Sorry, you need to enable JavaScript to visit this website.

You are here

  • Proposal for grant of permission for laying of 11 KV 300 Sq.mm3-CORE XLPE underground HT cable across the NH-53 (old NH-6) at km. 100.950 near Chistur Village on Talegaon-Amravati Section
  • Proposal for grant of permission for laying of 11 KV 300 Sqm 3-CORE XLPE underground HT cable across the NH-53 (old NH-6) at km. 67.100 near Thanegaon Village on Kondhali-Talegaon Section
  • Permission for the install/crossing of 18” OD X 0.25" WT MS LPG Pipeline of M/s IHB Private Limited across NH-47 at km 16/100 for the Total Project Length as 45.00 m, in the State of Gujarat
  • Proposal for grant of permission for laying Water Supply Utility at km. 18.100 to km. 22.300 at village Gondkhairi & Chinchabhuvan Tq. & Dist. Nagpur
  • Bhiwani-Rajasthan Border section from km.114.30 to km.184.55 of NH-709 (Extension) in the State of Haryana -NOC for access permission to the proposed retail outlet of M/s BPCL at Km. 135.098 (RHS) on Bhiwani-Loharu road (NH-709E) at village Lohani, Tehsil & District Bhiwani in the State of Haryana
  • Permission for Laying of Gas pipeline of 200 mm Diameter steel natural gas pipeline CS from km 30.145 to km 52.145 (total length 22 km ) along NH- 10 (New NH -09) in Delhi/Haryana Border to Rohtak section of Highway in Tehsil Jhajjar , district- Jhajjar in the State of Haryana by open trench method (17015 m ) and HDD method (4985 m ) wherever not feasible or as per direction of PD Rohtak
  • Proposal for NoC for laying of pipeline from Bishnugarh more to District more along and across NH-100 for Hazaribagh urban water supply scheme
  • NHAI, RO Chennai – PIU, Chennai – Request for permission to lay 33KV 1 x 630 Sq.mm XLPE UG Cable from Ambattur 110KV SS to Adayalampattu 33/11KV SS along the road from Km.19/481 to Km.22/100 for a total length of 2619m on LHS by Trenchless Method in Chennai Bypass in the limits of National Highways in the State of Tamil Nadu
  • Proposal for overhead crossing of NH-52 near village Bhadhadhar distt Sikar in the state of Rajasthan
  • Rehabilitation and upgradation to four laning of Baharagora to Singhara Section (Km. 199+200 to Km. 310+806) of NH-6 (Length 111.606 Km) in the state of Odisha under NHDP Phase-IV on EPC mode- Request permission for laying of water supply pipeline
  • Proposal to lay water pipeline Return Water Pipelines, Tailling Iron Ore Slurry Pipelines, with OFC Duct in the Utility Corridor of NH-143 from Km.273.000 Darjing to km.287.200 RHS & km.287.200 Rajamnuda to km.337.185 Barkote LHS in Biramitrapur to Barkot
  • Application of M/s Rungta Mines Ltd. for Laying of Water Pipelines, Iron Ore Slurry Pipelines, Tailing Pipe Line, Return Water Pipeline with OFC Duct & Undeground Electrical Line in the Utility Corridor of (Rimuli to Koida Section) & (Koida to Rajamunda Section) of NH-520 From Km 187+000(Near Bhadrasahi) to Km 259+453 (Rajamunda)
  • Permission for ROW along the NH-325 Siwana Kathadi km.49.5 (Pachpadra) to 71.5 km.(Pachpadra) for laying BBNL OFC cable under Bharat NET Project
  • Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited in the State of Telangana
  • Application for seeking permission / NOC for installation of mobile network site at Project Implementation unit -— 1, PIU- Gurugram: Delhi - Gurugram border, Dundahera NH-8 KM. 24* Milestone, Gurugram
  • Permission for crossing of Water pipeline of 1400 mm diameter at km 24.952 (LHS to RHS) by HDD method across NH 65. (New NH 152 ) in Ambala Kaithal section of Highway in district- Ambala in the State Haryana
  • Permission for Laying of HDPE sewer pipp,.gf 450 mm diameter from km 315.044 to km 322.544 (RHS) by open cut method along old NH 71 (Old NH 352 ) in Rohtak - Jind section of Highway in district- Jind in the State of Haryana
  • Proposal for Kandla Gorakhpur LPG Pipeline (Dumad-Bhopal section)–Request for granting permission to lay LPG pipeline along with OFC by Standard HDD method using bundle for carrier pipe and OFC across NH-47 (Godhra-MP Border section) at Km 213+230
  • Permission for construction / laying of RCC Box Type Storm Water Drain from km 112.50 to km 108.70 of size 3.3 m (widh) X 1.62 m (Depth) by open cut method along NH 152 (Old NH 65 ) in Narwana -Rajasthan/ Haryana Border section of Highway in district- Hisar in the State of Haryana
  • Proposal for ROW permission for laying OFC along from KM 390+600 to Km 397+100 (Total Length 6+900 Kms) and Across at Km 391+000 in Porbandar-Dwarka section of NH-8E(Extn.) (New NH-51) in the state of Gujarat
  • Proposal for ROW permission for crossing of 66KV/DC Overhead Transmission line across NH-47 (Ahmedabad Godhra Section of Old NH-59) between Km 25+800 and Km 25+900 for 66KV D/C 66KV Khalal-Haldarwas line
  • Proposal for ROW permission for laying 450 mm Dia Water Pipeline (with casing pipe of 900mm) across NH-48 at Km 102+575, near Village-Ranoli, & District Vadodara on Ahmedabad - Vadodara section of NH-8 in the state of Gujarat
