Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Permission for laying water pipe line from km.24.40 to km 33.80 on NH-60A and crossing at different Chainage under Bankura Dsitrict pipe water supply project (Phase-ll) assisted by ADB under PIU-Bankura, WBDWSIP, P.H.E. Dte. in the State of West Bengal

    Upload Document File:  km.24.40 to km 33.80 on NH-60A-11.pdf ...

    morthadmin - 03/28/2022 - 10:48 - 0 comments

  2. NHAI-RO Kerala- Four laning of Thiruvananthapuram bypass from Kazhakuttam-Mukkola (Km.0+000 to Km.26+500) section of NH-47(New NH-66) under NHDP Phase-ll! in the State of Kerala- Permission for Laying 11 KV UG cable from Paruthikuzhy RMU to Paruthikuzhy new RMU for replacing the faulty cable by HDD method across NH bypass under Electrical section, Poonthura in Thiruvananthapuram Bypass

    Upload Document File:  0433-2022-11.pdf ...

    morthadmin - 03/28/2022 - 10:47 - 0 comments

  3. NHAI, PIU, Krishnagiri- Laying of water pipeline along the road from km.69/928 to km.70/132 (LHS) for a total length of 204m and one road crossing at km.70/132 by trenchless technology of Krishnagiri - Walajahpet section of NH-48 (Old NH-46) by Executive Engineer, TWAD Board, Vellore

    Upload Document File:  1509.pdf ...

    morthadmin - 11/11/2021 - 10:21 - 0 comments

  4. Proposal for grant of permission for NH overhead crossing of 220 KV D/C Transmission line at Km. 162.580 of Khajuwala-Poogal sec. of NH-911 from PSS1 to PGCIL 765 KV GSS Bhadala-Il from Tower Loc. AP3 (DD+9) to Loc. AP4 (DD+6) by M/s. Rajasthan Solarpark Development Company Ltd. (RSDCL)

    Upload Document File:  3791 dt 25-03-2022-1-1.pdf ...

    morthadmin - 03/25/2022 - 17:18 - 0 comments

  5. Proposal for grant of permission for NH overhead crossing of 220 KV D/C Transmission line at Km. 156.550 of Khajuwala-Poogal sec. of NH-911 from PSS3 to PSS4 from Tower Loc. AP2 (DD+9) to Loc, AP3 (DD+9) by M/s. Rajasthan Solarpark Development Company Ltd. (RSDCL)

    Upload Document File:  3784 dt 25-03-2022(1).pdf ...

    morthadmin - 03/25/2022 - 17:07 - 0 comments

  6. Operation & Maintenance Period for Palanpur Swaroopganj Section of (Km 340.00 to 264.00) on NH-14 in the State of Gujarat and Rajasthan four-lane Highway Constructed on BOT (Annuity) Basis under NHDP Phase-II. - Proposal seeking ROW permission for crossing of Highway by 66KV S/C Palanpur to Chandisar_ Line CKT-2 with ACSR Panther Conduct or under “KISAN SURYODAYA YOJNA” between Km 580+000 & Km 581+000 of NH-27 in the state of Gujarat

    Upload Document File:  30. IPC_D-871 dt. 25.03.2022_GETCO-Deesa_66KV Km 580-581_PD-Palanpur-133575-1.pdf ...

    morthadmin - 03/25/2022 - 16:46 - 0 comments

  7. Regarding permission for laying Natural Gas pipeline of 10 inch diameter from km 13+380 to km 17 + 880 along old NH 71 in section of Rohtak Panipat section of Highway in district- Rohtak in the State of Haryana by open trench method from km 17+380 to km 19+380 and rest by HDD method and 1 Crossing at km 15+137 of 16 inch diameter by HDD method in Rohtak -Panipat section of Highway in district- Rohtak in the State of Haryana

    Upload Document File:  Regarding permission for laying Natural Gas pipeline of 10 inch diameter from km 13+380 to km 17 + 880 along old NH 71 in sectio ...

    morthadmin - 12/22/2020 - 11:09 - 0 comments

  8. NHAI, PIU — Viluppuram — Proposal seeking NOC and Permission for laying of Sewerage Pipeline across the road at Km.164/000 of NH-45 at Ellis Chathiram Junction (Tindivanam to Ulundurpet section) in Viluppuram District in the state of Tamilnadu — by the Executive Engineer, TWAD Board RWS Division, Viluppuram — Approval Requested

    Upload Document File:  npcqwnwqpihvwgsak.pdf ...

    morthadmin - 03/24/2022 - 11:08 - 0 comments

  9. Operation & Maintenance Period for Palanpur Swaroopganj Section of (Km 340.00 to 264.00) on NH-14 in the State of Gujarat and Rajasthan Four-lane Highway Constructed on BOT (Annuity) Basis under NHDP Phase-Ill. - Proposal seeking ROW permission for crossing of Highway by 66KV S/C Palanpur to Chandisar Line CKT-2 with ACSR Panther Conduct or under “KISAN SURYODAYA YOJNA” between Km 598+000 & Km 599+000 of NH-27 in the state of Gujarat

    Upload Document File:  26. IPC_D-819 dt. 23.03.2022_GETCO-Deesa_Across Km 598+00_PD-Palanpur-133573-1.pdf ...

    morthadmin - 03/24/2022 - 10:17 - 0 comments

  10. Proposal seeking permission for laying of underground 12”/8”" dia steel Gas pipeline along with 125mm MDPE Gas pipelines and installation of sectionalizing valve of chamber (Size 1.00M X 2.5 M) along NH-275K- 41.535 through open trench method and 5 nos crossings at km. 1.87, Km. 23.920, Km. 28.260, Km 29.080, Km. 34.857 through HDD method by AGP City gas private limited, Mysuru

    Upload Document File:  AGP City Gas pvt. ltd. NH-275K.-1.pdf ...

    morthadmin - 03/21/2022 - 10:25 - 0 comments

Pages