  • Request for Provisional Permission for Laying of HT overhead Electrical Cable (Industriat Utility) llKV -3x100 Sqmm on Poles within available ROW along NH-09 from Ch. 53+272 to Ch. 54+751(LHS) (Cable Length 1479.00 Rmt) for M/s KBGB Agritech Private Limited Bulandshahr Road District-Hapur, in the State of Uttar Pradesh
  • Proposal for the permission of underground crossing through HDD of 33KV line at NH-27 Baran Shivpuri section, Ch. 1282+330 at Village-Padora, Tehsil-Kolaras, District-Shivpuri in the State of Madhya Pradesh
  • Permission for laying of Water pipeline along the road from Km 7/000 to Km 7/800(RHS) and across at Km 3/500, Km 7/800 & Km 13/800 in of Madurai – Kayathar section from Km 0/000 to Km 116/500 of NH-44 (Old No.7) on TOT mode in the State of Tamil Nadu
  • Proposal for erection of 22KV electrical lines with 57 Nos. of poles along the road in Km 11/396 to Km 13/615(RHS) of NH-36(Thanjavur-Pudukkottai section) by M/s Delta Foods, Thanjavur
  • Proposal for laying water supply pipe line along and across the road on National Highway NH-53 at Kohmara, Tal. Sadak Arjuni, District-Gondia
  • Proposal for Laying of Underground 33 KV Electrical Cable from Km. 34.400 to Km. 36.100 (Length-1.7Km) on RHS, Overhead Electrical Cable from Km. 36.100 to Km. 38.500 (Length-2.5Km) on RHS along NH-160 (Total Length-4.2Km) & 01 no. of Crossing at Km. 34.400 across NH-160
  • Submission of overhead crossing proposals in the under construction 765 kV D/c transmission line RIV4BPTL with NH-458 near Village-Idwa between Chainage 99 & 100
  • Proposal for permission for laying of underground water supply pipe line (DI Pipe) by HDD method along/across NH-74 (New NH-30), Sitarganj- Bareilly Road, from Ch. 286+730 to Ch. 287+100, RHS (length-370m) and One crossing at Ch. 286+730 (length-28m) & other crossing at Ch. 286+842 (length-28m), Total length -426.00m at Nagar Panchayat-Jahanabad, Tehsil & District-Pilibhit in the State of Uttar Pradesh
  • Permission for crossing of Jetpur Somnath National Highway-151 under the Ozat-II Improvement Group Water Supply Scheme of Junagadh District at Ch. 49+650 & Ch. 50+550
  • Permission for laying underground drinking water pipeline in Muribahal Block under mega water supply project by RWses Division, Bolangtr along NH-59 from km 21/800 to 38/287 (RHS) & km 38/637 to 43/460 (LHS) and across at 15 locations in Bolangir District
  • NOC for Laying of water supply pipe line (900mm MS Casing Pipe & 700 mm MS Carrier Pipe) of "Public Health Engineering Department” Crossing at Km. 146.950(LHS to RHS) (Length 70.0m) on NH-152D (Gangheri to Narnaul Road) in the State of Haryana
  • Permission for laying proposed 300 mm dia carrier & 600 mm dia casing water pipeline across the NH-12 near Sekhdighi More & Ch 237.97 in Murshidabad District in the State of West Bengal
  • Permission for laying of 90 mm dia to 200 mm dia water carrying pipeline from Chainage 345+400 to 347+600 along bothe the sides of NH-12 by Open Trenching and re-filling method under ADINA Zone-I & II Water Supply Scheme at Gazole Block under PHED Dte, Malda Division in the State of West Bengal
  • Permission for laying of 90 mm dia to 225 mm dia Water Carrying pipe from Chainage 367.700 to 375.300 along Right Hand Side of NH-12 by Open Trenching and Re-Filling method under Basratpur piped water supply scheme at Itahar Block under Raiganj Division, PHE Dte under Jal Jeevan Mission in the State of West Bengal
