Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
क्रमांक State Subject Issue Date
11 Rajasthan Permission for Laying of 11Kv Electrical Cable Crossing (Solar Power plant to GSS under KUSUM Scheme) by HDD method boring dia 250mm (OD) casing on Barmer to Gandhav Bridge Section of NH-68 at Km 193+925 (ROW 45m) at Village-Bachhdau, Tehsil–Chouhtan, Distrcit-Barmer in the State of Rajasthan by M/S Sheru Devi Associates (88.80 Kb application-pdf)
04-11-2025
12 Rajasthan Permission for Laying of 11Kv Electrical Cable Crossing (Solar Power plant to GSS under KUSUM Scheme) by HDD method boring dia 250mm (OD) casing on Barmer to Gandhav Bridge Section of NH-68 at Km 184+000 (ROW 45m) at Village-Sanavara, Tehsil–Barmer, District-Barmer in the State of Rajasthan by M/S Sanawara Solar Power Project (96.87 Kb application-pdf)
04-11-2025
13 Madhya Pradesh Submission of proposal for permission of 2no. 1.20m pipeline dia crossing at 255.578 & at Km.255.670 under Execution of Kabulpur (Kamardipur) medium irrigation Project on Turnkey basis across NH-52 (Shajapur-Sarangpur section) at Village-Panwadi (trench less method) (2.70 Mb application-pdf)
04-11-2025
14 Gujarat Permission for Parallel Laying and crossing of 66 KV, 630 Sq.mm. (3+1) XLPE power cable line-for Proposed 66 KV Single Circuit line from Existing 220 KV Kukma Substation to proposed 66 KV of Executive Engineer, Salinity Control Division Bhuj, Narmada Water Resources, Water Supply & Kalpsar Department) for unit main pumping station (MPS-2) unit located at Survey no. 193 P, Village: Ratatalav, parallel laying on RHS between Km 29+415 to Km 33+660 and crossing at Km 32+920 & Km 33+660 of NH-341 at Village-Anjar, Taluka-Anjar, District-Kutch (138.14 Kb application-pdf)
04-11-2025
15 Kerala Laying of 100m Power cable through 110mm HDPE duct by M/s EVM Automobiles Pvt. Ltd. through HDD from Km.350+400 to Km.350+500(LHS) (532.28 Kb application-pdf)
03-11-2025
16 Kerala Laying underground cable through HDD method from Karicode Junction (Ch.6+100) to the pole marked as KK 105 near Supreme shopping center, Karicode (Ch.6+450) as part of RDSS scheme part-2 (532.33 Kb application-pdf)
03-11-2025
17 Haryana Creation of 220kV D/C line from 400kV S/Stn. PGCIL Naggal Panchkula to proposed 220kV S/StnSadhaura with 0.5 Sq” Moose Conductor against P.O. HDP-48/PD&C/Xen Projects (TL) dt. 25.01.2023 – Overhead crossing of 220 KV HVPNL transmission lines at km.158+713 & km. 158+868 (TL No. 1-2 and TL No. 3-4) (836.58 Kb application-pdf)
03-11-2025
18 Punjab Regarding NOC for overhead crossing of 400kV PGCIL transmission line on NH-52 at km. 223 to 224 near Village Duttal, Tehsil Patran District Patiala (848.86 Kb application-pdf)
03-11-2025
19 Haryana NOC proposal for crossing of electrical line (33kv XLPE cable 4core X 400 sq. mm 2 nos through HDPE pipe 200mm 2nos. connectivity with lattice tower) of Dakshin Haryana Bijli Vitran Nigam (DHBVN) at crossing km. 322.943 (Total length 60m) on NH-352 in village Shadipur, District-Jind) in the State of Haryana (479.08 Kb application-pdf)
03-11-2025
20 Haryana NOC for crossing NH-09, at km. 58-59, Village-Ismaila, Tehsil-Sampla District-Rohtak in the State of Haryana (447.75 Kb application-pdf)
03-11-2025

Pages