  • Proposal for ROW permission for laying 350mm Dia Water Pipeline (with casing pipe of 600mm) across NE-1 at Km 85+000 at District Vadodara on Ahmedabad Vadodara section of NE-1 in the state of Gujarat
  • Proposal for ROW permission for laying 600mm Dia Water Pipeline (with casing pipe of 1300mm) across NH-48 at Km 94+035 near Village-Fajalpur, Taluka & DistVadodara on Ahmedabad-Vadodara section of NH-8 in the state of Gujarat
  • Permission for laying 200mm Dia Water Pipeline (with casing pipe of 400mm) across at Km 88+930 on Ahmedabad-Vadodara section of NE-1
  • Proposal for ROW permission for laying 400mm Dia Water Pipeline (with casing pipe of 900mm) across NE-1 at Km 90+510 (Revised) at District Vadodara on Ahmedabad Vadodara section of NE-1 in the state of Gujarat
  • Proposal of permission for laying 8" Dia, Steel pipe underground public utility service Natural Gas pipeline on Ahmednagar - Daund - Baramati Road SH-60 (NH160) from Kurkumbh to Daund Ch.Km,84/061 to Ch.Km,72/075. Total length 12.00 Km, in the State of Maharashtra
  • Proposal for crossing of transmission line package TL02 for Fatechgarh -II Bhadla -II 765 KV D/C line assocate with transmission system
  • Laying of OFC along NH-309A from route Chaukuri-Berinag-Gangolihat-Timta Panar. Total RoW length applied for is 79.500 km in the State of Uttarakhand
  • Proposal for grant of permission for overhead crossing of NH-11 at km. 312 to 313 on Jaisalmer -Bikaner section by PGCL for construction of Transmission line Pkg- TL02 for Fatehgarh -II of 765 KV/DC line
  • Proposal for crossing of transmission line package TL02 for Fatechgarh-II Bhadla 765 KV D/C line assocated with Transmission system associated with LTA application from Rajasthan SEZ Part -B under based competitive
  • Proposal for grant of permission for overhead crossing of 765kv D/C Fatechgarh -II to Bhadlsa -II Transmission line near Dediya in jodhpur of Nh-125 at km. 147+770 (jodhpur -Pokaran section ) in the state of Rajasthan
  • NHAI, Madurai Region - PIU, Madurai – Madurai – Kanyakumari section - Permission for laying of Airtel OFC Cable from Km.99/900 to Km.102/000 (RHS), from Km.177/200 to Km.189/400 (LHS), from Km.189/400 to Km.189/700 (RHS) and crossing at Km.177/450, Km.177/500 and Km.189/400
  • Proposal of Permission for laying Optical Fiber Cable of OFC M/s Reliance Jio Infocomm Ltd, Nagpur from Km, 02/600 to 07/000 Km, along National Highway NH-247 on Dhegaon - Kamptee - Ajani - Gumthala - Kuhi in Dahegaon - Khaperkheda - Dhanegaon Section along Km, 02/600 (Khaperkheda) to Km, 02/000 (Parshivani phata) and across Km, 7/000 total length of 4.400 Km, in Tehsil Saoner, Dist; Nagpur, in the State of Maharashtra
  • Proposal of Permission for laying of Underground Water Supply Pipeline across Ajintha - Buldhana - Khamgaon Road NH-753 E from Km, 53/200 to 53/600 on right side at Sunderkheda, Laying Permission reg. in the State of Maharashtra
  • Permission of laying for Natural Gas Pipeline along and across NH-66 at 22.50 M away from the C/C of NH-66 for the Stretch of from Kankavali Ch.406/330 to Banda Ch. 468/750 with Eight crossing location in Dist; Sindhudurg, Total length 22.50 Km, in the State of Maharashtra
  • Permission for laying GAIL's 8" and 4" dia Natural Gas Pipeline as an lnternal Part of Gas Pipeline across/along NH-33
  • Permission for laying underground OFC with HDPE protection pipe of 40 mm of M/s Gujarat fibre Grid Network Ltd along NH-848 from km 0/0 to 22/450 (total 21.78 km ) and 6 Nos of crossing across NH-848 in Taluka Pardi District Valsad in the state Of Gujarat
  • Permission for laying underground OFC with HDPE protection pipe of 40 mm of M/s Gujarat fibre Grid Network Ltd along NH-848 B from km 0/0 to 5/500 from km 25/00 to 27/000 (total 8.2 km ) and 3 Nos of crossing across NH-848 in Taluka Pardi & Umbergaon District Valsad in the state Of Gujarat
  • Application for laying of 800 mm MS Iron Ore Slurry Pipeline in Utility corridor of Chandikhole- Panikoili section of NH-16 in between km. 62+000 to km. 90+750- Proposal of M/s. Thriveni Earthmovers Pvt. Ltd
  • Permission for laying of Gas pipeline of 200 mm inner Diameter steel natural gas pipeline from km 211.6 to km 213.480 (LHS) (total length.1.88 km ) and one crossing at km 211.600 of 9l m along NH- 01 (New NH -44) in Panipat to Jalandhar section of Highway in in the State of Haryana and Punjab by open trench method as well as HDD method wherever not feasible as per open trench method or as per direction of PD Ambala and 1 Crossing at km 211.600 by HDD method
  • Permission for laying proposed Gas pipeline of 200 mm inner Diameter steel natural gas pipeline from km 0.00 to km 4.5 (RHS) (total length 4.50 km )along old NH- 65 (New NH - 152) in Ambala to Kaithal section of Highway in the State of Haryana
  • Permission for laying of underground Optical Fiber Cable on ATRU-BARAN Section of NH-752 from CH.Ms.4.110 to CH.Ms.3.766 Km & MS.3.849 Crossing 34 MT.Total Route 344+34=378 mt. in the state of Rajasthan