  • Permission for laying of 90 mm dia to 110 mm dia Water Carrying Pipe from Chainage 386.900 to 388.300 along Left Hand Side of NH-12 by Open Trenching and Re-Filling method under Chandigram Piped Water Supply Scheme at Itahar Block under Raiganj Division, PHE Dte under Jal Jeevan Mission in the State of West Bengal
  • Permission for laying of 90 mm dia to 140 mm dia water carrying pipeline from Chainage 378.50 to 383.50 along right hand side of NH-12 by Open Trenching and Re-Filling method under Itahar Zone-II piped Water Supply Scheme at Block under Raiganj Division, PHE Dte under Jal Jeevan Mission in the State of West Bengal
  • Permission for laying proposed 200 mm dia water pipeline Across the NH-12 near Shaikhdighi More (JL 06) to Anuppur (JL 05) Ch 236.00 to 238.600 (LHS) & Ch 235.756 to 238.272 (RHS) in Murshidabad District in the State of West Bengal
  • Permission for laying of 90 mm dia to 200 mm dia Water Carrying Pipe from Chainage 372.500 to 377.700 along Left Hand Side of NH-12 by Open Trenching and Re-Filling method under Kapasia Piped Water Supply Scheme at Itahar Block under Raiganj Division, PHE Dte under Jal Jeevan Mission in the State of West Bengal
  • Proposal for permission for laying underground water supply pipe line from Ch. 465.292 to Ch. 463.057 RHS (Length= 1722m) and crossing by HDD method at Ch. 464.244, from Ch.463.143 to Ch. 462.102 RHS (Length= 1041m) from Ch. 416.452 to Ch. 414.583 LHS (Length=1870m) and crossing by HDD method at Ch. 416.652 and Ch. 414.146 on NH-30 (Old NH-24 Lucknow-Sitapur Road) at District-Sitapur in the State of Uttar Pradesh
  • Permission for laying of water pipeline along & across NH-19 (Old NH-2) from km 506+550 to Km 506+900 in the State of West Bengal
  • Proposal for Crossing of Water Supply Pipeline under Jal Jeevan Mission at Pathare Khurd between Km. 35.800 to Km. 36.200 across NH-160
  • Proposal for permission for 6” DIA underground Electric Cable line by HDD method along NH-24 (New NH-30) Bareilly-Shajahanpur Road (LHS Side) at Ch. 262+000 Rajupraspur to Ch. 273+100 Rambakshpur, Total length 11.1km. (District-Bareilly) in the State of Uttar Pradesh
  • Permission for Parallel laying of GGL 6” dia. steel gas pipeline from Chainage 183+243 to 183+315 Km, RHS on NH-27, Bamanbore-Garamore Road near Gokul Snacks Village-Bhalgam, Taluka-Morbi, District-Morbi in the State of Gujarat
  • Proposal for the permission of laying U/G 11Kv, 3x1855gmm XLPE cable through HDD method along/across Deva Road Ayodhya Road Section, Lucknow Outer Ring Road at CH.91.672, Two Crossing at CH.91.672, LHS (Length =30.00m) & CH.91.672 RHS (Length =30.00m), Total Length = 60.00M and Two DLP Pole at village- Anora Kala, Tehsil- Lucknow Sadar, District-Lucknow in the State of Uttar Pradesh
  • Grant of Access for Laying Utility Service (Sewer Pipeline) Along the NH-79 from Ch.0+ll9 to l+600 (LHS) and Ch.0+672 to l+256 (RHS) and two crossing at Ch.0+672 and 001+500 Ajmer to Nasirabad Road, District-Ajmer in the State of Rajasthan
  • Four laning from Km 97.600 (Udaipura) to Km 147.540 (Bhogu) of NH-75 and Four laning from Km 147.540 (Bhogu) to Km 196.870 (Sankha) section of NH-75 in the State of Jharkhand-NOC for laying of water pipeline along/across the NHs
  • Permission to carry out the Horizontal Direct Drilling (HDD) at NH-37 of Chainage between Km 533+175 for laying of 11 KV underground electric cable
