Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal for permission for laying underground 11KV three (3 No.) power cable line along the NH-64 (Ankleshwar-Hansot-Oplad Section), RHS, between Km. 257.949 to km 258.175 Near GETCO sub-station Hansot village from KPIGEL solar pooling substation Tal-Hansot, District-Bharuch in the State of Gujarat

    Upload Document File:  5-Inv-cmt-pub-230625-Untitled_06232025_122825.pdf ...

    morthadmin - 06/23/2025 - 15:12 - 0 comments

  2. Proposal for grant of permission for laying 6 "dia CS, 4 "dia Cs, 125mm Dia (MDPE) & 90mm Dia (MDPE) Gas pipeline along and across at NH-37 Ch. 0.000 (Sadarhat) to Ch. Km 6.250 (ISBT) (Length 6250m) and Crossing at 0.710 Km) Length : 14m0, 3.200km (Length 17m) & 3.920 Km (Length 17m) of NH-37 Village/Mouza: Silchar Town, Pargona: Barakpar to Village/Mouza: Tarapur Pt-IV, Pargona: Barakpar Circle: Silchar Sadar in Cachar District in the State of Assam

    Upload Document File:  4-Inv-comment-pub-230625-17815..pdf ...

    morthadmin - 06/23/2025 - 15:08 - 0 comments

  3. Proposal for grant of permission for laying 6 "dia CS, 4 "dia Cs, 125mm Dia (MDPE) & 90mm Dia (MDPE) Gas pipeline along and across at NH-37 Ch. 0.000 (Sadarhat) to Ch. Km 6.250 (ISBT) (Length 6250m) and Crossing at 0.710 Km) Length : 14m0, 3.200km (Length 17m) & 3.920 Km (Length 17m) of NH-37 Village/Mouza: Silchar Town, Pargona: Barakpar to Village/Mouza: Tarapur Pt-IV, Pargona: Barakpar Circle: Silchar Sadar in Cachar District in the State of Assam

    Upload Document File:  2-Inv-comment-230625-17815.pdf ...

    morthadmin - 06/23/2025 - 15:03 - 0 comments

  4. Proposal for permission for laying of underground water supply pipe line under Jal Jeevan Mission along from Km. 262+000 to Km. 262+300 (LHS) 300 m & from Km. 262+000 to Km. 262+100 (RHS) 100 m & Km. 263+580 to 263+700 (LHS) 120 m Km. 278+460, Km. 283+800 in Village HARDEVPUR URF ANDHARPUR, KESHARPUR MEGI NAGLA, GOUSGANJ SARAI, NAWADIA ASHOK, BAKARGANJ, NIKASUA, HARAILA, SIMRA HARCHAND SINGH in Block & Tehsil-Faridpur in District Bareilly at NH-30 in the State of Uttar Pradesh

    Upload Document File:  0430-1.pdf ...

    morthadmin - 06/23/2025 - 11:46 - 0 comments

  5. Proposal for permission of underground water supply pipe line from Km. 91+900 to Km. 92+745 (845m) LHS, Km. 106+590 to Km. 108+047 (1457m) RHS, Km. 106+850 to Km. 107+900 (1050m) LHS & Crossing by HDD Method at Km. 92+745, Km. 107+900 on Ghaziabad–Aligarh Section of NH-34 in District-Bulandshahar in the State of Uttar Pradesh

    Upload Document File:  3-Inv-comment-20062025-D24605.pdf ...

    morthadmin - 06/20/2025 - 11:55 - 0 comments

  6. Proposal for permission of erection/ laying 11KV electric line from Km. 137+800 to Km. 137+850 LHS including 01 no. underground road Crossing at Km. 137+850, Village Allhadadpur Neevri on NH-34 (Ghaziabad–Aligarh Section) of NH-34 in District-Aligarh in the State of Uttar Pradesh

    Upload Document File:  2-Inv-cmt-20062025-D24603.pdf ...

    morthadmin - 06/20/2025 - 11:50 - 0 comments

  7. Proposal for grant of permission for laying of HDPE pipe for crossing of 11kv Electric line (185mm dia pipe) at Km. 135+965 on Jaipur Mahua Section of NH-21 at Gurjar Simla (33/11kv) GSS Gurjar Simla Balaji Mode Dausa, Rajasthan

    Upload Document File:  1-Inv-cmt-Letter no. 906 dated 19.06.2025.pdf ...

    morthadmin - 06/20/2025 - 10:08 - 0 comments

  8. Request for 8rant of permission for laying/ crossing of 12" steel pipeline on NH-34 from Km 58.250 to Km 62.250 (RHS) in District-Kanpur & from Km 67.100 to Km 91.250 (RHS) in District-Hamirpur & Crossing at Km 58,250 (Crossing length-40.50m) through HDD/Open- cut Method. Total length 28.1905 Km in District-Kanpur & Hamirpur, Uttar Pradesh

    Upload Document File:  6-Inv-comment-pub-19062025-1121.pdf ...

    morthadmin - 06/19/2025 - 14:52 - 0 comments

  9. Request for grant of right of way permission to lay carbon steel pipeline along NH-19 from Km. 552.000 to Km. 559.400 (LHS) (dia. 200 mm) length 7.40 Km & crossing of carbon steel pipeline at Km. 550.980 (dia.100 mm), Length 60 m in District-Fatehpur, Uttar Pradesh

    Upload Document File:  5-Inv-comment-public-19062025-1120.pdf ...

    morthadmin - 06/19/2025 - 14:47 - 0 comments

  10. Request for grant of permission to lay 12" steel pipeline on NH-34 from milestone Km 120.250 to milestone Km 127.600 and Crossing ay Km 127.600 (Crossing Length 36.60 mtrs) on NH-34 in District-Mahoba, through HDD/ open cut method. Total length is 7.3866 km. in District-Mahoba, Uttar Pradesh

    Upload Document File:  4-Inv-comment-19062025-1122.pdf ...

    morthadmin - 06/19/2025 - 14:45 - 0 comments

Pages