Search results

  1. Laying of overhead & underground crossing of new 33KV s/STN of DHBVN at Km. 96.500 (one overhead and one crossing ) & 101.000 (two overhead and on crossing ) on old NH-65 (New NH-52) at District Hisar in the State of Haryana by HDD method

    Upload Document File:  02-2914 dated 22.09.2022.pdf ...

    morthadmin - 10/19/2022 - 16:43 - 0 comments

  2. Proposal for laying of Natural Gas Pipeline of 8 inch dia Steel pipeline along with 125mm dia MDPE Pipeline for a total length of 1.86Km from Km.454+400 (Design Chainage 449+400) to Km. 456+200 (Design Chainage 451+200) (RHS) by Open trench Methodology, and Highway crossings by HDD methodology at Km.456+100 on Nagpur to Hyderabad section of NH-44 in the State of Telangana

    Upload Document File:  1425 dated 23.08.2022.pdf ...

    morthadmin - 08/25/2022 - 10:46 - 0 comments

  3. Proposal seeking permission for laying of underground 12" diameter steel Gas Pipeline along NH-52(old NH-218), from Km 77.600 to 117.650, RHS and 5 No's of sectionalizing Valve (chamber size) 2.5m Length X 1m Width (Konnur Gaddankeri cross) between Bijapura-Hubli section in the State of Karnataka by AGP Gas private limited through open trench Method

    Upload Document File:  uplopad for public comments_compressed.pdf ...

    morthadmin - 10/15/2022 - 23:18 - 0 comments

  4. Proposal seeking ROW permission for Crossing of 600mm Dia RCC Carrier Pipe with 1200mm Dia MS Casing Pipe by Pushing Method at Km 252 +090 (LHS) to Km 252+084 (RHS) Near Vav SRPF Campus on National Highway No. 48, Surat, Gujarat

    Upload Document File:  89. IPC_D-3147 dt. 10.10.2022_SMC-Surat_Km. 252+090_PD Bharuch-171212.pdf ...

    morthadmin - 10/10/2022 - 18:01 - 0 comments

  5. PIU, Salem - Request for permission in laying of Water Pipeline along the road from Km 6/500 to Km 6/965 (LHS) by Trench method and crossing at Km 6/965 by Trench Less Method (HDD) for a total length of 465 metres in the limits of National Highways in the salem - Ulundurpet section of NH-68 by Notre Dame of Holy Cross School, Salem

    ... Pipeline along the road from Km 6/500 to Km 6/965 (LHS) by Trench method and crossing at Km 6/965 by Trench Less Method (HDD) for a total length of 465 metres in the limits of ...

    morthadmin - 03/20/2020 - 10:26 - 0 comments

  6. Proposal for permission for Water Pipeline Crossing on NH-347BG at Ch 22.200 & Ch 22.186 on new Simrol bypass village Simrol, Tehsil-Mhow, District-Indore under execution Narmada (Indore-Khandwa section) by Jack pushing method (Trenchless method) Micro Irrigation Scheme of Narmada Valley Development Authority, Division no. 21, Sanaward, District-Khargone in the State of Madhya Pradesh

    Upload Document File:  47731-10062022154131.pdf ...

    morthadmin - 10/06/2022 - 16:53 - 0 comments

  7. Proposal for laying of Optical Fiber Cable for a total length of 10.70 Km from Km.112+000 to Km. 115+600 (RHS), from Km.115+600 to Km.117+600 (LHS), from Km 117+600 to Km. 118+000 (RHS), from Km. 118+000 to Km.122+400 (RHS) along NH-44 by HDD method and Highway crossing at Km.112+000, Km.112+300, Km.113+600, Km.115+600, & Km.117+600 by HDD methodology on Hyderabad to Bangalore section of NH-44 in the State of Telangana

    Upload Document File:  1274 dated 05.8.2022.pdf ...

    morthadmin - 08/08/2022 - 15:24 - 0 comments

  8. Proposal for laying of Optical Fiber Cable for a total length of 10.85 Km from Km.147+000 to Km. 149+850 (LHS), from Km.152+100 to Km.153+200 (LHS), from Km 156+000 to Km.161+000 (LHS), and from Km.161+000 to Km. 162+600 (RHS) along NH-44 by HDD method and Highway crossing at Km.149+850, Km.152+100, Km.159+100 (2 no’s), and Km.161+000 by HDD methodology on Hyderabad to Bangalore section of NH-44 in the State of Telangana

    Upload Document File:  1271 dated 05.8.2022.pdf ...

    morthadmin - 08/08/2022 - 12:19 - 0 comments

  9. Proposal for laying of Optical Fiber Cable for a total length of 4.98 Km from Km.189+530 to Km.194+450 (LHS), along NH-44 by HDD Methodology and Highway crossings at Km.197+450 by HDD methodology on Hyderabad to Bangalore section of NH-44 in the State of Telangana

    Upload Document File:  1261 dated 05.8.2022.pdf ...

    morthadmin - 08/08/2022 - 12:14 - 0 comments

  10. Proposal for grant of access permission for T-Fiber proposal for atotal length of 30.010 kms,along Khammam to Aswaropeta section of NH-365 BB by open trench methodology,and across the road at Km.13/300, Km. 14/800, Km. 18/000, Km.22/000, Km.22/500,Km.29/220, Km.29/230, Km.34/450, Km.35/450, Km.34/550 & Km.39/80 acrossNH-365 BB of Khammam to Aswaraopet section by HDD methodology in Khammam District in the State of Telangana

    Upload Document File:  1287 dated 05.08.2022.pdf ...

    morthadmin - 08/08/2022 - 12:08 - 0 comments