  • Laying of 11 KV 3Cx300 Sqmm XLPE armoured UG Cable through HDD by M/s KSEB from Km. 9+210 to Km. 9+475 (RHS) of NH-66 (Thiruvananthapuram Bypass)
  • Permission for laying of HPCL’s Visakha - Raipur pipeline of 14” dia along with OFC (in 6” conduit) across NH-326 (Rayagada - Rapukana section) at km 206/500 at Katalaguda village in Rayagada District
  • Proposal for laying of water pipeline along/across NH-57 from km 255/400 to 277/780 and 4 no of crossings for Rural Piped Water Supply project pertaining to Bolagarh and Begunia Blocks o Khordha District under RWS& Division, Bhubaneswar
  • Proposal for grant of permission of laying 90mm dia 11kv XLPE 185 sq. mm. underground power cable along with 110mm HDPE pipe along on NH-47 Ahmedabad- Indore Highway along from (LHs) 61+900 to Km.65+950 (Length 4050m) through open trench /HDD method in extreme edge of NH ROW by MGVCL- Mahemdavad for their mandate is to establish and use a power system network near village Lasundra in Taluka and District Kheda
  • Request for RoW permission for laying Optical Fiber Cable from Banihal to Ramban by Aerial overhead Methodology by installing New Poles
  • Proposal for RoW permission for laying of 6" (152.4 mm) dia Natural Gas CS Pipeline and OFC by Bharat Petroleum Corporation Limited along NH-18 (Old NH-32)
  • Permission for laying 12”dia HDPE CO2 gas pipeline, along on NH-48 (Ahmedabad-Mumbai Road) from RHS (1) km.102+560 to Km.103+100 [540m] (2) KM.103+290 to Km.103+370 [80m] & (3) km.103+480 to km.103+600 [120m] {Total length 1) 540m + 2) 80m + 3) 120m = 740m) through open trench / HDD method in extreme edge of NH ROW by SICGIL Industrial Gases Ltd. Ranoli, for the transportation CO2 gas, Pipeline route from SICGIL Ranoli to GSFC, Vadodara project in the State of Gujarat
  • Permission for laying of electrical line/cable in NHAI ROW underground electric line crossing and laying of electrical line at NH-46 Ch. 461.642 (design Ch. 27.595) near village Bansapur Tehsil Budhni District Sehore in the State of Madhya Pradesh
  • Permission for 3900m Electrical Cable Pole at km 151.973 to km 155.873 and 2 nos. crossings at km 153.373 (160mm dia underground Gl Pipe) of 33KV Electric line from 4.9 MW Solar Power Plant at Village-Kalalda, Tehsil-Sendhwa, District-Barwani Madhya Pradesh on Indore Mumbai road of NH-52
  • Four laning from Km 147.540 (Bhogu) to Km 196.870 (Sankha) section of NH-75 in the State of Jharkhand-NOC for laying of water pipeline along/across the NHs
  • Four laning from Km 23.284 (Hariharganj) to Km 57.049 (Near Parwa More) of NH-98 and in the State of Jharkhand & Bihar on HAM-NOC for laying of water pipeline along/across the NH
  • Permission for laying of underground optical fiber cable (40mm dia HDPE duct pipe) by “Bharti Airtel Limited” from route Ch. 0+600 (LHS) to Ch. 1+600 (LHS) Dwarka Expressway Highway (New NH-248BB) & Ch. 18+150 (RHS) on NH-48 (Delhi-Jaipur Highway)
  • Proposal seeking for grant of Permission for Right of Way (ROW) for laying Aerial Optical Fiber Cable Network using GI/PSC Poles of Jio Digital Fibre Private Limited along Road Side from Ch. 8.800km to 119km in the State of Mizoram
  • Proposal seeking for grant of Permission for Right of Way (ROW) for laying Aerial Optical Fiber Cable using GI Poles along the edge of ROW from Km 0.000 to Km 5.250 (NH-54A), Km 5.250 to Km 74.950 (NH-302) in the State of Mizoram