  • Four laning of Nagpur-Saoner-Betul1 section of NH-69 from Kms. 3.00 to kms. 59.300 in the state of Maharashtra and from kms. 137.000 to kms. 257.400 in the state of Madhya Pradesh on Design, Built, Finance, Operate and transfer (Annuity) basis:- Permission for crossing of 132 KV EHV line on NH-47
  • Permission for laying of underground Optical Fibre Cable (OFC) on NH-16 (Chilakaluripet to Nellore section) along the road from Km. 1239/250 to Km.1241/450 (RHS) and a crossing at Km. 1239/250 for a total length of 2.270 kms in the state of Andhra Pradesh
  • Permission for laying of Optical Fiber Cable (OFC) by M/s. Jio Digital Fibre Private Limited along Palamaneru to Alkuppam section of NH-4 from Km 194.800 to Km 197.360 for a total route length of 2560 Mts in the state of Andhra Pradesh
  • Permission for laying natural Gas pipeline of Various sizes of M/s Charotar Sahakari Mandali (td. along and across NH-64 in Taluka Borsad , District Annand in the state of Gujarat
  • Access Permission for laying of Underground LPG pipeline of 18” dia with protection pipe of dia 24” of M/s. IHB Private Ltd across NH 51 at Km 246.452 in Village- Virendragadh Taluka-Dharangadhra District-Surendranagarin the State of Gujarat
  • Proposal for permission of over head crossing of Patna- Aurangabad on NH-98 (New NH-139) at Naubatpur-Bhusaula Transmission line between (AP 35/0 & AP 36/0) at Chainage 6.4 in the state of Bihar
  • ROW Permission for laying optical Fiber Cable by HDD/ Manual Trench from Km. 0.000 to Km.15.500 total length 16.5 KM on NH-06 from Ainthapali Sq to Gosala Sq (RHS)
  • Propsoal for grant of permission for overhead crossing of NH-11 at Km. 304 to 305 on Jaisalmer -Bikaner section by PGCL for construction of transmission line Pkg- TL02 for Fatehgarh -II Bhadla -II of 765 KV D/C line
  • Laying of PLB duct & OFC along NH-309B from km. 05.000 (NTD Bypass, Almora to km. 81.000 (Panar Ghat) for total ROW length is 76.00 km for NFS Project in the State of Uttarakhand
  • NHAI – RO Hyderabad – PIU Nirmal–Proposal for Permission for laying of Telecom ducts/OFC cables using Open trench method from Km.615/000 to Km.627/700 (LHS), along the road for a total length of 12,700 m on Kalyan- Nirmal Section of NH-61 (Old NH-222) and using HDD at Link roads in the State of Telangana
  • Application for crossing & laying of 2 nos 160 mm dia HDPE pipe across NH-34 at Ch 52+600 Km BSF Camp from LHS to RHS, at Chainage no $3+850 Km Kalyani More from RHS to LHS, at Chainage 55,900 Km Birchi Bazar from LHS to RHS and 160 mm dia HDPE alonh NH-34 from Chainage 54.700 Km to 55.200 Km (LHS) Flipkart office for drawl of 3CX185 sq mm X LPE UG cable, drawal of overhead HT line along the NH-34 RoW from chainage 52+600 (RHS) opposite BSF Campus to chainage 53+190 (RHS) Kalyani More, along the NH-34 RoW from Chainage 54+160 Km (RHS) opposite Flipkart Office to Chainage 55+100 (RHS) opposite Birohi Bazar for 11 KV Borohi Agriculture Feeder under Deen Dayal Upadhya Gram Jyoti Yojona (DDUGJY) Sheme Nadia district, West Bengal by micro tunnelling method
  • Permission for laying of underground natural gas supply pipeline of EFIPCL along NH-34 from Barajaguli ( Km 48.553) to Ranaghat (Km 78.200)
  • Proposal for permission for laying of 18" OD underground LPG Pipeline of IOCL alongwith OFC across NH-2 at Km 583.570.
  • ROW Permission for laying of Iron ore Slurry pipelines water pipelines in the RoW of NH from Pankapal-Dakbangal Chhak to Chandikhole Ch.397.000 to ch.427.400
  • Permission for crossing of two (2) Nos. of 8 inch Petroleum Pipelines at Digboi on NH38 (from Makum towards Lekhapani),at Ch. 24.090 m and Ch 24.093 m. in the state of Assam, using Auger Boring method
  • Permission for laying of underground Optical Fibre Cable (OFC) by M/s.VindhyaTelelinks Limited on NH-16 (Tada - Nellore section) along the road from Km. 129/465 to Km. 133/950 (LHS) for a total length of 4.485 kms in the state of Andhra Pradesh
  • Proposal for the permission of construction & use of approaches/access for proposed retail outlet at LHS NH-26 (44) Ch. 237.462, Part of survey/GUT no 186/1, PH No. 123,Village- Surkhi, Tehsil & Distt.- Sagar in the state of MP
  • Proposal for grant of permission for laying Optical Fiber Cable (OFC) along with Ducts (2 ducts) on NH-52 (old NH-211) from km. 333+000 to km. 334+000 and crossing at km. 333+000 District Aurangabad
  • RO Madurai - PIU Trichy - Permission for laying underground Optical Fiber Cable along the NH in the section of Padalur - Trichy of NH-45 for a total length of 29.00 Km in the State of Tamil Nadu
  • Proposal for grant of permission for laying of Underground Telecom Cable along Kapsi starts from BSC Tower Kapsi to Bhandara Road Petrol Pump mile stone 543+300 to 541 +300. Total length applied is 2.00 Km on Nagpur-Bhandara Road, section length for ROW
