Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Regarding permission for Laying of Gas pipeline of 8 inch inner Diameter steel natural gas pipeline or 125 mm MDPE Gas pipeline from km 292.677 to km 302.400 (RHS), km.292.166 to km. 295.680 (LHS), km 326.900 to km 327.730 (LHS), km 329.400 to km 352 (RHS), km 352 to km 357.300 (LHS), km 357.300 to km 361.710 (RHS) and km 361.710 to km 362.660 (LHS) (total length 47.347 km ) along old NH- 01 (New NH - 44) by open trench method or where not feasible as per site condition then by HDD method or as per direction of PD PIU Ambala (In around 4 km due to restricted ROW , gas pipeline will be laid below footpath by HDD method and repair will be done by M/s Think Gas as per direction of PD, PIU-Ambala) and Crossing at km 267.640 , 289.900, 295.680 , 336.065, 352, 357.300 and 361.710 by HDD methodacross old NH- 01 (New NH - 44) and in Panipat Jalandhar section of Highway from Doraha to Sahnewal, Ladowal, Phillaur to Lovely Institute in Ludhiana, Jalandhar and Kapurthala

    Upload Document File:  Regarding permission for Laying of Gas pipeline of 8 inch inner Diameter steel natural gas pipeline or 125 mm MDPE Gas pipeline ...

    morthadmin - 05/10/2021 - 21:13 - 0 comments

  2. Laying of water supply pipeline of 100m diameter from Km. 235.600 to Km. 236.000 (LHS), and one crossing at Km 235.600 in Rajpura District on old NH-01 (New NH-44) by HDD method

    Upload Document File:  02-2795 dated 15.09.2022..pdf ...

    morthadmin - 09/16/2022 - 15:56 - 0 comments

  3. Proposal for grant of permission for laying of water supply pipeline of 100mm diameter on Rajpura-Sirhind Road from Km. 238.340 to Km. 238.820 (RHS) and one crossing at Km. 238.340 by HDD method on old NH-01 (New NH-44) in the State of Punjab

    Upload Document File:  02-2781 dated 15.09.2022.pdf ...

    morthadmin - 09/16/2022 - 11:13 - 0 comments

  4. Proposal for grant of permission for laying of 350mm diameter water supply pipeline from Km. 217.100 to Km. 217.880 (RHS) and one crossing at Km. 217.100 by HDD method on old NH-01 (New NH-44) in the State of Punjab

    Upload Document File:  02-2782 dated 15.09.2022.pdf ...

    morthadmin - 09/16/2022 - 11:05 - 0 comments

  5. Proposal for grant of permission for laying of water supply pipeline from Km. 233.300 to Km. 233.900 (LHS), including one crossing at Km. 233.900 by HDD method in district Rajpura of old NH-01 (New NH-44) in the State of Punjab

    Upload Document File:  02-2783 dated 15.09.2022.pdf ...

    morthadmin - 09/16/2022 - 10:57 - 0 comments

  6. Proposal for grant of NH crossing for construction of Khetri Bhiwadi 400 KV D/C Transmission line (Twin TLS) associated with Transmission Scheme for evaluation of power from Solar Energy Zones in Rajasthan (8.1) GW under Phase-II Part-F tariff based competitive bidding (TBCB) route by M/s. PGCIL- Approval of crossing between Km. 89-90 of NH-48 in the State of Haryana

    Upload Document File:  1837 dt 13.09.2023.pdf ...

    morthadmin - 09/15/2022 - 10:23 - 0 comments

  7. Proposal for overhead laying of UHBVN Electrical Line (33kv ACSR 150mm2) on through M+6 tower and one crossing 33kv U /G 1 Core 630mm2 XLPE cable (4 nos) of UHBVN from km. 52+324 (RHS) to km. 52+764 (RHS) length 440m, km 52+764 (LHS) to 52+764 (LHS) (total no. of tower 13) at crossing Km 52+831 (length 60m) (Total length 567m) on NH-44 District Sonepat by HDD method

    Upload Document File:  02-2744 dated 14.09.2022.pdf ...

    morthadmin - 09/15/2022 - 10:14 - 0 comments

  8. 4/6 Laning of Thrissur (Km 270.000) to Angamali (Km 316.700) and Improvement, Operation & Maintenance of Angamaly (316.700) to Edappally (Km to 342.000) section of NH-47 (New NH-544) on BOT(Toll) basis in the State of Kerala-Laying of Natural Gas pipeline from Km.276+650-Km.294+300 and crossing at Km.276+650 and Km.282+150 of NH-544 by M/s IOAGPL

    Upload Document File:  1418-2022.pdf ...

    morthadmin - 09/13/2022 - 10:37 - 0 comments

  9. Rehabilitation and up-gradation to 2-lane with paved shoulder for Jind-Gohana-Sonipat Section from Design Chainage Km. 0+000 to Km. 50+505 of NH-352A in the State of Haryana on EPC Mode-Proposal for permission laying of proposed 36 inch diameter (Carbon steel) Crude oil pipeline along with communication OFC cable across NH-352A at Km. 33.350 near village Nuran Khera, Tehsil Gohana, District Sonepat by HDD method

    Upload Document File:  02-2669 dated 12.09.2022.pdf ...

    morthadmin - 09/13/2022 - 10:25 - 0 comments

  10. Six laning of Thaliparamba to Muzhapilangad section from km 137.900 to km. 170.600 of NH-17 (New NH-66) of project length 29.948 Km in the State of kerala on Hybrid Annuity Mode under Bharatmala Pariyojana-Laying of Natural Gas pipeline from Km.160+300-Km.166+400(RHS) of NH-17(66) by M/s IOAGPL

    Upload Document File:  invi1422-2022.pdf ...

    morthadmin - 09/13/2022 - 10:18 - 0 comments

Pages