  • Permission for Laying underground crossing of BSNL 16mm Dia OFC with single 40mm outer DIA on PLB pipe for HKT BOP under public Utility on Gagaria Bakhasar section of NH-925 Km 35.400 at village Binjrad Chouraha, District-Barmer in the State of Rajasthan
  • Proposal for laying of underground Water Pipe line along & across of highway section of Haridwar-Nagina project of NH-74 Tehsil-Najibabad, District-Bijnor in the State of Uttar Pradesh
  • Proposal towards permission for Laying of Water Pipeline under AMRUT Mission 2.0 Water Supply Scheme along NH-30 from Km. 74+830 to Km. 74+845 (BHS) & 1 no. crossing at Km. 74+845
  • Proposal for Crossing "New 33 Kv line (interlinking) between 33 Kv Mega Food Park Feeder and 33/11 substation Maroud D/D of O&M DN. CSPDCL Kurud" between at Km 46 to 47 of NH-30​
  • Permission to lay underground drinking water supply pipeline in Balangir & Puintala block of Balangir district under mega water supply project by RWS&S Division, Balangir
  • Proposal for permission for laying underground water supply pipe line under Jal Jeevan Mission ALONG from Km. 361+610 to Km. 362+857 (1247m) LHS, from Km. 361+306 to Km. 362+196 (889m) RHS, from Km. 363+680 to Km. 364+840 (1160m) LHS, from Km. 365+276 to Km. 368+430 (3154m) LHS, and CROSSING by HDD method at Km. 361+959, Km. 368+430 in Vill. Delpandarwa, Ambari, Dhamapur, Hanspasigawan, Deomalpur & Jahani Kheda in Block Pihani in Tehsil Shahbad in District- Hardoi on NH-30 (Shajahanpur-Sitapur Section) in the State of Uttar Pradesh
  • Proposal for permission for underground Electric Cable line by HDD method along NH-24 (New NH-30) Bareilly-Shajahanpur Road One crossing at Ch. 268+200, Gausganj Sarai, Near Faridput Bypass, District-Bareilly in the State of Uttar Pradesh
  • Proposal for laying overhead electrical cable 11 Kv line NH at kni 238.100 to km 238.600 (LHS) along the road on NH-53 near Babhulgaon Tq. & District-Akola
  • Proposal for grant permission for laying of underground 200mm dia. Drainage I sewer pipelines f rom Ch. 3.045 to Ch. 4.050 (1005 mtr.) & 3 nos of cmssings at Ch. 1.900, Ch. 3.045 & Ch. 4.050 along/ across NH-752E of District-Aurangabad
  • Grant of Permission for laying of 1100mm dia, DI water supply pipeline (APIIC) in the RoW of NH-16 between from Vedullapalem Junction at Km.792+950 to Kagitha at Km.794+050 on RHS and HDD crossing at Km. 794+050 from RHS to LHS for a length of 30 mts of NH-16 in the State of Andhra Pradesh
  • Proposal for permission for Sewarkhedi-Silarkhedi MS Water Pipeline Crossing at Ch. 19+500 on Dewas-Ujjain section of NH-752D, Village-Datana, Tehsil & District-Ujjain under execution of the EE, WRD Ujjain
  • Proposal for laying of underground crossing of 33KV Electric Cable/ Line of M/s Kashi Vishwanath Steels Pvt. Ltd. at Km. 156+770, of Nagina- Kashipur section of NH-74 (New NH- 734), under Kashipur Bypass in Tehsil-Kashipur, District-Udham Singh Nagar, in the State of Uttarakhand
  • Proposal of Application for grant of permission for execution of Raw Water Transport Sysytem In Sahibganj District-Regarding NOC
  • Permission for crossing of NH-150A (Jewargi-Chamarajanagar) Road between Km. 157 to Km. 158 for 765 KV D/C Koppal-II PS-Raichur Transmission line in the State of Karnataka by Powergrid Koppal Gadag Transmission Limited-Overhead NH Crossing
  • Permission for erection of 33 KV transmission line on NH-57 from km 247/400 to 250/200 (RHS) (Krushna Prasad to Bankasalua) in Nayagarh district for construction of Kusumi Smart Irrigation Project (UGPL)
