Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Four laning of Sambalpur Bargarh - Orissa / Chhattisgarh Border Section of NH-06 from Km.0.000 to 88.000 in the State of Orissa to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase-IIl - Proposal for Permission for laying of Irrigation Water Supply Pipeline across NH-53 pertaining Gangadhar Meher Lift Irrigation Project, Bijepur

    Upload Document File:  1821-1822-16.0.2022_00001.pdf ...

    morthadmin - 06/17/2022 - 10:18 - 0 comments

  2. Four laning of Sambalpur Bargarh - Orissa / Chhattisgarh Border Section of NH-06 from Km.0.000 to 88.000 in the State of Orissa to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase-II - Permission for laying 10” OD x 0.281" WT MS Natural Gas Pipeline along with 40 MM OFC duct LHS of the NH-6 and 90 mm MDPE pipeline both side of the NH-6 from chainage 0.000 (Ainthapali Chowk) to chainage 4.900 (Remed chowk) and one crossing 90mm MDPE pipeline at chainage 1.800 and one crossing 10” OD x 0.281" WT MS pipeline and 90 mm MDPE pipeline at chalnage 4.900 on NH-6 Remed chowk

    Upload Document File:  poijrebhufohiwqsajdwugfqwdwqsajd.pdf ...

    morthadmin - 06/15/2022 - 15:26 - 0 comments

  3. Four Laning of Ahmedabad to Godhra Section of NH-59 from Km 4+200 to Km 122+420 in the state of Gujarat on DBFOT Basis under NHDP Phase-lll. - Proposal for ROW permission for laying and crossing proposed 12” Steel & 6” Steel Gas Pipeline Along NH-47 From Km 89+729 to Km 89+181 (RHS)(Line-3), from Km 89+181 to Km 79+851 (LHS)(Line-3), from Km 80+147 to Km 76+316 (RHS)(Line-6), Asphalt Road Km 89+834 to Km 89+729 (To Sevaliya) Approach Road-105+24 Mt. (Line-3), Asphalt Road Km 79+851 to Km 80+023 (To Balasinor)-Approach Road-72+34 Mt. (Line-3) & Across NH-47 at Km 89+181 (Line-3), at Km 80+147 (Line-6)(Ahmedabad Indore) to develop City Gas Distribution Network in Ladvel, Sevaliya,Balasinor and its surrounding area of Kheda & Mahisagar GA

    Upload Document File:  58. IPC_D-1701 dt. 13.06.2022_Adani Total Gas_Km 89+181_PD-Abad-143985(1).pdf ...

    morthadmin - 06/13/2022 - 17:34 - 0 comments

  4. Rehabilitation and up gradation to 4- laning of Teleibani- Sambalpur section of NH-53 (Km.493.300 to Km.545.176 to Km.566.000) in the state of Odisha under EPC Mode- Permission for laying of underground 33 KVA XLPE Cable

    Upload Document File:  1715-1716_00001_528282538.pdf ...

    morthadmin - 06/09/2022 - 07:58 - 0 comments

  5. Four/Six Laning of Bharuch to Bharuch (Km 198+00 to Km 263+000) section of NH-8 in Gujarat on BOT Basis, Package BOT-2. Reg. Proposal for ROW Permission of laying of proposed 125mm @ PE U/G Gas Pipeline Along Km 259+337 to Km 260+144(LHS) & Km 259+337 to Km 260+281(RHS) and Across at Km 260+055, 260+100, 260+121 of NH- 48 (Ahmedabad-Mumbai) (Umbhel-Kadodara) and across Asphalt Road (NH-48 Service Road) to connect Sarvajanik Smashan Gruh and other domestic, commercial & industrial prospect in Kadodara at Taluka-Kamrej & Palsana, District-Bharuch of Bharuch GA in the state of Gujarat

    Upload Document File:  57. IPC_D-1657 dt. 07.06.2022_GGL_Km 259+337-Km 260+144_PD-Bharuch-148937_00001.pdf ...

    morthadmin - 06/08/2022 - 15:01 - 0 comments

  6. Four/Six Laning of Gujarat/ Maharashtra Border-Surat-Hazira Port section of NH-6 (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Reg. Proposal for ROW Permission of laying Pipeline near Unn-Gabhani Junction at Gabhani Khadi_bridge- Across NH-53 at Km 33+020 and Km_33+060 in between Km 33+000 and Km 34+000 by Boring & Pushing Method (HDD Method)

    Upload Document File:  56. IPC_D-1639 dt. 06.06.2022_Colourtex_Km 33+020-Km 33+060_PD-151367_00001.pdf ...

    morthadmin - 06/06/2022 - 17:38 - 0 comments

  7. Six Laning of Surat-Dahisar Section of NH-8 from Km 263.000 to Km 502.000 (Length Km 239.000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V. Proposal for ROW Permission for laying 900mm Dia DIK 9 Pipeline parallel to NH-48 from Km 367+030 to Km 367+560 under Vapi City Underground Sewerage Line scheme in the state of Gujarat

    Upload Document File:  55. IPC_D-1633 dt. 06.06.2022_VNP_Km 367+030-Km 367+560_PD-Bharuch-152604(1).pdf ...

    morthadmin - 06/06/2022 - 14:36 - 0 comments

  8. Four laning of Solapur - Yedshi Section of NH-211 from Km. 0.00 to Km. 100.00 (Design length 98.717 km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase IVB - Submission of proposal for permission for laying optical fiber from Km.34/000 to Km.35/200 (1200 meter) on NH-211 (Working OFC which is damaged during the constructions of NH / MH State HW / PWD / ZP) laid under National Optical Fiber Network Project (NOFN)

    Upload Document File:  864-67382-876521-876213-87432(1).pdf ...

    morthadmin - 06/02/2022 - 10:15 - 0 comments

  9. O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 - Permission for laying of 3Cx400sqmm HT UG Cable from Km 17.995 to 18.055 and 250 m from the edge of the service road to EC-2 ramp slip road towards Toll plaza on LHS by HDD method

    Upload Document File:  igewjoiuhfwoijcsafsiuhfwq.pdf ...

    morthadmin - 05/31/2022 - 12:15 - 0 comments

  10. Four/Six Laning of Gujarat/ Maharashtra Border - Surat - Hazira Port Section of NH-53 (old NH-6) (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Reg. Proposal seeking ROW Permission for Crossing of Drainage line for 1400mm Dia MS Pipe Pushing Work on Hazira Dhuliya NH-53 at km 22+170 near Dumas Road-ONGC Bridge Junction Surat in the state of Gujarat

    Upload Document File:  50. IPC_D-1499 dt. 23.05.2022_SMC_1400mm MS Pipe_PIU-Bharuch-147423_00001.pdf ...

    morthadmin - 05/24/2022 - 13:33 - 0 comments

Pages