherual Road Section of NH-167 in the State of Telangana
  • Permission for laying GAIL's 8” dia steel Natural Gas Pipeline along with 40 mm duct for OFC across NH-316 (Bhubaneswar- Puri) from Km.16.110 to Km.16.420 (310 meters) and across to NH at Km.16#420 in Village- Pabasan, Tehsil- Pipili in Puri District
  • Permission for laying of 02 Nos. 3x300mm XLPE Cable width 150mm each dia Pipeline (HDPE) from Km. 558.980 to Km.558.976 along with NH-19 (Bilinda- Allahabad Section) total length of ROW applied for 86 mtr. and once crossing (100 mtr.) 558.976 at Haswa near Village-Bilinda in Distt. Fatehpur in the State of U.P, by PVVNL
  • Permission for laying of 02 Nos. 3x300mm XLPE Cable width 150mm dia each Pipeline (HDPE) across with NH-19 (Chak Katoghan - Allahabad Section) one crossing at Ch.588.152 at Haswa near Village-Katoghan & Bilinda Canal in District Fatehpur in the State of Uttar Pradesh
  • Permission for laying of 02 nos. 40 x 40mm duct (Pipe) HDPE along at Chainage 490.340 to Ch.491.840 (1500m) and Ch.541.310 to Ch.542.410 (1100m) of Chakeri - Allahabad Section of NH-19 in the State of Uttar Pradesh
  • Proposal seeking Permission for laying of OFC alon NH -73 (Old -NH-234) from Bantwal Km 20.100 to Jakribettu Km 24.100 (RHS) and one Road Crossing at Km 20.100 for the total length of 4.00 Kms by M/s Telesonic Network Limited through HDD method
  • Proposal for Permission to lyaing of underground Electrical cable across Nagpur - Umred - Bhiwapur - Nagbhid - Bramhapuri - Armori road section of NH -353- D @Km, 97/560 at - Nagbhid in Taluka - Nagbhid, District: Chandrapur in the State of Maharashtra
  • Proposal for permission to laying Steel Gas Pipeline along NH-65 Pune - Solapur Road from Balaji CNG sation Km, 10/100 to Shivaji Service station Manjari Km, 10/750 in LHS Taluka Haveli Dist; Pune, in the state of Maharashtra. Applicant: M/s GA, Maharashtra Natural Gas Ltd, A-Block, Plot No.27, Narveer Tanajiwadi, PMPML Commercial Building Shivajinagar Pune-411005
  • Proposal seeking permission for laying of underground 12’’dia steel Gas pipeline along NH-69 (Old NH-234) from Km 278.980 to Km 288.670 (RHS) and 1 no. crossing at Km 288.670 in the State of Karnataka by AGP City gas private limited through open trench/HDD push technique method
  • 4-Laning of Rohtak -Bawal section NH 71 from km 363.300 (Design km 363.300) to km 450.800 (Design km 445.853) under NHDP III in the state of Haryana on Design, Build, Finance, Operate and Transfer (DBFOT) basis -NOC case for laying of Over Head Electrical line (11kv line) from Km. 416.300 (RHS) to Km. 419.950 (RHS) and one crossing at Km. 419.950 (length 60m) by HDD method (with total no. of poles Approximate 150) on NH-71 (New NH-352) (Jhajjar to Rewari road), in the State of Haryana
  • Four laning of Jorabat-Barapani section of NH-40 from 0+00 to 61+800 in the State of Meghalaya under SARDP-NH on BOT(Annuity)basis- Request of final NOC of fuel station (Retail Outlet) on a plot of land abutting on the LHS boundary of NH-6 towards increasing chainage at Km 14,995 at village: Narang(Umling), PO: Umling, Elka-Nogpoh Sirdar ship Dist: Ri Bhoi, Meghalaya
  • Proposal for grant of Permission for Laying of Sewer Line along the NH-15 (New NH-S4) from Km 71.040 to 71.350 (RHS) and crossing of NH at 71.350 at Dhir road, Batala Town, District - Gurdaspur in the State of Punjab by HDD Method
  • Proposal for permission for laying underground 150mm dia sewer pipeline (MS Pipe) from km.1576.474 to km.1577.909 (1435 mtr.) on NH-27 (Old NH-25) Jhansi - Kanpur Section at Village - Bara District - Kanpur Dehat in the State of Uttar Pradesh
  • Proposal for grant of permission for overhead crossing of 132 KV LILO from 132 KV S/C Bhadoti-Bagdi Line to 132 KV GSS Bonli Crossing near Ch. 251+300 of NH-148N (Delhi- Vadodara GF Expressway) in the state of Rajasthan by RVPNL
  • Proposal for Permission to Trenching and Laying Optical Fiber Cable (OFC) along across with on Patur - Balapur road, section of NH-161-G from Ch.in Km, 8/850 (Wadegaon T-point) to 18/950 (Babulgaon T-point) Total Length-10.100 Km, in Taluka- Patur, District: Akola in the State of Maharashtra. Applicant: M/s Telesonic Network Pvt Ltd., Pune