  • Proposal of M/s Reliance Industries Ltd. for permission for laying of Biogas pipeline from km. 56.280 to km. 57.080 RHS in the State of Odisha
  • Permission for laying a 400KV double circuit EHV Overhead cable line at Km. 283+800 from RHS to LHS on the Solapur-Hyderabad NH-65 in Village-Andur, Tal-Tuljapur, District-Dharashiv
  • Application against laying 05 nos. of HDPE Pipes for carrying 33 KV electric cables across NH-37 (Old) (NH-715 New) at Ch Km 459+680 in front of Royal Awas, Jorhat
  • Proposal for laying of 4-inch dia. CS Pipeline for Gas distribution through open cut method and HDD method along and across the NH-715 from NH Ch 27+900 to Ch 28+665 with crossing at Ch 28+665 in Sonitpur District
  • Permission for laying of public utility laying of 03 nos. of underground crossing of 11KV electric cable at Village-Panihar & Mohana District-Gwalior across NH-46, Gwalior-Shivpuri section at km. 19.800, 54.425 & 56.460 in the State of Madhya Pradesh
  • Proposal for Laying of a public utility “City Gas Distribution (CGD)” pipeline crossing across NH-44(Agra-Bombay Highway Old NH-3) one number of crossings at Ch. Km 80.740 (Total Crossing Length 0.0394 Km)
  • Proposal for permission for laying water Pipeline encasing MS pipes for HDPE water supply pipes by HDD (Trenchless method across NH-328 (Basti-Mehndawal road), unde Rural Water Supply projects, Phase-5, District-SantKabir Nagar, in (km 19.32) across at Chainages km 18.246, 19.077, 20.930 & 31.168 having casing MS Pipe Diameter verying from 150MM to 250MM and HDPE Water Pipeline verying from 63MM to 200MM on NH-328 (Basti-Mehndawal road), in District-Sant Kabir Nagar in the State of Uttar Pradesh
  • Proposal of Bolpur Municipality for ROW permission for laying of underground 350 mm dia water pipeline along the NH-114 from Rajatpur (Gheropara) at km 45.500 to Rajatpur Bus Stop at km 45.570 & from Sriniketan More at km 51.600 to Ballabpur Bus Stop at km 54.400 & from Sonajhuri Road Junction at km 53.400 to Ballabpur Bus Stop at km 54.400 & across the NH-114 with 600 mm dia casing pipe at Rajatpur Bus Stop at km 45.570 for water supply scheme under “AMRUT-2.0- Project” District-Birbhum in the State of West Bengal
  • Laying of Water Pipeline by M/s MANSOR FOODS INDIA PVT. LTD., PALARIVATTOM from Km.334+286-Km.334+433(LHS) of NH-544
  • Proposal for grant of permission for laying of 11 kv overhead HT line along Wardha-Butibori section of NH-361 form km 491 .3 50 to km 496.400 for the total length 5.05 km in the State of Maharashtra
  • Proposal for grant of permission for laying of 11 kv overhead HT line along Wardha-Butibori section of NH-361 form km 496.400 to km 501.9 00 for the total length 5.50 km in the State of Maharashtra
  • Proposal for laying of water pipeline on NH-326 from km 313/613 to km 323/481 & 6 no crossings and on NH-26 from km 331/354 to km 345/483 & 7 no crossings for Mega PWS to 16 GPs of Kundra Block & 15 GPs of Jeypore block in the State of Odisha
  • Permission for laying of water supply pipeline along NH-26 from km 226/900 (Moter) to 258/920 (Biriman, Ampanighat) for mega water supply to Koksara block under Kalahandi RWSS Division
  • Permission for laying of water pipeline across NH-326 (3 locations) and NH-26 (1 location)) for the project Mega PWS to 16 GPs of Dasmantapur block, 2 GPs of Narayana Patanablock & 9 GPs of Bandhugaon block in the District of Koraput under RWSS Division, Koraput
