Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3861 Gujarat Six Laning from existing Km. 494+410 to existing Km. 509+550 of NH-8 in the state of Gujarat on EPC Mode under NHDP Phase-V (Package- VII). - Proposal for ROW permission for laying 8” Dia Steel Gas Pipeline across NH-48 at Km 541+100 on Mota Chiloda to Nana Chiloda section of NH-48 in the state of Gujarat (1.69 Mb application-pdf)
01-11-2021
3862 Jharkhand (i). ROW permission for 39 Km laying Optical Fiber Cable in km. 320 to Km. 334 & Km. 334 to Km. 336 & Km. 377 to Km. 400 in NH-2. (ii). ROW permission for 2.350 Km laying Optical Fiber Cable from M.S. 356/800 to M.S. 359/150 in NH-2 (121.74 Kb application-pdf)
01-11-2021
3863 Kerala NHAI-RO Kerala-4-laned Walayar-Vadakkancherry (Km.182+250-Km.240+000) section of NH-544 on BOT(Toll basis)-O&M Stage and 6 Laning of Vadakkanchery-Thrissur (Km.240+000-Km.270+000) of NH-544 on BOT(Toll) basis-Under construction-Laying of OFC on 40mm HDPE duct in between Km.235+120 to Km.237+500(LHS) of NH544 for a length of 2.080Km by M/s Telesonic Network Ltd. (Airtel) (859.45 Kb application-pdf)
01-11-2021
3864 Telangana NHAI – RO Hyderabad – PIU Mancherial–Proposal for laying of Optical Fiber Cable from Km.42+000 to Km.68+522 (RHS), from Km.72+000 to Km.84+650 (RHS), Km.87+570 to Km. 90+030 (RHS), from Km.91+240 to Km.92+450 (RHS), From Km.49+975 to Km.55+900 (LHS), from Km.62+960 to Km.62+980 (LHS), from Km.68+050 to Km.68+522 (LHS), Km. 71+700 to Km.72+000 (LHS), from Km.90+040 to Km.91+240 (LHS), along the NH-363 (four laning stretch), from Km.315+358 to Km.31+430, from Km. 315+358 to Km. 317+900 (RHS), from Km.317+900 to Km.319+185 (LHS) on the existing NH-363 by Open trench Methodology and Highway crossings at Km.46+350, Km.47+650, Km.49+965, Km.50+100, Km.54+200, Km.54+800, Km.55+900, Km.58+100, Km.62+950, Km.65+080, Km.67+340, Km.68+000, Km.68+522 (LHS side and RHS side), Km.69+245, Km.72+000, Km.76+300, Km.83+900, Km.84+650, Km..88+500, Km.90+030, Km.90+200, Km.91+240, Km.92+450, Km. 316+370 (existing NH-363), and Km.317+900 (existing NH-363 across the Repallewada to TS/ MH border of NH-363 using HDD method in the State of Telangana (5.84 Mb application-pdf)
01-11-2021
3865 Telangana NHAI – RO Hyderabad–Proposal for laying of Optical Fiber Cable from Km.12+000 to Km.19+410 (RHS), from Km.19+410 to Km.27+533 (LHS), Km.30+025 to Km.31+600 (LHS), from Km.31+660 to Km.42+000 (RHS), along the NH-363 (four laning stretch), from Km.251+900 to Km.252+600 (LHS), Km.252+606 to Km.258+418 (RHS) on the existing NH-363 by Open trench Methodology and Highway crossings at Km.11+600, Km.12+766, Km.14+240, Km.14+250, Km.17+100, Km.17+110, Km.19+410, Km.23+840, Km.30+025, Km.31+600, Km.34+465, Km.36+010, Km.38+035, Km.38+663, Km.39+150, Km.39+195, Km. 252+606 (existing NH-363), and Km.273+951 (existing NH-363) across the Repallewada to TS/ MH border of NH-363 using HDD method in the State of Telangana (4.26 Mb application-pdf)
01-11-2021
3866 West Bengal Permission for laying 30" dia crossing pipeline for 24" dia carrier gas pipeline and 6" dia HDPE Dust for OFC of M/s GAIL (India) Limited across NH-6 (New NH-16) at Km 60.830 at Mouza - Chandrapur, Bagnan-II in the state of West Bengal (886.79 Kb application-pdf)
29-10-2021
3867 Uttar Pradesh Proposal for issuance of NOC for laying of 2 nos. of 150mm dia Heavy Duty GI pipes by HDD method for laying of electrical power cables of 6.6KV for RINL Forged Wheel Plant (FWP) township crossing at Km 70.6 of Raebareli-Banda section of NH-31 (Old NH-232), at Lalganj, District-Raebareli (30m in length) (2.79 Mb application-pdf)
29-10-2021
3868 Kerala NHAI-RO Kerala- Four Lane NH Connectivity of Edappally-Vyttila-Aroor section of NH -66 from Km.342.000 to Km.358.750 in the state of Kerala - Proposal for improving water supply to Cheranellore Panchayath - Supplying and laying 450mm D1-K9 pipe from Thammanam Pump House to Vadathodu Tank site (Km.342+000 to Km.346+900)(Length of 4.9 Km) through Service Roads (941.56 Kb application-pdf)
29-10-2021
3869 Uttar Pradesh Permission for laying of underground Gas Pipeline (8" dia of Steel Pipe) and 125mm dia MDPE Gas Pipeline by HDD/Trenching Method of M/s Indraprastha Gas Limited from Old Ch. 31+700 to Old Ch. 37+200 along Right Hand Side (RHS) of the National Highway. The total section length for ROW applied is 5.5km on along Panipat-Shamli Road, National Highway, New NH-709AD (Old SH-12) in the State of Uttar Pradesh (5.37 Mb application-pdf)
29-10-2021
3870 Uttar Pradesh NOC for laying of Electrical Cable (11KV U/G CLPE Cable) outer dia of HDPE Pipe 300mm with Connectivity on through the Electric Poles (SP 55 Steel Tubular Double pole 1.0m long with Pit (size 600mm dia and 2.0m depth) of Uttar Pradesh Housing & Development Board from km. 118.630 (RHS) to km. 119.300 (RHS) length 670m) and one crossing at km. 119.300 (length 30m) (total length 700m) on NH-534 (Najibabad to Kotdwar Road) in the State of Uttar Pradesh (4.60 Mb application-pdf)
28-10-2021

Pages