  • Permission proposal for laying underground Optical fiber cable along the National Highways from Km 286/210 to 286/370 (RHS), Km 292/166 to 301/040 (RHS), Km 314/081 to 314/298 (RHS) and Km 312/992 to 314/081 (LHS) of NH-948 (Dindigul- Bangalore Road) in the state of Tamil Nadu
  • Permission for Laying Gas Pipeline from Ch. 10+000(Opp. Raghav Gym) to 15+600 (Near IGL CNG Station) along Sohna Road (NH-248A) in the State of Haryana
  • NHAI, RO, Chennai - PIU, Viluppuram — Laying of Underground OFC along the existing road from km 136/300 to Km 136/600 (RHS), Km 141/700 to Km 144/800 (RHS), Km 141/800 to Km 142/200 (LHS), Km 148/200 to Km 148/350 (LHS & RHS), Km 153/600 to Km 153/900 (RHS), Km 158/000 to Km 158/800 (RHS), and across at Km 136/600, Km 141/800, Km 148/350, Km 153/900, Km 158/800 and proposed OFC MHs @ km 136/600 (LHS & RHS), Km 141/800 (LHS & RHS). Km 142/200 (LHS), Km 148/200 (RHS), Km 148/350 (LHS & RHS), Km 153/600 (RHS), Km 153/900 (LHS & RHS), Km 158/000 (RHS), Km 158/800 (LHS & RHS) of Tindivanam to Ulundurpet Section of NH-45
  • Proposals for permission for road crossingfor laying of pipeline on NH 765 by M/s HMWS&SB at Ch. 19/6-8 in the State of Telangana
  • Proposal for overhead crossing clearance of NH-11 (old NH-15) from Jaisalmer - Bikaner at Km. 317 & 318 near village -Kanji Ki Sird (Distt.- Jodhpur) by LOOP In of 765 KV D/C Ajmer - Bikaner Transmission line at Bhadla
  • Permission for Laying of 8'',6'',4'' steel gas pipe line by M/s.Bharat Gas Resources Ltd along/across NH-50 (Bida to Humnabad section) from Naubad circle to Dhumnsur village from Km 54.370 to Km 90.200 (LHS) & from Km 90.200 to Km 96.450 (RHS) for a total length of 42.050 Kms by open trench method & two no crossings at Km 56.260 & Km 90.200 by HDD method
  • Proposal for permission to lay optical fiber cable on NH-43 Ext. from Shahnagar Km 148+000 to KM 163+850 Katni bypass along LHS total section length ROW applied for 15.85 KM in the State of Madhya Pradesh for M/s Vindhya Telelinks Ltd
  • Application for grant of ROW permission to lay OFC along NH-08 (48) for NOFN Project from Barapal Telephone Exchange to Rishabdeo Km. 342+075 to 382+040 (LHS), Total 40.00 Km. length in the state of Rajasthan
  • Permission for laying pipeline of Miraj Under Ground Drainage Scheme, Stage-II sanctioned under Nagaroothan Scheme along and across the road, Miraj-Solapur Section of NH-166 from Km 194+000 to Km 197+000
  • NHAI – RO Hyderabad – PIU Sangareddy–Proposal for Permission for laying of OFC cables using Open trench method from Km.91/000 to Km.120/500 (RHS),(proposed HDD method at link roads) along the road for a total length of 29,500m on Sangareddy – Nanded- Akola section of NH-161 in the State of Telangana
  • NHAI – RO Hyderabad – PIU Sangareddy–Proposal for Permission for laying of OFC cables using Open trench method from Km.39/980 to Km.554/000 (RHS), (proposed HDD method at link roads) along the road for a total length of 14,020m on Sangareddy – Nanded- Akola section of NH-161 in the State of Telangana
  • NHAI – RO Hyderabad – PIU Nirmal– Proposal for Permission for laying of MS crossing Pipeline across NH-44 on Hyderabad- Nagpur Section by HDD method at Km.323+605 Km.324+940, Km.325+300 and Km. 332.220 of Metpally in respect of Kaleshwaram Project in the State of Telangana
  • Proposal for overhead crossing of 132D/C Budhana-Kharad LILO line at 400 S/S, Shamli between km. 49+580 to km. 49+530 of NH-709AD
  • Permission for laying pipeline across (underground) the NH-57 (Old NH-224) for Chhatapipal Mega Lift Project under NH Division, Bolangir
  • Proposal for Permission to laying Optical Fibre Cable (OFC) along NH - 548 C on Akot - Anjangaon - Paratwada - Baltul M.P. Border section Paratwada to Kharpi (Km, 107/800 to 115/200) and Km, 122/550 to 123/060, Km, 123/060 to 126/160 (RHS), total length 11.010 Km, in the state of Maharashtra
  • Proposal of Permission for laying of U/G Water Supply Pipeline across NH 161 G on Patur - Balapur Road across Km, 06/600 Total length of 24.m in the state of Maharashtra
  • Proposal of Permission for laying underground OFC along Km, 351/500 to Km 375/975 and crossing at Km, 351/500 on Shahdal Mandla Nainpur Balaghat Gondia Amgaon Deori Korchi Kurkheda Wadsa road NH 543. in the state of Maharashtra
  • Proposal for ROW Permission for Crossing of 11 kv Under Ground cable line with 185 sq.mm X 3c XLPL power cable from km Across road Km 322+611 of NH-48 Village – Rola Taluka- Valsad in the state of Gujarat
  • Permission for laying OFC on Permission lay Optical Fiber Cable along Arni Naigaon Bandi Road on NH 161 A Km, 00/00 to 30/400 (LHS) from Km, 17/800 to Km, 27/300 RHS total section length for ROW applied 39.900 Km, in the state of Maharashtra
  • Permission for laying Water pipe line along Nagpur - Amravati Road on NH 53 (6) from Km, 3/317 to 3/504 and crossing at Km, 3/504, in the state of Maharashtra
  • Proposal of Permission for laying of Underground Water Supply Pipeline across Ajintha - Buldhana - Khamgaon road NH-753 E from Km, 57/600 to 58/050 on RHS at Bhadola