  • Permission proposal for laying underground “City Gas Distribution (CGD)” pipeline along the National Highways from Km 4/195 to 7/340(LHS) of NH-381 (Tiruppur-Avinashi Highway) in the state of Tamil Nadu
  • Proposal for ROW permission for crossing and parallel line of Water supply pipeline on NH-27 Kandala-Morbi Highway from Km 237+700 to Km 253+300 for “MAHENDRANAGARPipli (Augmentation of MMJ) Regional WSS BASED on NC-7 Morbi” from Bamanbore- Garamore section (Km 182+600 to Km 254+537) NH-27 in the state of Gujarat
  • Proposal for Permission to carry out replacement of Damged Optical Fiber Cable (OFC) for BBNL (Govt.of India Enterprise) along Talegaon - Gonapur road, section of NH-347-A at Ch.in Km, 5/680 (Mamdapur) to 15/300 (Ashti) and at Ch. In Km, 19/800 (Ashti Forest end) to 25/800 (Sahur) in Taluka-Ashti, District: Wardha in the State of Maharashtra. Applicant: M/s Bharat Broadband Network Limited, Nagpur
  • Proposal for Permission to carry out replacement of Damaged Optical Fiber Cable (OFC) for Bharat Broadband Network Limited (Govt.of India Enterprise) along Nandgaon Peth - Morshi road, section of NH-353-K at Ch.in Km, 39/130 (Simbhora) to 94/500 (Umerkhed Phata) and NH-353-J at Ch. In Km, 0/00 (Morshi) to 16/510 (Khed Phata) in Taluka-Morshi, District: Amravati in the State of Maharashtra. Applicant: M/s Bharat Broadband Network Limited, Nagpur
  • O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 - Permission for laying of 3Cx400sqmm HT UG Cable from Km 17.995 to 18.055 and 250 m from the edge of the service road to EC-2 ramp slip road towards Toll plaza on LHS by HDD method
  • Permission for laying 33 KV Electric Utility line from km 491.250 (Start of Seloo bypass) to km 507.550 (Proposal Interchange with NH-353-1) on Wardha-Butibori section of NH-361 (Total length 16.30 km) (Overhead 15.48 km & underground 0.820 km)
  • NHAI - RO Hyderabad - PIU Khammam- Proposal for crossing of 400KV D/C Hyderabad Kurnool Transmission line - Crossing of 400 KV D/C line between Km. 156/000 to Km. 157/000 on Warangal to Khammam section of NH-563 in the State of Telangana
  • NHAI - RO Hyderabad - PiU Hyderabad- Proposal for laying of Optical Fiber Cable for a total length of 7.575 Km from Km. 43+800 to Km.43+900 (RHS), from Km.43+900 to Km.44+600 (LHS), from Km. 44+600 to Km. 48+460 (RHS), from Km.48+515 to Km. 48+565 (LHS) from Km, 48+515 lo Kim.49+400 (RHS), from Km. bU+UUU to Km. 51+410 (RHS) and from Km.51+500 to Km.51+800 (RHS), along NH-765 and Highway crossings at Km. 43+800, km.43+900, Km.44+600, Km. 47+800, Km. 48+515, and Km 50+000 by HDD methodology on Hyderabad to Srisailam section of NH-765 in the State of Telangana
  • Proposal for grant of permission for crossing 90mm dia pipeline of Irrigation at Km. 247 of NH- 68, Ramji Ka Gol to Gandhav section in Barmer in the state of Rajasthan by Narada Canal Project Div.-IV, Sanchore
  • Proposal for grant of permission for laying 18” /12/8” Carbon Steel and 125mm MDPE underground Natural Gas Pipeline from Km. 121.660 (Neemrana RIICO) to Km. 176.750 (Tirupati FS, Paota village) along NH-48 and three nos. crossing at Km 121.660, Km. 141.600 and Km. 176.708 at Jaipur & Alwar Distts in the state of Rajasthan by M/s. Torrent Gas Pvt. Ltd.
  • Proposal for grant of permission for laying of electric cable line along NH-8 (new NH-48) at Ch. 46.777 to 47.035 (RHS) and crossing at Ch, 46.650 (LHS) on Gurugram-Jaipur section of NH8 (48) by M/s. Haryana Vidhyut Prasaran Nigam Ltd. (HVPNL)
  • Four laning of Solapur - Yedshi Section of NH-211 from Km. 0.00 to Km. 100.00 (Design length 98.717 km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase IVB - Submission of proposal for permission for laying optical fiber from Km.34/000 to Km.35/200 (1200 meter) on NH-211 (Working OFC which is damaged during the constructions of NH / MH State HW / PWD / ZP) laid under National Optical Fiber Network Project (NOFN)
  • ROW permission for laying of Sewage Pipeline on NH-19 from Km, Ch. 2+345 to Km. Ch. 2+481, Total length 136m in the state of Bihar