Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Jharsuguda.pdf Permission for laying of 30” dia gas pipe line and 40mm dia HDFC duct for OFC across the NH-49 at Km 298.900 under NH Division, Jharsuguda

    Upload Document File:  Jharsuguda-8191477073.pdf ...

    morthadmin - 09/16/2020 - 11:28 - 0 comments

  2. Two-laning of Shillong connecting NH-40 and NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 under SARDP-NE on BOT (Annuity) mode: permission for laying proposed carbon steel natural gas pipeline along with Carbon steel OFC conduit across shillong NH Bypass en-route National Highway under shillong spurline

    Upload Document File:  gewdwqd738hiue9021ks.pdf ...

    morthadmin - 02/17/2022 - 10:13 - 0 comments

  3. Permission for laying of 16” dia Petroleum Pipeline along with 89 mm dia duct for laying OFC from Paradip to Hyderabad across NH-16 at Km 800.763 in Godicherla Village, Nakkapalli Mandal, Visakhaptnam District, Andhra Pradesh

    Upload Document File:  RO VJA RJY 12014 118-3621720415.pdf ...

    morthadmin - 09/07/2020 - 16:30 - 0 comments

  4. Proposal for permission for laying of GAIL 100mm (4”) Dia steel pipeline for Patna city gas distribution network along with dia 40mm OFC duct / cable along with NH-19

    Upload Document File:  1504-0391615756.pdf ...

    morthadmin - 09/07/2020 - 16:09 - 0 comments

  5. Proposal for permission for laying of Gail’s 200 MM (8") dia steel pipe line for Pata city gas Distribution Network with dia 40 MM ofc duct crossing and along NH-30

    Upload Document File:  NH30-7285629246.pdf ...

    morthadmin - 09/07/2020 - 15:39 - 0 comments

  6. Six-laning of Samakhiali-Gandhidham (Km 306+000 to Km 362+160 =Length-Km 56+16) section of NH-8A in the state of Gujarat to be executed as BOT (Toll) on DBFOT under NHDP Phase-V. Reg. Proposal for ROW permission for laying of OFC Cable and 40mm HDPE Pipe along Km 306+000 to Km 331+500 on LHS & Across at Km 330+750 on NH-41

    Upload Document File:  011. IPC_D-422 dt. 11.02.2022_Telesonic_Km 306 to Km 331+500_PD-Palanpur-128524 (1).pdf ...

    morthadmin - 02/15/2022 - 10:10 - 0 comments

  7. Construction of Six-lane access controlled highway (NH-152D) starting from junction with NH-9 (Rohtak-Jind section) near Kharkara to Junction with NH- 334B (Charkhi Dadri- Jhajjar section) near Charkhi Dadri (Ch. 131+000 to 165+000; length 34 Km) on EPC mode under Bharatmala Pariyojna in the State of Haryana (Pkg-6) - Permission to lay Sultanpur-Jhajjar-Hisar Natural Gas pipeline along with OFC across under construction road b/w Ch. 142.800 to 143.000 at village- Kherari, Tehsil Kalanaur, Dist.- Rohtak

    Upload Document File:  8616(1).pdf ...

    morthadmin - 02/08/2022 - 12:46 - 0 comments

  8. Four Ianning of Wardha-Butibori (Package-IV) section of NH-361 from km.465.500 to km 524.690 (Design Length - 59.190 Km) under NH (0) in the State of Maharashtra on Hybrid Annuity Mode - Permission for laying of GAIL's proposed 24" dia Gas pipeline alongwith OFC Cable across National Highway-361 at 511.550 km NH Ch &. 651.274 km pipeline chainage falling en-route Mumbai to Nagpur Pipeline in Nagpur District

    Upload Document File:  3450 - 07.01.2022.pdf ...

    morthadmin - 01/08/2022 - 16:15 - 0 comments

  9. Four Ianing of Waranga- Mahagaon from km 253.700 to km 320.580 Section of NH-361 in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode - Proposal for permission to carry out Horizontal Direct Drilling (HDD) and Open Trenching work for laying of OFC Telecom Ducts/ Cable (2 Nos) along and Jurisdiction on "NH-361" from km 266.5000 to km 294.450 for the section of Total length 31.480 kms in NHAI, PIU Nanded

    Upload Document File:  3422 - 07.01.2022.pdf ...

    morthadmin - 01/07/2022 - 10:59 - 0 comments

  10. Projects comprising of 9 NH stretches (Bundle-1) Bamanbore-Garamore (Km 182+600 to Km 254+537) section of NH-27 in the state of Gujarat on Toll, Operate, Maintain & Transfer Mode. Reg. Proposal seeking ROW permission for laying OFC Cable (4G Project) along the route Km 196+450 to Km 198+652 (Total Length 2202 Mtrs) on LHS, near Jodhpur Village on Bamanbore-Morbi section of NH-27 in the state of Gujarat.

    Upload Document File:  91. IPC_D-2504 dt. 20.12.2021_Jio_Km 196+450 to K 198+652_Jodhpur_PD-Rajkot let.no_.D-2206_eoffice-59298(1).pdf ...

    morthadmin - 12/21/2021 - 14:40 - 0 comments

Pages