  • Crossing permission for laying 18 inch LPG pipeline along with OFC for upcoming Kandla-Gorakhpur pipeline project across National Highway-12 (Bhopal-Biaora Highways) crossing
  • Proposal for grant of permission for laying of PHED pipeline on Jaipur-Kishangarh section of NH-8 (New NH-48) at Km. 360.165, Kishangarh in the state of Rajasthan
  • Laying 18” dia. Petroleum Product Pipeline along with OFC across National Highways No.544 at between 27/2 and 24/4 km (27+376 km) in Salem – Kumarapalayam section by Horizontal directional Drilling i.e.HDD method at Pipeline crossing by M/s. Bharat Petroleum Corporation Limited, Coimbatore
  • Permission of lay underground Optical Fibre Cable (OFC) along the road from Km 66/600 to Km 71/400 (LHS) and Km 71/600 to Km 77/500 (LHS & RHS) for a total length of 16600 meters on road Karaipettai to Walajahpet (NH-4) in the state of Tamilnadu by M/s. Jio Digital Fibre Private Limited
  • Proposal for grant of access permission to Retail Outlet of M/s IOCL at Km. 49.146 on NH-98 (New NH-139) in Plot No. 3482, Khata No. 171, Village (Mauza) - Mahabalipur, Dist.-Patna in the state of Bihar
  • Request for granting permission for laying of BPCL’s underground of 72657 m length of 200mm / 63 mm / 90 mm/ dia pipeline in Anandpur Sahib, Rupnagar district by open trench method and 13 no crossing at Km 71.023 Km, Km 71.088, Km 70.267, Km 69.910, Km 31.954, Km 41.596, Km 67.603, Km 57.666, Km 45.579, Km 34.437, Km 40.328, Km 38.800 and Km 39.945 through HDD method for crossing along NH-205 in Rupnagar and Anandpur Sahibdistrict in Kurali –Kiratpur section of new NH 205 (old NH-21 )in the state of Punjab
  • Proposal for laying of OFC along NH-09 from km. 171.00 (Ghat Bridge) to km. 196.500 through existing duct and km 196.400 (Jeevan Chandra Chowk/Kumor Bend) through trenching (HDD) method. Total ROW length is 28.400 km for Army, NFS Defence Project in the state of Uttarakhand
  • NHAI – RO Hyderabad – PIU Nirmal– Construction of 220KV DC line from 400/20KVSS Niraml to the proposed 220/132 KVSS indravelli (utnoor) in Adilabad District- NH 44 crossing at Km.223+600 (in between Km. 223/600 to Km.223+800) near Ichoda village, Nirmal Mandal span between Loc. No. 45A/0 (D+6) (L&T) tower and Loc. No. 46/0 (D+6) (I&T) tower is 228 m on NH-44 of Nagpur- Hyderabad section - Stringing of line across NH-44
  • NHAI – RO Hyderabad – PIU Nirmal– Construction of 220KV DC line from 400/20KVSS Niraml to the proposed 220/132 KVSS indravelli (utnoor) in Adilabad District- NH 44 crossing at Km.282+750 near Kadthal village, Nirmal Mandal span between Loc. No. 8/0 (C+6) (TSP) tower and Loc. No. 9/0 (C+6) (L&T) tower is 182 m on NH-44 of Nagpur- Hyderabad section - Stringing of line across NH-44
  • Permission for Overhead Crossing at km. 124.593 in Bhiwani to Rajasthan Border in District Bhiwani in the State of Haryana of 220 KV D/C Line from 765 kV S/Stn PGCIL Bhiwani to 220 kV substation Bhiwani by M/s HVPNL
  • Proposal for grant of permission for laying and crossing of 11 KV S/S 3 Phase Cable on Jaipur-Kishangarh section of NH-8 (New NH-48) at Indicity, Km. 304+700, Gatoda, Jaipur by JVVNL in the state of Rajasthan
  • Regional Office - Vijayawada - Permission for laying of Optical Fiber Cable (OFC) by M/s. Jio Digital Fibre Private Limited along Palamaneru to Alkuppam section of NH-4 from. Km Kkm200.180 to Km 202.130, from 213.720 to Km 219.687 & a crossing at Km 213.720 for a total route length of 7962 Mts in the state of Andhra Pradesh
  • Permission for laying Optical Fiber Cable along NH-930 from State Border Sawargaon Murumgaon - Belgaon - Yerkad - Dhanora - Rajolui - Dudhmala - Chatgaon Km, 166/000 to 174/000 Km, total section length for ROW applied 61.00 Km, in the State of Maharashtra
  • Permission for crossing of 12 inch diameter at km 2.200 (LHS to RHS) by HDD method across NH 205-A in Kharar Banur Thepla section of Highway in village Sante Majra, District- SAS Nagar in the State of Punjab
  • Six laning of Nidgatta-Mysuru Section from Km. 74.200 to Km. 135.304 of NH-275 in the state of Karnataka (PKG-II) – Permission for laying Optical Fiber Cable (OFC) of 50mm dia which is crossing at Ex. Ch. 262.560 RHS and runs parallel for a route length of 21.26km in LHS from Mandya Railway station to DRDO station at K. Shettihalli from Ex. Km. 262.560 to Ex. Km. 258.320 = 4.24Km and design Ch. 104.400 to Ch. 121.420= 17.05Km LHS in NH-275 in the state of Karnataka
  • Laying of 800 mm dia Iron Ore Slury Pipeline & 800 mm dia water pipeline along NH-53 from Chandikhle to Paradip km.0.000 to 74.400 in the state of Odisha
  • Proposal for overhead Transmission line crossing of 400KV D/C shamli- Aligarh Transmission line crossing 400KV D/C Shamli- aligarh Transmission line between km. 51.980 to km. ​52.030 of NH-709AD
  • Proposal for overhead Transmission line crossing of 132KV S/C Kaniyan-Shamli (400) Transmission line between km. 47+430 to km. 47+380 of NH-709AD
