601 |
Model EPC Document for Construction of Two-lane (with or without PS) NHs Works - Amendment-II (83.88 Kb ) |
15-01-2014 |
602 |
Model EPC Document for Construction of Two-lane (with or without PS) National Highway Works - Amendment-I (132.37 Kb ) |
15-01-2014 |
603 |
Invitation of bids issue of RFP for the works to be implemented on EPC mode of contract (45.16 Kb ) |
31-12-2013 |
604 |
Invitation of bids, issue of RFP for the works to be implemented on Engineering Procurement and Construction (EPC} mode of contract (28.85 Kb ) |
30-12-2013 |
605 |
Maintenance of drinking water and toilet facilities at fuel stations along National Highways (45.68 Kb ) |
26-12-2013 |
606 |
Circular, Notification for reverting land, which is no longer required for development of National Highways, back to States (32.32 Kb ) |
13-12-2013 |
607 |
Guidelines regarding procedures to be adopted for invitation of tenders and qualification of Contractors - Modifications in the procedures (108.16 Kb ) |
14-11-2013 |
608 |
Movement of Over Weight and Over Dimensional Consignment (OW,ODC) on NHs- completion of condition survey on NHs (610.27 Kb ) |
30-09-2013 |
609 |
Online permission for single unit ODC,OWC consignment on Modular Hydraulic Trailers (HT-1 to HT-13) (72.37 Kb ) |
20-09-2013 |
610 |
Movement of Over Weight and Over Dimensional Consignments (OWCs,ODCs) on NHs on Hydraulic Trailer type HT-1 to HT-3 (72.37 Kb ) |
20-09-2013 |
611 |
Standard RFP document for selection of Authority_s Engineer for works to be implemented on EPC mode (60.96 Kb ) |
16-09-2013 |
612 |
Centages for NH works to be implemented on EPC Mode through State PWDs and BRO (78.10 Kb ) |
14-08-2013 |
613 |
Authentication of draft fee notification by Chief Engineers of the Ministry (687.07 Kb ) |
12-08-2013 |
614 |
GUIDELINES FOR GRANTING RIGHT OF WAY PERMISSIONS TO TELECOM SERVICE LICENSEES , INFRASTRUCTURE PROVIDERS FOR LA YING OF TELECOM CABLES, DUCTS ON NH LAND (559.61 Kb ) |
06-08-2013 |
615 |
Model EPC Document for Construction of Two-lane National Highways Works – regarding clarifications for award and implementation of works on EPC mode of contract (68.73 Kb ) |
01-08-2013 |
616 |
Procedure for possession, transfer of State Govt. land for the development of NHs (669.00 Kb ) |
23-07-2013 |
617 |
Timelines for completion of EPC Projects (1.11 Mb ) |
16-07-2013 |
618 |
LAYING OF WATER PIPE LINE-CLARIFICATION (632.46 Kb ) |
13-07-2013 |
619 |
Financial Powers of Ministries Departments with regard to revised guidelines for appraisal approval of public funded non PPP Plan Scheme projects-08.07.2013 (44.45 Kb ) |
08-07-2013 |
620 |
Requirement of Technical Manpower for Authority_s Engineer as per EPC Document for different works on National Highways and centrally sponsored works- MINUTES OF MEETING (97.15 Kb ) |
01-07-2013 |
621 |
Requirement of Technical Manpower for Authority_s Engineer as per EPC Document for different works on National Highways and centrally sponsored works (97.15 Kb ) |
01-07-2013 |
622 |
MoM-Finalization of the timelines for completion of various civil construction works on National Highways to be undertaken on EPC mode (67.22 Kb ) |
01-07-2013 |
623 |
Check list for preparing proposals for User Fee Notifications (157.98 Kb ) |
13-06-2013 |
624 |
Check list for preparing proposals for User Fee notification (280.49 Kb ) |
13-06-2013 |
625 |
Clarification reg. Revision of fee in BOT-OMT-PF-lettr to NHAI (443.88 Kb ) |
10-06-2013 |
626 |
Use of emerging new material and techniques in construction of National Highways (1.46 Mb ) |
07-06-2013 |
627 |