  • Proposal for Permission for laying 8" dia. steel pipeline & 125mm dia. MPDE pipeline along with the NH-67 (from Penna River to near NH-16 near NHAI office) by M/s AGP City Gas Pvt Ltd, Nellore from Km. 739/638 to Km. 747/745 RHS (length 8107m) and from Km. 747/745 to Km. 50/000 LHS (length 2250m) and 4 crossings at Km. 744/295, Km.746/455 and laying 8" dia. steel 125mm dia. MPDE pipeline from Km. 749/200 to Km. 750/000 RHS (length 800mm) on chainage increasing direction, for a total length (including 4 crossing) 19,389 m open cut method along NH(R&B) and HDD method for crossings at Nellore in Nellore-District in the State of Andhra Pradesh
  • Proposal for seeking an approval for laying of 66 KV, 630 sq. mm (3+1) Al, corrugated sheathed XLPE under ground power cable line (Route length 7.8 km.) for 66 kv Nanikhakhar Koday line from 220 KV Nanikahakhar substation to 66 KV Koday substation (Project approved under Kisan Suryodaya Yojana) parallel to NH-41 from km. 130.800 to 138.600 by GETCO Ltd. Anjar in the State of Gujarat
  • Permission for laying of underground water pipe line from Km.85.510 to Km. 87.170 (1660m) LHS & RHS on NH-509 and crossing by HDD method at Km. 86.450 (Bahjoi–Gunnaur section) at Sambhal District in the State of Uttar Pradesh
  • Permission for laying of underground water pipe line from Km.58.133 to Km.61.530 (3397m) RHS & from Km.58.413 to Km.61.102 (LHS) (2689m) on NH-509 (Chandausi–Bahjoi section) at Sambhal District in the State of Uttar Pradesh
  • Proposal for grant of permission for crossing (underground) of Electrical Cable on NH for proposed New 11 KV Feeder – (FSP) EDD-II Moradabad on Moradabad to Bareilly Section of NH-09 (Old NH-24) at Ch.170+800 in the State of Uttar Pradesh
  • Permission for proposal of M/s TPWODL for underground crossing of 33KV electrical line near Charmal at km. 216.680 in Sambalpur, Odisha
  • Permission for proposal of M/s TPWODL for underground crossing of 33KV electrical line near Maneswar at km. 251.735 in Sambalpur, Odisha
  • Proposal for erection of 11KV OHT line with 26 Nos. of poles along the road in Km 195/837 to Km 197/137(LHS) of NH-81(Trichy-Karur section) by M/s Terraone Infra Green Power Pvt. Ltd., Karur
  • Operation & Maintenance stage of Six laning of Kishangarh-Udaipur-Ahmadabad Section from Km. 90.000 (near-Gulabpura) to Km. 214.870 (End of Chittorgarh Bypass) of NH-79 in the State of Rajasthan under NHDP Phase-V on BOT (Toll) mode (Package-II)
  • Operation & Maintenance of two of two laning with paved shoulders of Bhilwara-Ladpura section of NH-758 from Km. 87.250 to Km. 155.000 (Total Length 67.750Km.) in the State of Rajasthan under Performance based Maintenance Contract(PBMC) mode
  • Proposal for seeking Permission by MPUDC, PIU-Sagar for excavation and laying of DI & HDPE Pipeline along and across NH Roads-Improvement of Water Supply Services in Malthone Nagar Parishad, Sagar District, Madhya Pradesh
  • Permission for proposal of M/s TP Paradeep Transmission Ltd. for Overhead Crossing from of 765 KV at Km. 23+540 at Mouza Rampei, Tehsil-Athagarh, District-Cuttack, Odisha
  • Permission for laying 125mm MDPE pipeline along NH-48 “Chittorgarh-Udaipur Section of 76” (Bhinder - Udaipur Section) in Udaipur District of Rajasthan State from Chainage 295+800 Km to 301.050 Km, from 304+400 Km to 306+255 Km , from 308+190 km to 308+960 and crossing at Chainage 298+580 Km , 300+600 Km, 304+400 Km, 306+255 Km, 308+565 Km and at 308+665 km in the State of Rajasthan for a total length of 12435 mtrs
