Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
5701 Gujarat Proposal for seeking ROW permission for laying OFC along NH-27 Jetpur-Rajkot section from Km 132+800 to Km 133+800, Km 141+700 to Km 142+700, Km 144+100 to Km 146+000, Km 172+850 to Km 173+100 & Km 179+600 to Km 180+100 and 10 Nos. of Crossing at Km 119+100, Km 125+800, Km 141+700,Km 144+100, Km 145+800, Km 150+000, Km 173+100, Km 176+100, Km 177+550 & Km 179+600 for BharatNet Phase-Il Project by M/s. Gujarat Fibre Grid Network Limited, in the state of Gujarat. (1.31 Mb application-pdf)
02-11-2020
5702 Gujarat Six Laning of Samakhiali-Gandhidham (306+000 to 362+160) section of NH-8A (Total length Km.56.16) in the state of Gujarat to be executed as BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) under NHDP Phase-V (1.20 Mb application-pdf)
02-11-2020
5703 Telangana NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for erection of 33KV overhead line over M+6 towers from IDA Mankhal to Kothur gate on srisailam NHAI for extending of 33 KV power supply to M/s Amazon Data Service center at Pharmacity (Meerkhanpet Village) – Km. 23+000 to Km.31+320 along the road and crossing at Km.23/000 and Km.31/320 on NH-765 (25.79 Mb application-pdf)
02-11-2020
5704 Gujarat Four/Six Laning of Km 198.00 to Km 263.00, Bharuch to Surat Section of NH-8 in Gujarat on BOT Basis, Package BOT-2 (1.25 Mb application-pdf)
31-10-2020
5705 Andhra Pradesh Permission for laying Optical Fibre Cable (OFC) along NH-42 from KM 240/700 to 248/700 of Madanapalli Bypass road for a total length of 8000 m in Chittoor District by M/s Reliance Jio Infocamm Limited in the state of Andhra Pradesh (125.35 Kb application-pdf)
29-10-2020
5706 Rajasthan Permission for laying 6" Carbon Steel & MDPE 125 mm Underground Natural Gas Pipeline from Purani Chhawani turning Point NH Ch. 184.710 Km. at LHS along NH-11B and cross at Ch. 182.650 & 184.705 at Dholpur in the state of Rajasthan (362.58 Kb application-pdf)
29-10-2020
5707 Uttar Pradesh Proposal for NOC permission for laying of 12" Dia carbom steel pipeline from Machhariya Ring road to Kalyanpur km.158.400 to km.160.540 from Kalyanpur village towrds Dilari on NH-24 (2.22 Mb application-pdf)
29-10-2020
5708 Uttar Pradesh Proposal for NOC permission for laying of TGPL Underground Gas Pipe of 8" Dia (200mm) Carbon Steel Pipeline from km.168.300 to km.174.900 (Dilari to Munda Pande) towards (Lucknow Road) and Crossing at two locations at ch. 166.200 & ch. 144.300 under NH-9 (Old NH-24) Laxmipur Katai Near Gopalji Filling Stating and Dhanupura Village Near CNG Station on NH-9 (Old NH-24) in the State of Uttar Pradesh (2.01 Mb application-pdf)
29-10-2020
5709 Telangana NHAI – RO Hyderabad – PIU Nirmal– Construction of 132 KV DC line from proposed 220/132 KV SS Indravelly (Utnoor) to the existing 132/33KV SS Adilabad in Adilabad district- National Highway NH-44 crossing near Gudihatnoor (V) and (M) span between loc.No.4C+6(TSP) and Loc.5 C+6 (TSP) in 238 m- Stringing of line across NH-44 (12.85 Mb application-pdf)
29-10-2020
5710 Telangana NHAI – RO Hyderabad – PIU Hyderabad– Proposal for laying of OFC Cables of Telesonic Networks Limited from Km.23+680 to Km.24+550 (LHS), & Km.29+700 to Km.30.140 (LHS), Km.31+500 to Km.32+250(LHS) and across the road between Km.24+500-600, Km.30+100-200, Km.31+500-600 & km.39+200-300 for a total length of 2250m on Hyderabad- Bangalore section of NH-44 in the State of Telangana (5.09 Mb application-pdf)
29-10-2020

Pages