Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
5671 Madhya Pradesh Balance work for 4 laning of Bhopal-Biaora section of NH-12 from Lalghati Square Km 315.725 to biaora Km 421.325 in the state of MP on EPC mode-Permission to lay underground optical fiber cable from Bhopal 315.725 to Kurawar (4.79 Mb application-pdf)
13-11-2020
5672 Madhya Pradesh Balance work for 4 laning of Bhopal-Biaora section of NH-12 from Lalghati Square Km 315.725 to biaora Km 421.325 in the state of MP on EPC mode-Permission to lay underground optical fiber cable from Kurawar 365.000 to Biaora 421.325 (4.80 Mb application-pdf)
13-11-2020
5673 Karnataka Permission for canal crossing near Yaragoppa-Hoolgeri junction at Km 90.525 of NH-218 Bijapur -Hubli section by Krishna Bhagya Jala Nigam Ltd. through open trench method (683.62 Kb application-pdf)
13-11-2020
5674 Uttar Pradesh Approval for Overhead Crossing at Km. 85.730 Of 220 KV D/C Greater Noida (765 KV)-IITGNL (220 KV) Transmission line over Eastern Peripheral Expressway (846.16 Kb application-pdf)
12-11-2020
5675 Andhra Pradesh (R&B) NH Circle, Anantpur- (R&B) NH Division, Anantpur - Permission for laying HPCL Gas Pipeline 14" dia underground LPG pipeline along with 40mm dia HDPE duct for OFC crossing at Km 424/670 of NH 67 for Hassan to Cherlapalli LPG pipeline project (12.51 Mb application-pdf)
12-11-2020
5676 Andhra Pradesh NH Circle, ATP- (R&B) NH Division, ATP - Permission for laying HPCL Gas Pipeline 14" dia underground LPG pipeline along with 40mm dia HDPE duct for OFC crossing at Km 55/935 of NH 42 for Hassan to Cherlapalli LPG pipeline project (2.36 Mb application-pdf)
12-11-2020
5677 Karnataka Proposal seeking permission for laying of OFC cable from Km 0.0 to Km 22.00, Km 22.00 to km 67.00 & km 67.00 to 106 for a total length of 106.00 Kms on RHS of NH - 52 (Old NH 63) through HDD method by M/s. Jio Digital Fibre Pvt. Ltd (1.88 Mb application-pdf)
12-11-2020
5678 Chhattisgarh Permission for lay Optical Fiber Cable along Bhopalpatnam to CG/Telangana, Ms: Kms 0.00 to Ms: Kms 36.00 on NH-163, total section length ROW applied for 36.00 Kms in the State- Chhattisgarh (5.36 Mb application-pdf)
12-11-2020
5679 Gujarat Proposal for laying HDPE/PLB duct (40 mm) and OFC laying in crossing of NH-8E (along NH-8E from Km 107+300 to Km 107+640 (Parallel Length=340m and 1 Crossing at Km 107+300) Taluka-Mahuva, District-Bhavnagar in the state of Gujarat (304.89 Kb application-pdf)
12-11-2020
5680 Assam Regarding proposal for Final NOC for construction of new retail outlet (Fuel Station OF M/s Nayara Energy Ltd.) located on the plot of land abutting on the left hand side boundary of NH-61 towards increasing chainage in Km.243.063 T Haluating, District Sivasagar ,Assam,Pin-785681 (2.28 Mb application-pdf)
12-11-2020

Pages