  • Permission for laying proposed 04 Nos. Carbon Steel Pipeline crossing across NH-09 (Old NH-24) at Pakbara (Ch. 147+100), Lodhipur IFTM (Ch. 145+720), Budhanpur (Ch. 138+180) & Dhakiya (Ch. 137+550) to develop CGD Network in Moradabad District of Uttar Pradesh
  • Request for the permission for the laying of Underground gas pipeline of M/s Baghpat Green Energy pvt. ltd for 8" Dia Carbon steel pipeline NH-709B
  • Permission for road crossing and laying of water supply pipeline along NH-34 in connection with implementation of surface water based water supply project for Bongaon - Bagda - Ranaghat I/II blocks (including Bongaon Municipality) by Public Health Engineering Dte GoWB
  • Permission for crossing by Jack Push method & laying of 280 mm dia clear water using main 75 mm (OD) to 150 mm (OD) dia distribution water pipeline across the NH-34 at Km 72.420, Km 73.650, Km 74.750 & Km 75.650 near Ghatigachhi more Patuli GP office more Begopara, Charch More, Dayabari Church More along the NH-34 from Km 71.000 to Km 75.800 for Naserkuli Zone-I ground water based pipes water supply scheme within Ranaghat 2 nos block under Public Health Engineering Dte Nadia Division in Arsenic Submission scheme of Nadia District West Bengal
  • Two lane with paved shoulders configuration of Tindivanam to Krishnagiri Section of NH-66 – Issue of No Objection Certificate and Access Permission for the proposed new MS/HSD Retail Outlet on LHS of Tindivanam to Krishnagiri Section from Km 55/577 to Km 55/622 in Survey No.62/3 of Vallam Village, Gingee Taluk, Viluppuram District in NH-66 by M/s. IOCL, Trichy – Approval for 3rd Extension of Time
  • Proposal for grant of permission for laying of Optical Fiber cable along NH-547E from km 9/600 to km 10/150 & km 14/800 to km 16/150 for total length of 1.9 km in the state of Maharashtra
  • Access Permission for laying of underground Optical Fiber Cable of M/s. Reliance Jio Infocom Limited along and across NH-251 from Km 11/000 to Km 18/500 (LHS) and Km 18/500 to Km 19/00(RHS) (Total length= 8 Km) & 1 crossing at Km 18/500 in the State of Gujarat
  • NHAI, RO Jammu-PIU Jammu- PERMISSION FOR INSTALLATION OF TELECOM TOWER AT KM. 22+700 (LHS) AS PER REQUIREMENT FOR LEASE LINE IN THE PREMISES OF BANN TOLL PLAZA
  • Permission for laying proposed 12" Steel Gas Pipeline along/across NH-27 at Km. 1074.800 to 1075.100 & crossing at Km. 1075.100 of Kota-Baran-Shivpuri section of NH-27 to develop City Gas Distribution Network in Kota city
  • Proposal for NOC for overhead line crossing of 220 KV S/C Gonda - Bahraich Transmission line (400KV) at Km. 312.943 in the section of Shravasti - Balrampur on NH-730, District - Balrampur in the State of Uttar Pradesh
  • Proposal for NOC for overhead line crossing of 132 KV S/C Gonda - Bahraich Transmission line (220KV) at Km. 312.483 in the section of Shravasti - Balrampur on NH-730, District - Balrampur in the State of Uttar Pradesh
  • PIU – Coimbatore – Implementation of ‘Bharatmala Pariyojana’ Phase – I –“Thoppur – Mettur – Bhavani – Erode – NH-544 – stretch assigned to Tamil Nadu NH Wing – Updation of Detailed Project Report (DPR) prepared by Tamil Nadu Road Sector Project (TNRSP) for NHAI – Salem (NH) Circle – Gobichettipalayam (NH) Division – Proposal seeking permission for laying of underground Agricultural 400mm dia pipeline from Km 61/630 to Km 62/197 (RHS) and across the road at Km 62/197 on NH-544H
  • PIU–Coimbatore – Proposal seeking permission for underground water pipeline crossing at Km 19/875 (2200mm dia MS pipe) & Km 25/714 (1600mm dia MS pipe) on NH-544H - by PWD, Water Resources Department, Sarabanga Basin Division, Salem
  • Request for the permission for crossing of 400 kv Shamli- Aligarh line transmission DC between Dadri ( ch. 90.500) & Khatauli (ch. 90.600) on along NH-58 in distt- MUzaffarnagar
  • Proposal for permission for overhead crossing of 400 KV D/C Shamli- Aligarh Transmission line at km. 137.526 on NH_93 between Pilauna and Raipur
  • Proposal for grant of permission for laying Pipeline in Jalswaraj Tappa-2 Wajegaon Water Supply Yojana Tq. Nanded at Ch. Km. 207.70 to ch. Km. 208.00 of total length 300m. And one crossing at ch. Km. 208.000 across NH-361 of Village Wajegaon, Tq. & Dist.
  • Permission for the install/crossing of 220 KVD/C overhead Transmission line of M/s Sitac Kabini Renewal Private Limited (M/s SKRPL) across NH-745K at Km 15/00 to km 16/00 for the total project as 60.00m in the state of Gujrat.
  • Permission for the install/crossing of 220 KVD/C overhead Transmission line of M/s Sitac Kabini Renewal Private Limited (M/s SKRPL) across NH-745K at Km 15.740 between km 15/00 to km 16/00 for the total project as 60.00m in the state of Gujrat.
  • Four Laning of Gaya Hisua-Rajgir-Nalanda-Biharsharif Section(Km. 00+000 to Km.92+935) of NH-82 in the satat of Bihar under JICA-ODA Loan Assistant. Reg. – NOC for laying/crossing of water supply pipeline at Ch. 4+296 (length 44m) of NH-82 near Ghughri Tand Tempo Stand in Gaya.
