Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Permission proposal for laying underground Sewer pipe line along the road from Km 65/457-65/532(LHS),Km 65/568-65/624(RHS) Km 65/871-66/063(RHS),Km 66/100-66/211(LHS),Km 66/390-66/635(LHS), Km 66/850-66/991(RHS),Km 66/915-69/300(LHS) and crossing at Km 65/532, Km 65/723, Km 65/787, Km 65/871, Km 66/170,Km 66/291,Km 66/407, Km 66/665, Km 66/800 and 66/915(10 Nos.) of NH-234(New NH-38)(Mangalore-Villupuram road) in the state of Tamil Nadu-for providing under AMRUT Scheme By Vellore City Municipal Corporation

    Upload Document File:  owgwubenehdjsnowonkdowjdg_00001.pdf ...

    morthadmin - 06/14/2022 - 14:08 - 0 comments

  2. Permission proposal for laying underground Sewer pipe line along the road from Km 57/800-58/653(RHS),Km 59/343-59/500(LHS),Km 59/225-59/600(RHS) crossing at Km 56/630,Km 56/900,Km 57/525,Km 58/170 and 59/110(5 Nos.) of NH-234(New NH- 38)(Mangalore-Villupuram road) in the state of Tamil Nadu-for providing under AMRUT Scheme By Vellore City Municipal Corporation

    Upload Document File:  jsisvwisuwowohdjdpelahd_00001.pdf ...

    morthadmin - 06/14/2022 - 14:08 - 0 comments

  3. Proposal for access permission to M/s HPCL for crossing of 115mm diameter gas pipeline at km 64+280 & laying along from km. 62+760 to 64+280 (RHS) in Sonepat-Panipat section of old NH- (New NH-44) by HDD method in the State of Haryana

    Upload Document File:  02-1247 dated 13.06.2022_00001.pdf ...

    morthadmin - 06/14/2022 - 10:32 - 0 comments

  4. Proposal - Permission for taying of lndian Oil-Adani Gas pipetine atong the National Highway NH-17-B ( Verna Junction - sada Junction section ) on LHS from Km, 000/000 to Km, O4/OOO & Km, 08/000 to Km, 09/435 and from Km,002/200 to Km,002/400 on RHS by Open Trenching Method & 6 Nos of Road crossing @ Km, 000/025, Km, 0021400 Km,003/200 Km,008/000 Km,009/435 & Km, 013/100 by HDD Method' in the state of Goa

    ... to Km, 09/435 and from Km,002/200 to Km,002/400 on RHS by Open Trenching Method & 6 Nos of Road crossing @ Km, 000/025, Km, 0021400 Km,003/200 Km,008/000 Km,009/435 & Km, 013/100 by HDD Method' in the state of Goa Language English ...

    morthadmin - 09/21/2020 - 16:42 - 0 comments

  5. Laying of underground R-LNG pipe line along with OFC cable across NH 234 at Km 496.342 by M/s. Indian Oil Corporation ltd. by HDD method

    ... pipe line along with OFC cable across NH 234 at Km 496.342 by M/s. Indian Oil Corporation ltd. by HD Language English Document Date:  ...

    morthadmin - 09/21/2020 - 12:19 - 0 comments

  6. Laying of underground R-LNG pipe line along with OFC cable across NH 234 at Km 496.342 by M/s. Indian Oil Corporation ltd. by HDD method

    ... pipe line along with OFC cable across NH 234 at Km 496.342 by M/s. Indian Oil Corporation ltd. by HD Language English Document Date:  ...

    morthadmin - 09/21/2020 - 12:18 - 0 comments

  7. RO - Vijayawada - Permission for crossing of Overhead electrical 400 KV Twin Moose DC line from existing 400/200KV Vemagiri substation to 400/200KV Kamavarapukota Substation (Zone-5) on Turn Key basis by APTRANSCO across NH-16 at flyover No.48 (Km 37.850) near Dubacherla Village, Nallajral Mandal (60m) for a total length of 60m in West Godavari District in the State of Andhra Pradesh

    Upload Document File:  1870 09.06.2022 400 KV Tower crossing(1).pdf ...

    morthadmin - 06/13/2022 - 11:18 - 0 comments

  8. RO - Vijayawada - Permission for crossing of Overhead electrical 400 KV Twin Moose DC line from existing 400/200KV Vemagiri substation to 400/200KV Kamavarapukota Substation (Zone-5) on Turn Key basis by APTRANSCO across NH-16 at flyover No.48 (Km 37.850) near Dubacherla Village, Nallajral Mandal (60m) for a total length of 60m in West Godavari District in the State of Andhra Pradesh

    Upload Document File:  1870 09.06.2022 400 KV Tower crossing(1).pdf ...

    morthadmin - 06/10/2022 - 14:38 - 0 comments

  9. Four/Six Laning of Gujarat/ Maharashtra Border-Surat-Hazira Port section of NH-6 (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Reg. Proposal for ROW Permission of laying Pipeline near Unn-Gabhani Junction at Gabhani Khadi_bridge- Across NH-53 at Km 33+020 and Km_33+060 in between Km 33+000 and Km 34+000 by Boring & Pushing Method (HDD Method)

    Upload Document File:  56. IPC_D-1639 dt. 06.06.2022_Colourtex_Km 33+020-Km 33+060_PD-151367_00001.pdf ...

    morthadmin - 06/06/2022 - 17:38 - 0 comments

  10. Proposal seeking Permission for laying Optical Fibre Cable at (i) Silchar Capital Point to Madhurapul (Clock Tower) via Rongpur (L=3.65 Kms) on NH-53 (Old)/NH-37 (new), (ii) Silchar SILO83 Tower near Ismail market to Capital Point via Indian Oil Petrol Pump (L=0.480 Kms) on NH-54 (Old)/ NH-306 (New) & (iii) Pailapul (Near Nehru Statue) to Pailapul (Manipur Road) (L=0.25 Kms) on NH-53 (old)/NH-37 (New) by M/s Telesonic Networks Ltd. under Silchar NH Division

    Upload Document File:  RO letter dated 03.06.2022 Public Comments.pdf ...

    morthadmin - 06/06/2022 - 09:08 - 0 comments