Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
क्रमांक State Subject Issue Date
71 Tamil Nadu Requesting for laying of water pipe line along the road from Km 200/800 to Km 201/950 (LHS) & across the road @ Km 201/950 (60 m) by HDD method in Trichy-Karur section of N-67 (New NH-81) by Executive Officer, Uppidamangalam Town Panchayat, Karur (6.64 Mb application-pdf)
03-07-2025
72 Maharashtra Proposal for grant of permission for laying power transmission cable existing utility duct at km 417.900 across Dhule-Solapur Highway-52 requested by M/s MSKVY (1.77 Mb application-pdf)
03-07-2025
73 Punjab NOC permission for laying of 6" Dia Steel Natural Gas Pipe Line along the NH-754 from Haryali CNG Pump to Bawa Ram Singh Chowk from Km 41.402 to 42.877 (RHS) (total Length=1475.00m) at Sri Muktsar Sahib on Bathinda-Sri Muktsar Sahib Road, Tehsil & District-Sri Muktsar Sahib in the State of Punjab-Gujrat Gas Limited (GGL) (4.32 Mb application-pdf)
03-07-2025
74 Punjab NOC permission for laying of proposed Water Supply Pipe Line part-1 from Km.76.150 to 76.520 (LHS), Length = 370.00m, along the NH-703A, at makhu, on Makhu-Ferozepur Road Distt Ferozepur. Part-2 from Km.75.672 to 76.094(RHS), Length = 422.00m, along the NH-703A, at makhu, on Jalandhar-makhu Road, part 3 from Km.33.285 to 33.611(RHS), Length = 326.00m along the NH-703B, at Makhu, on Moga-Makhu road, District-Ferozepur in the State of Punjab (3.81 Mb application-pdf)
03-07-2025
75 Gujarat Permission for pipeline crossing at Chainage Km 353+500 of 250 mm 2 PVC pipe with 500 mm & MS casing pipe on NH-41, Samakhiyali-Gandhidham road, District-Kutch (437.39 Kb application-pdf)
03-07-2025
76 Punjab NOC permission for laying of 6" (150mm) Dia Steel Natural Gas Pipe Line, Part-1 along the NH-05 from Sher Shah Wali Chowk to Chungi No.7, from Km 11.245 to 12.805 (LHS) = 1560.00m & Crossing at Km 11.245 (LHS to RHS), Length = 60.00m, on Ferozepur - Ludhiana Road, Part-2 along the NH-354, from Sher Shah Wali Chowk to Gandhi Garden, from Km 223.140 to 224.278 (LHS), Length = 1138.00m, on Ferozepur - Sri Muktsar Sahib road, (Total Length = 1560+60+1138=2758.00m) at Ferozepur, Tehsil & District-Ferozepur in the State of Punjab-Gujrat Gas Limited (GGL) (3.83 Mb application-pdf)
03-07-2025
77 Uttar Pradesh Proposal for permission of underground road crossing of water supply pipe line at Km. 85+665 on Ghaziabad – Aligarh Section of NH-34 in District-Bulandshahar in the State of Uttar Pradesh (122.72 Kb application-pdf)
03-07-2025
78 Uttar Pradesh Proposal for permission of laying overhead electric line from Km. 52.820 to Km. 54.120 (RHS) on NH-34 (Ghaziabad– Aligarh Section) to Government Hospital, Sikandrabad in District-Bulandshahar in the State of Uttar Pradesh (79.09 Kb application-pdf)
03-07-2025
79 Madhya Pradesh Permission to crossing 765 KV line (Mandsuar-Indore double circuit high voltage transmission line) crossing of Dehli-Mumbai Expressway (NE-4) at Ch. 548+300 Village-Bardawadi, Tehsil-Sitamau, District-Mandsaur (PKG-20) (6.41 Mb application-pdf)
02-07-2025
80 West Bengal Proposal for laying of Underground 2 nos. Pipeline of Hindustan Petroleum Corporation Limited along NH-19 (Old NH-2) from Km 508+081 to Km 508+758 (RHS) in Rajbandh, Durgapur, District-Paschim Bardhaman in the State of West Bengal (495.73 Kb application-pdf)
02-07-2025

Pages