  • Four Laning of Gaya Hisua-Rajgir-Nalanda-Biharsharif Section(Km. 00+000 to Km.92+935) of NH-82 in the satat of Bihar under JICA-ODA Loan Assistant. Reg. – NOC for laying/crossing of water supply pipeline at Ch. 4+296 (length 44m) of NH-82 near Ghughri Tand Tempo Stand in Gaya
  • Permission for construction of RCC box for laying 2100 mm dia MS E-250 pipeline crossing near Kanaganakoppa village at Km 382+948 of NH-234 (Madhugiri-Chikballapur-Mulbagal section) by BOX pushing Technique by Visvesvaraya Jala Nigam Ltd(VJNL) Yethinahole Project Division No.04 Madugiri
  • Proposal for permission for overhead crossing of 765 KV D/C Lakadia-Vadodara Transmission line across NH-48 at Km. 98.850 near Village Padamala of Taluka & District Vadodara on Ahmedabad-Vadodara of NH-48
  • Proposal for laying underground Optic Fiber Cable along the National Highways from Km 11/680 to 13/150(LHS) for a length of about 1470m and across the road at Km 11/680 of NH-81(Coimbatore-Karur-Tiruchirapalli-Chidambaram Road) in the state of Tamil Nadu
  • Proposal seeking permission for laying of OFC cable along NH-548B from Bijapur Ring Road Km 0.00 to Honwad Km 30.00 on RHS for a total length of 30.00 Kms through HDD method by M/s Jio Digital Fibre Pvt Ltd
  • Laying of 500 mm dia Slurry Pipeline & 400 mm dia. Return Water Pipeline from 188.600 Km (Bhadrasahi) to 209.400 Km (Koira) in the RoW of utility corridor of NH-520 in Rimuli-Rajamunda section from proposed 34 MTPA Iron Ore Beneficiation Plant located at Villages-Bhanjapalli & Teherei, under Keira Tahasil in Sundergarh district, Odisha to Chaliyama Steel Plant located at village . Chaliyama in district West Singhabhum, Jharkhand of M/s Rungta Mines Limited
  • Access Permission for laying of Underground water Pipeline of dia 2681 mm with protection pipe of dia 1826 mm of dia 3240mm of M/s. Narmada Water Resource, Water Supply & Kalpsar Dept across NH-927D at Km 55/800 in Village-Makrani Sansara, TalukaKalavad, District-Jamnagar in the State of Gujarat
  • Proposal for ROW permission for laying of OFC along and across of NH 47(old NH 59) for Bharatnet Phase II on Ahmedabad Godhra road between Km.5+300 to 5+400, & Km.17+130 to 19+100 and crossing at Km.5+300 and Km.18+700
  • Proposal for NOC permission for laying 90 mm dia Gas pipeline along NH 330(96) Prayagraj - Faizabad road from Km 150.126 to 152. 306 IOCL-Adani Gas Pvt. Limited
  • Proposal seeking permission for laying of OFC cable along NH-373 from Km 569.200 to Km 581.700 on RHS for a total length of 12.50 Kms through HDD method by M/s. Railtel Corporation of India Ltd
  • Permission for laying underground OFC with HDPE protection pipe of 40 mm of M/s Gujarat Fibre Grid Network Ltd along NH-56 from km 678/500 to 686/500 (LHS) & from km 686/500 to 692/500 (RHS) and from km 708/00 to km 716/00 (LHS) and 5 Nos of crossings in the state of Gujarat
  • Access Permission for laying of Underground water Pipeline of dia 2681 mm with protection pipe of dia 1826 mm of dia 3240mm of M/s. Narmada Water Resource, Water Supply & Kalpsar Dept across NH-927D at Km 55/800 in Village-Makrani Sansara, TalukaKalavad, District-Jamnagar in the State of Gujarat
  • Permission for laying 4” dia steel pipeline to set up PNG Distribution network in Jalalpur Taluka & surroundimg area of Navsari District for laying pipeline across NH64 (old NH-228) @ km 369/300 in the state of Gujarat
  • Proposal for obtaining permission for laying OFC & HDPC /PLB duct (40 mm) , under national Optical fibre Network by Railtel Corporation of India & BBNL on NH-56 along and across Bodeli Naswadi Section from km 421/300 to 439/120 in the state of Gujarat
  • Permission for laying bundle of 508 mm OD API X-70 Grade LPG carrier pipe and OFC encased in 89 mm OD conduit pipe of ASTM 106 grade B by standard HDD method across NH-56at km 274/443 near village Debdha , Taluka Garbada District Dahod in the state of Gujarat
  • Six laning of Belgaum – Dharwad Section of NH-4 from Km.433.000 to Km.515.000 (Length – 79.36 Km) in the State of Karnataka to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase – V (Package No. NHDP –V/MC-II/19)– Granting of permission to lay OFC along NH-48 (Old NH-4)
  • Clearance for 33 KV underground cable crossing the National Highway at Km. 28/700 on NH-33 in Hazaribagh-Barhi route
  • Permission for laying proposed 125 mm dia PE gas pipeline along/across NH-56 (Rajpipla-Netrang) & (Rajpipla -Devaliya) to set up city Gas Distribution Network in Narmada GA in the state of Gujarat
  • Application for permission of 33KV Electric Line Crossing through HDD mode at NH-27, Ch. 1276.386 (Corrected Ch. 1275+375, Approx), LHS, Part of Survey no. 225/1 & 224, Ph. No. Village-Kulwara, Tehsil-Kolaras & District-Shivpuri, State-MP
  • Permission for laying proposed 125 mmm dia PE natural Gas pipeline crossing of NH-64 (old NH-228) to supply PNG gas to industrial customer on kheda- Dholka road in the Taluks and District Kheda in the state of Gujarat
  • Proposar for permission to ray optical fiber cable on NH-752c from chitoda kms. 31+000 to Arandiya applied kms. 64+500 on Jirapur-pahore-sujarpur-Ashta Road. Total section length Row for 33.500 kms in the State of Madhya pradesh
  • Proposal for permission to ray optical fiber cable on NH-752c from chitoda kms. 31+000 to Arandiya kms, 64+500 on Jirapur-pahore-Sujalpur_Ashta Road, Total section length Row applied for 33.500 kms in the state of Madhya Pradesh
  • Permission for laying of 250 mm dia & 90mm dia Water supply pipeline along Morshi - Chandurbazar - Achalpur road NH 353 J near Village Rddapur, from Ch 24/470 to 24/700 RHS, 24/561 to 24/926 LHS, 24/726 to 25/490 RHS with 90 mm dia Pipe and Ch. 24/550 and 24/726 LHS 24/726 to 24/926 RHS with 250 mm dia pipe Length along the road is 1735 mtrs with 2 crossing with 3 pipes, in the State of Maharashtra
