  1. Six laning of Vadodara- Bharuch Section from Km 108.700 to Km 192.000 of NH-8 in the state of Gujarat on BOT basis (BOT Package-I). Proposal for ROW Permission for laying 12.75" OD x 0.25" WT MS Pipeline along with OFC across NH-48 (Old NH-8) at Ch.137.720 Km for Dahej,Dumad section of Kandla Gorakhpur LPG Pipeline project in the State of Gujarat

    Upload Document File:  42. IPC_D-1089 dt. 27.07.2021_IHB-Vadodara_Across Km 137+720_88846.pdf ...

    morthadmin - 08/26/2021 - 12:14 - 0 comments

  2. Four laning of Panikoili-Rimuli section of NH-215 from Km.O.OOOto Km.163.000 (Design Chainage KmO+OOOto Km166+173) in the State of Odisha. NOC proposal for ROW access permission for laying of 1 no. Gas pipeline of Steel of dia 272mm for CNG & City gas transportation along with 40mm dia OFC to JJKR CGD Network from Ch.Km.O+OOOat Panikoif to Ch.Km.6+ 749 (LHS), Ch.Km.13+082 to Ch.Km. 74+740 (LHS) & Ch.Km.79+070 to Ch.Km.113+400 (LHS) at Jarnunalia with total as 102.737Km within the Utility Corridor along the road & 1 no. of Crossing from LHS toRHS at Km.113+400 across the road of NH·215 in Jajpur & Keonjhar District of Odish a State as sought by the Authorised Signatory, M/s. Bharat Gas Resources Limited, Sahid Nagar, Bhubaneswar, Odisha

    Upload Document File:  1445-1446.pdf ...

    morthadmin - 08/25/2021 - 14:07 - 0 comments

  3. Development and Upgradation to 4-Laning of NH-52 from end of Biswanath Charali Bypass (km 208) to Gohpur (Km 265) in Assam under SARDP-NE Phase A project on EPC basis– Permission for laying of 24’ Dia underground Natural Gas Pipeline alongwith OFC across the section at Km 219.040, Km 247.500 and Km 253.910.

    Upload Document File:  Development and Upgradation to 4-Laning of NH-52 from end of Biswanath Charali Bypass (km 208) to Gohpur (Km 265) in Assam under ...

    morthadmin - 05/21/2021 - 13:33 - 0 comments

  4. Six laning of Nidgatta-Mysuru Section from Km. 74.200 to Km. 135.304 of NH-275 in the state of Karnataka (PKG-II) – Permission for laying Optical Fiber Cable (OFC) of 50mm dia which is crossing at Ex. Ch. 262.560 RHS and runs parallel for a route length of 21.26km in LHS from Mandya Railway station to DRDO station at K. Shettihalli from Ex. Km. 262.560 to Ex. Km. 258.320 = 4.24Km and design Ch. 104.400 to Ch. 121.420= 17.05Km LHS in NH-275 in the state of Karnataka

    ... Km. 135.304 of NH-275 in the state of Karnataka (PKG-II) – Permission f Language English Document Date:  ...

    morthadmin - 03/19/2021 - 16:53 - 0 comments

  5. Six laning of Belgaum – Dharwad Section of NH-4 from Km.433.000 to Km.515.000 (Length – 79.36 Km) in the State of Karnataka to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase – V (Package No. NHDP –V/MC-II/19)– Granting of permission to lay OFC along NH-48 (Old NH-4)

    Upload Document File:  Six laning of Belgaum – Dharwad Section of NH-4 from Km.433.000 to Km.515.000 (Length – 79.36 Km) in the State of Karnataka to b ...

    morthadmin - 03/30/2021 - 10:50 - 0 comments

  6. Four laning of Brahmani bypass to Rajamunda section of NH-143 in the state of odisha - Permission for Laying of Gas Pipeline and OFC along with NH-23 at the Location from Road ch.242.866 to Road ch.245.140 and Csross at the location Road ch.242.866

    ... to Rajamunda section of NH-143 in the state of odisha - Permission for Laying of Gas Pipeline and Language English ...

    morthadmin - 02/12/2021 - 11:16 - 0 comments

  7. Rehabilitation and up gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388,376 to Km.428.074) of NH-200 (New NH-53) in the state of Odisha under NHDP-II-ROW permission for laying iron ore slurry pipeline, return water supply pipeline & OFC in the RoW of NH-53 from chainage 3974950 to chainage 427+400

    Upload Document File:  Rehabilitation and up gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388,376 to Km. ...

    morthadmin - 02/23/2021 - 23:25 - 0 comments

  8. Rehabilitation and Up-gradation of existing NH-565 from Km. 425/400 to 509/400 (Penchalakona to Yerpedu section) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP-IV through Engineering, Procurement, & Construction (EPC) Basis” (Aggregate Length of 84 Km) - Granting of ROW permission for laying underground OFC cables along NH-565 from Km. 428/597 to 482/128 on LHS and with three crossing at Km 451/746, Km 467/430, Km 482/128 on (LHS to RHS

    ... (EPC) Basis” (Aggregate Length of 84 Km) - Granting of ROW permission for laying underground OFC cables along NH-565 from Km. 428/597 to 482/128 on LHS and with three ...

    morthadmin - 03/07/2020 - 18:31 - 0 comments

  9. 2/4 laning of Trichy Karur from Km 135/800 to Km 218/028 Section of NH-67 (New No. NH81) in the State of Tamil Nadu on BOT (Toll) basis under NHDP Phase-III A - Permission for laying OFC along the road from Km 206/000 to Km 206/400 (LHS), Km 206/400 to km 207/800 (RHS) and across at km 206/420 by M/s. Reliance Jio Infocomm Limited

    ... of Tamil Nadu on BOT (Toll) basis under NHDP Phase-III A - Permission for laying OFC along the road from Km 206/000 to Km 206/400 (LHS), Km 206/400 to km ...

    morthadmin - 03/05/2020 - 13:57 - 0 comments

  10. NHAI-PIU-Kolhapur- Four laning of Sangli-Solapur (Package-l, Sangli-Borgaon) section of NH-166 from existing km 182.195 (Design chainage Km 182.556) to existing Km 219.956 (Design Chainage Km 224.000) of length 41.444 Km in the state of Maharashtra on Hybrid Annuity Mode - Permission for laying OFC cable along NH-166 from Km 191.100 Ankali Phata Chowk Miraj to Km 191.900 Katchi Complex Chowk Miraj on Kolhapur - MirajSangola-Solapur for a total length of 0.800 Kms

    Upload Document File:  NHAI-PIU-Kolhapur- Four laning of Sangli-Solapur (Package-l, Sangli-Borgaon) section of NH-166 from existing km 182.195 (Design ...

    morthadmin - 02/01/2021 - 13:31 - 0 comments