Guidelines for ensuring provisions for the Highway Projects being undertaken on OMT basis for issuing fee notification (82.20 Kb ) |
07-06-2013 |
628 |
Court Order (193.73 Kb ) |
24-05-2013 |
629 |
Project Monitoring (78.08 Kb ) |
22-05-2013 |
630 |
Submission of Revised Cost Estimates to IFD-21.05.2013 (66.90 Kb ) |
21-05-2013 |
631 |
Guidelines for calculation Capital Cost for the Highway Projects being undertaken on OMT (125.06 Kb ) |
25-04-2013 |
632 |
Guidelines for formulation Appraisal and Approval of Government Plan funded Projects Schemes related to Ministry of Road Transport and Highway-17.04.2013 (83.51 Kb ) |
17-04-2013 |
633 |
Guidelines,Norms for access Permission to Fuel Stations, Private Properties, Rest Area Complexes and Such other Facilities along National Highways-Corrigendum (4.98 Mb ) |
12-04-2013 |
634 |
Forwarding of soft copy and hard copy of the proposals for user fee notifications to be sent to the press for publication (354.07 Kb ) |
04-04-2013 |
635 |
Standard RFP Document for selection of Authoritys Engineer (AE) for works to be implemented on EPC mode (608.69 Kb ) |
01-04-2013 |
636 |
Updating of the construction cost considered in the B.K. Chaturvedi Report-27.02.2013 (887.11 Kb ) |
27-02-2013 |
637 |
Delegation of powers of the Ministry to ROs-08.02.2013 (3.30 Mb ) |
08-02-2013 |
638 |
Delegation of powers of the Ministry to Regional Officers-08.02.2013 (140.70 Kb ) |
08-02-2013 |
639 |
Delegation of power to ROs Contingency with example-08.02.2013 (1.21 Mb ) |
08-02-2013 |
640 |
Tentative guidelines for granting permission for transporting industrial products raw material across the National Highway (815.84 Kb ) |
04-02-2013 |
641 |
Guidelines for calculating Capital Cost for the Road Projects-24.01.2013 (99.59 Kb ) |
24-01-2013 |
642 |
Guidelines for Calculating Capital Cost -OM (1.12 Mb ) |
24-01-2013 |
643 |
Movement of Over Weight and Over Dimensional Consignment (OW -ODC)-Guidelines (1.16 Mb ) |
24-01-2013 |
644 |
Guidelines for capital cost of road projects-24.01.2013 (116.04 Kb ) |
24-01-2013 |
645 |
Movement of Over Weight and Over Dimensional Consignment (OW,ODC) Guidelines (3.35 Mb ) |
24-01-2013 |
646 |
Project Contingencies Quality Control WC Establishment and Agency Charges admissible expenditure-Addendum-08.01.2013 (588.53 Kb ) |
08-01-2013 |
647 |
Mechanised Patching (80.09 Kb ) |
04-01-2013 |
648 |
FDR- SANCTION -NEW GUIDE LINE (106.53 Kb ) |
03-01-2013 |
649 |
Streamlining the procedure for sanction of work under Flood Damage Repairs (FDR) (83.25 Kb ) |
03-01-2013 |
650 |
Use of RECYCLING TECHNOLOGY FOR PR WORKS (99.55 Kb ) |
18-12-2012 |
651 |
Use of Recycling technology for PR (Periodic Renewal) works on National Highways (66.37 Kb ) |
18-12-2012 |
652 |
Use of Recycling technology for PR (Periodic Renewal) works on NHs (9.54 Mb ) |
18-12-2012 |
653 |
Constitution of committee for finalising costing methodology for NH project-17.12.2012 (194.85 Kb ) |
17-12-2012 |
654 |
Proposals to be considered by EFC PIB PPP AC or other appraisal body-14.12.2012 (52.43 Kb ) |
14-12-2012 |
655 |
Simplification of Procedure in order to make the Award Process of Road Projects faster-13.12.2012 (324.90 Kb ) |
13-12-2012 |
656 |
Proposals to be considered by EFC PIB PPPAC or other appraisal body-13.12.2012 (45.28 Kb ) |
13-12-2012 |
657 |
e-PROCUREMENT (1.21 Mb ) |
12-12-2012 |
658 |
Tentative Guidelines for providing RESEARCH _ TEST STRETCH ALONG NH 12-12-2012 (219.09 Kb ) |
12-12-2012 |
659 |
SUBMISSION OF ORIGINAL BG FOR BID SECURITY (105.93 Kb ) |
12-12-2012 |
660 |
