  1. Karaipettai section of NH-4 - Request for permission to lay 33KV 1 x 630 Sq.mm XLPE UG Cable from Nokia 230KV SS to proposed Sriperumbudur 33/11KV SS at Km.41/360 to Km.42/200 (RHS) along the road by Open Trench Method and across the road in one location at Km.42/200 by Trenchless Method in Sriperumbudur – Karaipettai section of NH-4 in the State of Tamil Nadu

    ... 33/11KV SS at Km.41/360 to Km.42/200 (RHS) along the road by Open Trench Method and across the road in one location at Km.42/200 by Trenchless Method in Sriperumbudur – Karaipettai section of NH-4 in the ...

    morthadmin - 11/21/2019 - 14:31 - 0 comments

  2. Proposal seeking permission for laying of underground 12’’dia steel Gas pipeline along NH-69 (Old NH-234) from Km 278.980 to Km 288.670 (RHS) and 1 no. crossing at Km 288.670 in the State of Karnataka by AGP City gas private limited through open trench/HDD push technique method

    Upload Document File:  public comment km. 278.980 to Km. 288.670(1).pdf ...

    morthadmin - 05/27/2022 - 14:17 - 0 comments

  3. Proposal seeking Permission for laying of OFC alon NH -73 (Old -NH-234) from Bantwal Km 20.100 to Jakribettu Km 24.100 (RHS) and one Road Crossing at Km 20.100 for the total length of 4.00 Kms by M/s Telesonic Network Limited through HDD method

    Upload Document File:  Public Bengaluru Comm Km.20.100 to Km.24.100(1).pdf ...

    morthadmin - 05/25/2022 - 16:33 - 0 comments

  4. Permission for laying of 02 Nos. 3x300mm XLPE Cable width 150mm each dia Pipeline (HDPE) from Km. 558.980 to Km.558.976 along with NH-19 (Bilinda- Allahabad Section) total length of ROW applied for 86 mtr. and once crossing (100 mtr.) 558.976 at Haswa near Village-Bilinda in Distt. Fatehpur in the State of U.P, by PVVNL

    Upload Document File:  Letter no 1349 dated 24 05 2022 ( Public Comments)_00001.pdf ...

    morthadmin - 05/25/2022 - 09:44 - 0 comments

  5. Rehabilitation and up-gradation of existing 2 lane to 4-lane standards of Rimuli (Km 163.000) to Koida (Km 206.200) Section of NH-215 (New NH-520), Le. Package-lin the State of Odisha on EPC Mode under NHDP Phase-Ill on EPC Mode & Rehabilitation and up-gradation of existing 2 lane to 4- lane standards to Koida (Km.206.200) to Rajamunda (km.259.453) Section of NH-215 (New NH- 520), ie., Package-ll in the State of Odisha under NHDP Phase Ill on EPC Mode- Request for installing 600mm Dia Pipe Conveyor and 33 kV insulated cable over an overhead structure with 1700mm width along the LHS of NH Utility Corridor in Rimuli- Rajamunda section of NH- 520 from Km.204.000 to Km.212.000 by M/s JSW USL

    Upload Document File:  1452-1453(1).pdf ...

    morthadmin - 05/24/2022 - 17:00 - 0 comments

  6. NHAI - RO Hyderabad - PIU Sangareddy-Proposal for laying of Optical Fiber Cable for a total length of 8.673 Km from Km.66+192 to Km.67+317 (RHS), from Km.70+690 to Km.71+576 (RHS), from Km.71+576 to Km.73+463 (LHS), & from Km.74+978 to Km.79+513 (LHS), along NH-161 by Open trench Methodology and Highway crossings by HDD methodology at Km. 68+828, Km. 71+576, Km.73+440 & Km.79+513 on Ramsanpalle to Mangloor section of NH-161 in the State of Telangana

    Upload Document File:  3006 dated 07.02.2022(1).pdf ...

    morthadmin - 02/10/2022 - 11:19 - 0 comments

  7. NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 17.099 Km from Km.290+263 to Km.295+295 (LHS),from Km.295+295 to Km.299+315 (RHS), and from Km.305+920 to Km.3131507 (RHS) along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.295+295 on Nagpur to Hyderabad section of NH-44 in the State of Telangana

    Upload Document File:  3032 dated 07.02.2022(1).pdf ...

    morthadmin - 02/10/2022 - 11:13 - 0 comments

  8. NHAI - RO Hyderabad - PIU Nirmal-Proposal far laying af Ontiral Fiber Cable for a total length of 2.793 Km from Km.373+762 to Km.376+090 (LHS), and from Km.376+090 to Km.376+495 (RHS), along NH-44 by Open trench Methadology and Highway crossings by HDD methodology at Km.376+090 on Nagpur to Hyderabad section of NH-44 in the State of Telangana

    Upload Document File:  3037 dated 07.02.2022(1).pdf ...

    morthadmin - 02/10/2022 - 11:03 - 0 comments

  9. NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 33.315 Km from Km.343+507 to Km.314+225 (RHS), Km.341+225 lo Km.341+790 (RHS), and from Km.341+790 to Km.373+762 (LHS), along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.341+790 on Nagpur to Hyderabad section of NH-44 in the State of Telangana

    Upload Document File:  3038 dated 07.02.2022(1).pdf ...

    morthadmin - 02/10/2022 - 11:02 - 0 comments

  10. NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 4.947 Km from Km.376+495 to Km.378/405 (RHS),from Km.380+316 to Km.383+300 (RHS), and from Km.383+300 to Km.383+320 (LHS) along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.383+300 on Nagpur to Hyderabad section of NH-44 in the State of Telangana

    Upload Document File:  3034 dated 07.02.2022(1).pdf ...

    morthadmin - 02/10/2022 - 10:59 - 0 comments