Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Four/Six Laning of Gujarat/Maharashtra Border-Surat-Hazira Port section of NH-6 (approx. Length 131.500 Km) in the state of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Reg. Proposal for ROW Permission of laying Pipeline near Unn-Gabhani Junction at Gabhani Khadi Bridge- Across NH-53 at Km 33+800 and Km 33+840 in between Km 33+000 and Km 34+000 by Boring & Pushing Method (HDD Method)

    Upload Document File:  49. IPC_D-1498 dt. 23.05.2022_Colourtex_Km 33+800-Km 33+840_PD-Bhar-147446_00001.pdf ...

    morthadmin - 05/24/2022 - 13:32 - 0 comments

  2. 4 laning of Kaithal Rajasthan Border Section of NH-152/65 from Km. 33.250 (Design km. 0.500) to km. 241.580 (Design Km. 165.759) in the State of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer ("DBFOT") Toll basis- Permission for Laying of underground pipeline of 700mm diameter crossing NH-52 at Km. 142.571 near Siwani Town District Bhiwani in the State of Haryana by HDD method

    Upload Document File:  02-283 dated 20.05.2022_00001.pdf ...

    morthadmin - 05/23/2022 - 10:40 - 0 comments

  3. Four Ianing of Tarsod to Fagne section of NH-6 from km 422.700 to km 510.000 in the State of Maharashtra to be executed as Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV (Package-II-B)-Permission of laying and crossing of OFC of M/s Jio Digital Fiber Pet. Ltd. Across National Highway NH-53 for the total length of 6.240 km at Jalgaon city and Nahata Chowk

    Upload Document File:  632 - 20.05.2022.pdf ...

    morthadmin - 05/23/2022 - 10:32 - 0 comments

  4. Six-laning of Chilakaluripet - Nellore section of NH-16 from Km.1182.802 to Km1366.547 (length 183.620) in the state of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern - Permission of laying of OFC across NH-16 at 35 nos of locations

    Upload Document File:  1595(1).pdf ...

    morthadmin - 05/19/2022 - 13:43 - 0 comments

  5. Operation and Maintenance of 4 lane divided Carriageway facility of Tada - Nellore (Km.52.8 to Km.163.6) section of NH-5 constructed on BOT basis in Andhra Pradesh - Permission for laying of Optical Fibre Cable (OFC) of M/s. APSFL across NH-16 at 29 No of locations

    Upload Document File:  1597(1).pdf ...

    morthadmin - 05/19/2022 - 13:28 - 0 comments

  6. Six laning of Vadodara- Bharuch Section from Km 108.700 to Km 192.000 of NH-8 in the state of Gujarat on BOT basis (BOT Package-l). - Proposal for ROW Permission for laying of Utility Services Across at Km 143+600 and Along from Km 140+860 to Km 143+600 on RHS (Total 2.740 Kms) & from Km 143+600 to Km 140+350 on LHS (Total 3.15 Km)(Total Length 5+890 Kms) on NH-48 for connectivity of Piped Natural Gas (PNG) to Por Ramangamdi GIDC, Por Village and Surrounding area.

    Upload Document File:  47. IPC_D-1376 dt. 12.05.2022_Vadodara Gas_Km 143+600_PD-Bharuch-145361_00001.pdf ...

    morthadmin - 05/17/2022 - 10:10 - 0 comments

  7. Four Ianing of Ausa- Chakur section of NH-361 from km 55.835 to km 114.600 (Design length 58.51 km.) under Bharatmala Pariyojana on Hybrid Annuity Mode -Proposal of M/s Telesonic Networks Ltd. for permission for Trenching and laying of OFC Telecom Ducts / Cable (01 Nos) along NH Jurisdiction of NH-361 from km 75.100 to km 78.200 on Right Hand Side for the section of total length 3.100 kms under NHAI PIU Nanded

    Upload Document File:  527 - 13.05.2022.pdf ...

    morthadmin - 05/17/2022 - 09:31 - 0 comments

  8. O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 - Issue of ROW permission for laying 11 KV(3Cx400Sqmm) HT UG Electrical cable on National Highway NH- 44(Bangalore-Hosur section) along the ROW from KM 18.400 to KM 18.610 on LHS by HDD Method and KM 18.610 to KM 20.800 on RHS in Utility Duct and 1 Nos NH Across crossing @ KM 18.610 by HDD Method

    Upload Document File:  20220509170024_00001.pdf ...

    morthadmin - 05/09/2022 - 14:28 - 0 comments

  9. O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 - Permission for laying of 1600 mm MS pipe with 2000mm MS casing pipe crossing the NH-7 road parallelly between KM 14/600 to KM 14/800 by trenchless Method

    Upload Document File:  20220509170015_00001.pdf ...

    morthadmin - 05/09/2022 - 14:27 - 0 comments

  10. Four Laning of Ausa-Chakur Section of NH-361 fram km 55.835 to km 114.600 (Design Length 58.51km) under Bharatmala pariyojna in the State of Maharashtra on Hybrid Annuity Mode-Proposal of M/s Maharashtra Information Technology Corporation Ltd. For permission for installation of Overhead Optical Fibre Cable on existing MSEDCL pole and / or erecting new poles along on NH-361, (1) Rajiv Gandhi Bus Sop of Mahatma Bzsweshwar Chowk Basweshwar Chowk Bus Stop km 73/000 to km 80/280 RHS Length - 2.28km, (2) Sirram Nagar to Aasta mode Bus Stop km 90/600 to km 35/950 RHS length - 5.05 km Total length 7.33 km

    Upload Document File:  402 - 02.05.2022(1).pdf ...

    morthadmin - 05/04/2022 - 10:10 - 0 comments

Pages