  • Permission for laying of underground Petroleum Product Pipeline & OFC cable across NH-59 at Km 28/500 (village-Malapara of Balangir district) and NH-353 at km 77/045 (Village-Rajpur of Nuapada district) under Visakhapatnam-Raipur Pipeline Project (VRPL) of HPCL
  • Proposal of West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) regarding ROW permission for Micro-tunneling, along the road, from km 388.80 to km 389.700 of NH-14 along LHS and from km 389.700 to km 390.700 of NH-14 along RHS under PKG-28 of RDSS Project in Bibhum District in West Bengal (Total length 1900 m)
  • Proposal of M/s Shraddha Energy and lnfraprojects Pvt Ltd. for grant permission for laying 11 KV line U/G cable from km 232.500 to km 235.800 (3.3km) and underground 11 KV cable crossing at km. 232.500 & 235.400
  • Proposal seeking Permission for erection of 11KV GI SP-66 Tubular pole and 3x120 Sqmm overhead covered conductor line parallel to NH-715A at chainage km 5.7624 to km 6.6210 at Village: Baghjap to Jagi Bhakatgaon in Morigaon District under Nagaon NH Division in the State of Assam
  • Proposal for Replacement of existing old 750mm dia CI Water Supply Pipeline & installation of New M. S. 1500mm Dia Pipeline for Nimeta Filtration Plant to Sadar Estate Cross Road, Vadodara on NH-48 at KM. 117.600
  • Proposal for permission of laying underground water supply pipeline from Km. 153+110 to 154+040 (RHS), Km. 153+340 to 154+040 (LHS), Km. 158+560 to Km. 159+210 (RHS), Km. 158+685 to Km. 159+210 and 02 nos. road crossing at km. 154+040 & Km. 158+685 on NH-34 (Aligarh-Kanpur Section) in the State of Uttar Pradesh
  • Proposal for Permission for laying 125 MM Dia MDPE gas pipe line along and crossing (Km.150/485 to 164/870) connecting from Changodar to kerala GIDC up to Bavla city, Taluka-Sanand/ Bavla, District-Ahmedabad on NH-47 in the State of Gujarat
  • Operation and maintenance of De-Scoped Length of 2 lane with paved shoulder Tanot-Jaisalmer [Tank Chowk (Km. 123+550) to Jaisalmer bypass (Km. 125.573) length – 2.023 Km] of NH-68 & 2/4 lane with Paved Shoulder of Jaisalmer-Phalodi section of NH-11 from Km 105.143 to Km 265.600 length 160.457 Km, in the State of Rajasthan
  • Permission for Laying of 33Kv/11Kv Electrical Cable Crossing (Solar Power plant to GSS under KUSUM Scheme) by HDD method boring dia 150mmX 2 Nos. casing on Gagaria -Bakhasar Section of NH-925 at Km 65+960 (ROW 30m) at Village-Itada, Tehsil–Dhanau, District-Barmer in the State of Rajasthan by M/s Kailash Kailash Enterprises, Barmer
  • Proposal for permission of laying and crossing of water supply pipe from existing km 63.750 to km 62.500 RHS & 01 no. of crossing at km 63.750
  • Proposal for grant of permission for crossing (underground) of Electrical Cable on NH for proposed New 11 KV Feeder – (FSP) EDD-II Moradabad on Moradabad to Bareilly Section of NH-09 (Old NH-24) at Ch.170+800 in the State of Uttar Pradesh
  • Permission for laying of underground water pipe line from Km.58.133 to Km.61.530 (3397m) RHS & from Km.58.413 to Km.61.102 (LHS) (2689m) on NH-509 (Chandausi–Bahjoi section) at Sambhal District in the State of Uttar Pradesh
  • Permission for 132 KV D/C Nagar Untari-Garhwa overhead EHT line crossing proposal of M/s JUSNL in the project of NH-75-V (Khajuri-Wyendhamganj) at Ch. Km 233.340