  • Permission for laying Optical Fiber Cable along NH 930 D Rajura to Lakkadkot road km, 26/00 to 50/00 total section length for ROW applied 24.00 Km, in the state of Maharashtra
  • Request for grant of Permission for laying 24" Dia, Steel pipeline carryring Natural Gas along Navhra - Namgaon - Kashti - Lipangaon - Shrigonda - Jamkhed Road NH 548 D to Develop city Gas Distribution Network under Ahmednagar Dist; Total Length 7800 mt in the State of Maharashtra
  • Permission for laying OFC along NH 543 from Purada to Korchi road Km, 376/000 to 376/650 and Km, 380/850 to 398/850 (Both Side) total section Length for ROW applied 37.00 km, in the State of Maharashtra
  • Permission for laying of underground pipeline across the NH-63 at various chainages from Km.288.00, Km.290.80, Km.291.80, Km.292.80, Km.297.80, Km.300.60, Km.300.80 on Bhopalpatnam – Jagdalpur road at Block-Bhaopalpatnam, Distt-Bijapur State-Chhattisgarh
  • Proposal for permission to lay optical fiber cable on NH-752C from Chitoda Kms 31+000 to Arandiya Kms 64+500 on Jirapur-Pachore-Sujalpur-Ashta Road total section ROW applied for 33.500 Kms in the State of Madhya Pradesh
  • ROW Permission for laying OFC from km 137/300 (Dekargaon) to km 141/800 (Goroimari) of NH-15 (OLD NH-52) in Soinuitpur District under PWD Nagaon by M/S Rail Tel Corporation of India Ltd
  • NHAI-PIU-Kolhapur - Four laning of Sangli-Solapur (Package-!, Sangli-Borgaon) section of NH-166 from existing km 182.195 (Design chainage km 182.556) to existing km 219,956 (Design Chainage Km 224.000) of length 41.444 Km in the state of Maharashtra on Hybrid Annuity Mode - Submission of proposal for grant of permission for laying of MJP pipelines along NH-166 in Arjunwad Road to Tasgaon-Mhaisal Road (Km 191+400 to 198+000 of NH-166)
  • Proposal for permission to lay optical fiber cable on NH-752C from Jirapur kms 4+400 to Pachore kms 60+400 & Pachore kms 2+700 to Talen kms 19+000 on Jirapur-Pachore-Sujalpur-Ashta Road. Total section length ROW applied for 72+300 kms in the State of Madhya Pradesh
  • Permission for laying of U.P jal nigam 100mm dia pipeline (MS pipe) across NH-34 (old NH-86) across ch. 2.146 (RHS) to 2.160 (LHS) approximate lenght 50.40 at Naubasta (near to existing canal) in the state of UP
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of OFC along NH-765 on Hyderabad- Dindi Section from Ch. 56/200 to Km.59/800 (RHS) through Open trench method and Crossing at Km.58/000 through HDD method in the State of Telangana
  • Issuance of NOC for the overhead crossing of 132 KV DC Transmission Line from Biswanath Chariali to Itanagar at Km 211.430 in between AP 2/0 & AP 3/0
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of Mission Bhagiratha Pipeline along National Highway from Km.61+453 to Km.65+730 (LHS), and from Km.66+010 to Km.66+512 (LHS) for a total length of 4779 m through Open trench laying (except HDD at 4 cross roads at Km.66+010, Km.63+860, Km.62+600 and km.61+980 ) on Hyderabad -Bangalore section of NH-44 in the State of Telangana
  • NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of Mission Bhagiratha Pipeline along National Highway from Km.67+100 to Km.66+000 (RHS), and from Km.66+000 to Km.65+730 (LHS) through Open trench laying and HDD crossing at Km. 66+0000 across the National Highway on Hyderabad -Bangalore section of NH-44 in the State of Telangana
  • Request to host the Permission for Laying of OFC along NH-40 from Km.6.200 to Km.36.650 on RHS, from Km.6.200 to 32.650 total length at different locations of RoW applied for 26.630 Kms (26630 mtrs) in Kadapa
  • Invitation of public comment for Permission for laying proposed 8" Steel Gas Pipeline along/across NH-27 (Kota-Baran-Shivpuri) to develop City Gas Distribution Netwprk in Baran city from Ch. 1142+971 to 1143+323 and its surrounding areas en-route NH under
  • Proposal seeking permission for laying of OFC cable along NH-73 (Old NH-234) from Halebeedu Km 164.00 to Kurubarabudihal Km 171.100 on LHS for a total length of 7.10 Kms through HDD method by M/s. Telesonic Networks Ltd
  • Proposal seeking permission for laying of OFC cable along NH-369 (Old NH-13) from Km 425/800 to Km 442/800 (Chitradurga JMS to Chitrahalli village) on RHS for a total length of 17.00 Kms through HDD method by M/. Telesonic Networks Ltd
  • Proposal seeking permission for laying of OFC cable along NH-766C from Yadthare Km 0.00 to Halkal cross Km 21.400 on RHS for a total length of 21.40 Kms through HDD method by M/s Telesonic Networks Ltd
  • Proposal seeking permission for laying of OFC cable along NH-69 (Old NH-234) from Panchanahalli Hand Post Km 221.500 to Huliyar Canara Bank Km 243.200 on LHS for a total length of 21.70 Kms through HDD by M/s Telesonic Networks Ltd
  • Issuance of NOC for the Overhead Crossing of 132 KV DC Transmission Line from Biswanath Chariali to Itanagar at Km 211.430 in between AP 2/0 & AP 3/0
  • Permission for laying of Optical Fibre Cable by conventional trenching & ducting Yavaluj Bus Stop to Asurle road point along NH-166 at Km 118.200 to Km 119.535
  • Permission for Laying of OFC along NH-40 from Km.6.200 to Km.36.650 on RHS, from Km.6.200 to 32.650 total length at different locations of RoW applied for 26.630 Kms (26630 mtrs) in Kadapa -Kurnool Section of NH-40
  • Permission for laying natural Gas Pipeline of Various sizes of M/s Charotar Sahakari Mandali Limited along and across NH-64 in Taluka Borsad,District Annand in the state of Gujarat