Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3871 Gujarat Permission for accommodation of 15 mm dia MDPE gas pipeline to set up piped Natural Gas Distribution network along NH-56 from km 676/230 to 667/130 in Dharmpur & District Valsad in the state of Gujarat (2.16 Mb application-pdf)
27-10-2021
3872 Jharkhand Proposal for access permission of DWSD water pipe line laying from Kandarbera Chowk to Kalimandir (Pardih) Chowk (168.26 Kb application-pdf)
27-10-2021
3873 Gujarat Permission for accommodation of OFC along and across NH-64 (old NH-228) from km 174/00 to 230/000 in the state of Gujarat (2.16 Mb application-pdf)
27-10-2021
3874 Gujarat Permission for accommodation of HDPE/PLB (40 mm ) OFC along/across NH- 953 from km 35/357 to km 102/660 in the state of Gujarat (2.31 Mb application-pdf)
27-10-2021
3875 Gujarat Permission for accommodation of 140 mm dia MS pipeline across NH-147 (old NH-8C) by HDD/push through method at chainage 16/740 (near Thaker farm, beside Swagat Holiday mall) in the state of Gujarat (2.27 Mb application-pdf)
27-10-2021
3876 Telangana NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable from Km.415+836 to Km.415+324 (LHS) along NH-44 by Open trench Methodology and Highway crossings at Km.418+600 and Km.415/836 by HDD Methodology on Nagpur to Hyderabad section of NH-44 in the State of Telangana (2.11 Mb application-pdf)
26-10-2021
3877 Telangana NHAI - RO Hyderabad - PIU Nirmal Proposal for laying of Optical Fiber Cable from Km.441+370 to Km.439+980 (LHS), from Km.439+980 to Km.436+350 (RHS), along NH-44 by Open trench Methodology and Highway crossings at Km.436+350, Km. 428+200, and Km.426+830 by HDD method on Nagpur to Hyderabad section of NH-44 in the State of Telangana (2.23 Mb application-pdf)
26-10-2021
3878 Telangana NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable from Km.436+350 to Km,.434+120 (RHS), from Km.434+080 to Km.432+980 (RHS), from Km.428+250 to Km.428+200 (LHS), from Km,428/200 to Km.428+115 (RHS), From Km.426/880 to KmKm.426+830 (RHS), from Km.425+630 to Km.424+210 (LHS), Km.424+210 to Km.419+510 (LHS) along NH-44 by Open trench Methodology and Highway crossings at Km.436+350, Km. 428+200, and Km.426+830 by HDD method on Nagpur to Hyderabad section of NH-44 in the State of Telangana (9.59 Mb application-pdf)
26-10-2021
3879 West Bengal Proposal of WBSEDCL Paschim Medinipur RE Project for obtaining permission for laying of 2(Two) nos 11 KV underground cable crossing throuogh 2X160mm dia HDPE pipe using HDD Method in between Km 181.950 in between Chichira - Feko and at Km 179.7 in between Natura- Feko section on NH-6 (896.35 Kb application-pdf)
26-10-2021
3880 Uttar Pradesh Permission for laying of underground Gas Pipeline of M/s Indraprastha Gas Limited from Old Ch. 118+345 to Old Ch. 119+945 (Pro Ch. 87+500) to (Pro Ch. 89+100) along Right Hand Side (RHS) and crossing at Old Ch. 118+845 (Pro Ch. 88+000) & Old Ch. 119+935 (Pro Ch. 89+035) of the National Highway. The total section length for ROW applied is 1660.96m (1600m + 30.48m + 30.48m) on along Delhi-Saharanpur Road, National Highway, New NH-709B (Old SH-57) in the State of Uttar Pradesh (1.32 Mb application-pdf)
26-10-2021

Pages