Tentative Guidelines for providing Research _ Test (ResT) reaches along National Highways (169.88 Kb ) |
12-12-2012 |
661 |
Experimental Crash Barriers - Crash Cushions for Road Safety (1.18 Mb ) |
12-12-2012 |
662 |
Model EPC document for construction of 2L NHs (757.82 Kb ) |
26-11-2012 |
663 |
Grade separated roads along existing alignments as an option for bypassing built up areas on National Highways (70.22 Kb ) |
31-10-2012 |
664 |
GRADE SEPERATED ROADS ALONG EXICTING ALIGNMENT (729.77 Kb ) |
31-10-2012 |
665 |
Capacity building and lane width of NHs_2L PS (64.76 Kb ) |
05-10-2012 |
666 |
Capacity building and lane width of National Highways_2L with PS (599.54 Kb ) |
05-10-2012 |
667 |
Capacity building and lane width of National Highways (370.88 Kb ) |
05-10-2012 |
668 |
ADVANCE ACTION FOR INITIATION OF TENDER (950.38 Kb ) |
19-09-2012 |
669 |
Model EPC document (924.64 Kb ) |
17-08-2012 |
670 |
Accomodaton of underground utility services along NHs (357.59 Kb ) |
26-07-2012 |
671 |
UNDER GROUND UTILITIES SERVICE (2.33 Mb ) |
26-07-2012 |
672 |
Vetting of sanction letter by CE-18.07.2012 (96.78 Kb ) |
18-07-2012 |
673 |
B-BEARING MANUFRACTURER empanelment (2.29 Mb ) |
21-06-2012 |
674 |
RETAIL OUTLET-MINUTES OF MEETING (992.58 Kb ) |
14-05-2012 |
675 |
Tentative Guidelines for Transverse Bar Markings at accident prone spots on National Highways (148.60 Kb ) |
04-05-2012 |
676 |
Guidelines, Norms for Access Permission to Fuel Stations, Private Properties, Rest Area Complexes and Such Other Facilities Along National Highways (4.98 Mb ) |
13-04-2012 |
677 |
DLP IS ONE YEAR FOR PR WORKS (696.04 Kb ) |
12-04-2012 |
678 |
Norms for the access for Fuel Stations, Service Stations and Rest Areas along the National Highways - Clarification regarding Licensee Fee (578.38 Kb ) |
08-04-2012 |
679 |
Norms for the Access for Fuel Stations, Service Stations and Rest Area along the NH - Clarification regarding licensee fee (68.51 Kb ) |
08-04-2012 |
680 |
e-PROCUREMENT (8.14 Mb ) |
30-03-2012 |
681 |
USE OF MODIFIED BITUMENT (357.46 Kb ) |
30-01-2012 |
682 |
Normative cost of toll plazas agreed by standing cost committee (651.76 Kb ) |
17-01-2012 |
683 |
Inauguration Bhoomi Pujan Foundation stone laying any other ceremony in respect NH works (931.12 Kb ) |
16-12-2011 |
684 |
Inauguration (1.30 Mb ) |
16-12-2011 |
685 |
Use of HOT MIX PLANT (7.52 Mb ) |
21-10-2011 |
686 |
Use of Hot Mix Plant on Bituminous Construction Works on NHs (637.05 Kb ) |
21-10-2011 |
687 |
For publication of Fee Notifications (1.01 Mb ) |
24-08-2011 |
688 |
Fee notification approved format (7.73 Mb ) |
24-08-2011 |
689 |
Laying of water pipeline along and across of NHs (683.08 Kb ) |
13-07-2011 |
690 |
PRE-CONSTRUCTION ACTIVIVITIES BEFORE SANCTION (390.79 Kb ) |
29-06-2011 |
691 |
Guidelines for submitting the tender documents-NHO-SIGN EACH PAGE BY AUTHORIZED SIGNATORY (392.87 Kb ) |
13-06-2011 |
692 |
NOC FOR ROW Ministry,s letter dated 6-06-2011 (280.23 Kb ) |
06-06-2011 |
693 |
USE OF SBD Withdrawal Letter-26.05.2011 (394.73 Kb ) |
26-05-2011 |
694 |
B-Supplier of Expansion joint (5.04 Mb ) |
12-05-2011 |
695 |
Documentation of NH(O) sanction (692.77 Kb ) |
25-04-2011 |
696 |
Mobilization advance 10 interest-01.04.2011 (632.49 Kb ) |
01-04-2011 |
697 |
Tender Evaluation Guideline dated 15-03-2011 (530.93 Kb ) |
11-03-2011 |
698 |
Development of stretches under IRQP following Corridor Development approach (619.42 Kb ) |
03-01-2011 |
699 |
Use of 40-60 Hot Mix Plant in PR Works in Assam (210.33 Kb ) |
21-12-2010 |
700 |
Toll fee waiver_2010 GSR 950(E) dt 03.12.10 (175.19 Kb ) |
03-12-2010 |