  1. NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 22.232 Km from Km.616+803 to Km.621+549 (RHS), from Km.631+200 to Km.631+240 (RHS), from Km.621+549 to Km.626+500 (LHS), from Km.627+500 to Km.639+500 (LHS), along NH-61 by Open trench Methodology and Highway crossings by HDD methodology at Km.616+803, Km.619+435, Km.620+707, Km.621+549, Km.628+150, Km.628+905, Km.631+200, Km.631+904, Km.635+850, and Km.636+000 on Kalyan to Nirmal section of NH-61 in the State of Telangana

    Upload Document File:  2082 dated 25.11.2021(1).pdf ...

    morthadmin - 11/28/2021 - 15:48 - 0 comments

  2. Permission for laying of 400mm dia pipeline along NH from km.4.425 to km.4,920 (RHS) and 1 Crossing of 400 mm outer diameter HDPE Sewerage pipeline at km.4.425 by HDD method on NH-73A, Jagadhari —Ponta Sahib Road in the State of Haryana

    Upload Document File:  55-17 dated 05.04.2022(2).pdf ...

    morthadmin - 04/05/2022 - 12:56 - 0 comments

  3. Proposal for grant of NH clearance for the diversion/ modification work of 400KV D/C Manesar- Neemrana Transmission line due to infringement with Delhi-Gurgaon-Rewari SNB (Alwar), Regional Rapid Transit System (RRTS) Alignment of M/s. NCRTC by M/s, Power Grid Corporation Ltd. (PGCIL) - Approval of crossing of NH-08

    Upload Document File:  10 dt 01-04-2022-1.pdf ...

    morthadmin - 04/04/2022 - 10:21 - 0 comments

  4. NHAI - RO Hyderabad - PIU Hyderabad- Proposal for laying of Optical Fiber Cable for a total length of 14.90 Km from Km.77+700 to Km.86+600 (RHS), & from Km.115+000 to Km.121+000(LHS) along NH-161AA by HDD methodology on Sangareddy- Narsapur- Toopran- Gajwel- Jagdevpur- Bongir- Choutuppal road of NH-161AA in the State of Telangana

    Upload Document File:  3531 dated 29.03.2022-1.pdf ...

    morthadmin - 04/04/2022 - 10:11 - 0 comments

  5. PIU, Chennai – Proposal for laying of 33 KV 1 x 630 sqmm XLPE UG Cable from SRMC 110 KV SS to Kovoor 33/11 KV SS along the road from km 12/060 to km 12/260 by Trenchless Method and from km 12/260 to km 13/060 on LHS by Open Trench method in Chennai Bypass by Executive Engineer, Civil, CDC, TANGEDCO, Chennai

    Upload Document File:  PIU, Chennai – Proposal for laying of 33 KV 1 x 630 sqmm XLPE UG Cable from SRMC 110 KV SS to Kovoor 33/11 KV SS along the road ...

    morthadmin - 02/10/2021 - 16:25 - 0 comments

  6. Proposal seeking permission for laying of pipeline for filling of tanks in Yelaburga and Koppal taluks of Koppal District by lifting water from Tungabhadra river for drinking purpose along NH-367 from Km. 1.450 to Km. 26.00 and crossing at Km. 1.450 & Km. 26.00 by Minor Irrigation & Ground Water Development Department, Division Koppal

    Upload Document File:  NH-367 Km 1.450 to Km 26.00 MI&GWD Koppal(1).pdf ...

    morthadmin - 11/18/2021 - 23:27 - 0 comments

  7. NHAI-RO Kerala-Accommodation of Public and Industrial Utility Service along National Highways-Laying of 90mm PVC Pipeline through Open trenching by KWA from Sasthamugal Jn. to Palachuvadu (Km 275+530 to Km 276+010) (RHS) of NH-85

    Upload Document File:  0472-2022.pdf ...

    morthadmin - 04/01/2022 - 14:08 - 0 comments

  8. NHAI - PIU - Puducherry - Four laning of Sattanathapuram (Km.123/800) to Nagapattinam (Km.179/555) Section of NH-45A on HAM under NHDP Phase-IV in the state of Tamil Nadu - Request for permission to lay Ennore - Thiruvallur- Bengaluru-Puducherry-Nagapattinam-Madurai-Tuticorin R-LNG Pipeline alongwith Optical Fiber Cable (OFC) across NH-45A by Horizontal Directional Drilling Method (HDD)

    Upload Document File:  Lr_No_0627_dt-31-03-2022-1.pdf ...

    morthadmin - 04/01/2022 - 10:43 - 0 comments

  9. Regarding permission for Laying of Gas pipeline of 8 inch Dia steel natural gas pipeline from km 185.304 to km 186.202 by HDD method along a NH 354 in Gurdaspur Dera Baba Nanak section Highway from Village Desh Bharat Nagar and Nabipur, district-Gurdaspur in the State of Punjab by open cut method

    ... Dia steel natural gas pipeline from km 185.304 to km 186.202 by HDD me Language English Document Date:  ...

    morthadmin - 01/29/2021 - 18:51 - 0 comments

  10. NHAI - RO Hyderabad - PIU Hyderabad- Proposal for laying of Optical Fiber Cabte for a total length of 8.63 Km from Km.52+400 to Km,.53+600 (RHS), from Km.56+500 to Km.60+000 (RHS)}, from Km.60+000 to Km.62+370 (RHS), from Km.59+740 ta Km.59+990 (LHS), & from Km.62+370 to Km.63+590 (LHS) along NH-765 and Highway crossings at Km. 52+400, km.59+700, & Km.62+370 by HDD methodology on Hyderabad to Srisailam section of NH-765 in the State of Telangana

    Upload Document File:  3549 dated 29.03.2022(1).pdf ...

    morthadmin - 03/31/2022 - 13:05 - 0 comments