Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
5231 Uttarakhand Laying of PLB duct & OFC along NH-309B from km. 05.000 (NTD Bypass, Almora to km. 81.000 (Panar Ghat) for total ROW length is 76.00 km for NFS Project in the State of Uttarakhand (1.48 Mb application-pdf)
10-03-2021
5232 Assam Permission for crossing of two (2) Nos. of 8 inch Petroleum Pipelines at Digboi on NH38 (from Makum towards Lekhapani),at Ch. 24.090 m and Ch 24.093 m. in the state of Assam, using Auger Boring method (748.78 Kb application-pdf)
10-03-2021
5233 Tamil Nadu Permission proposal for laying underground Optical fiber cable along the National Highways from Km 286/210 to 286/370 (RHS), Km 292/166 to 301/040 (RHS), Km 314/081 to 314/298 (RHS) and Km 312/992 to 314/081 (LHS) of NH-948 (Dindigul- Bangalore Road) in the state of Tamil Nadu (1.39 Mb application-pdf)
10-03-2021
5234 Odisha ROW Permission for laying optical Fiber Cable by HDD/ Manual Trench from Km. 0.000 to Km.15.500 total length 16.5 KM on NH-06 from Ainthapali Sq to Gosala Sq (RHS) (1.25 Mb application-pdf)
09-03-2021
5235 Telangana NHAI – RO Hyderabad – PIU Nirmal–Proposal for Permission for laying of Telecom ducts/OFC cables using Open trench method from Km.615/000 to Km.627/700 (LHS), along the road for a total length of 12,700 m on Kalyan- Nirmal Section of NH-61 (Old NH-222) and using HDD at Link roads in the State of Telangana (2.57 Mb application-pdf)
09-03-2021
5236 West Bengal Application for crossing & laying of 2 nos 160 mm dia HDPE pipe across NH-34 at Ch 52+600 Km BSF Camp from LHS to RHS, at Chainage no $3+850 Km Kalyani More from RHS to LHS, at Chainage 55,900 Km Birchi Bazar from LHS to RHS and 160 mm dia HDPE alonh NH-34 from Chainage 54.700 Km to 55.200 Km (LHS) Flipkart office for drawl of 3CX185 sq mm X LPE UG cable, drawal of overhead HT line along the NH-34 RoW from chainage 52+600 (RHS) opposite BSF Campus to chainage 53+190 (RHS) Kalyani More, along the NH-34 RoW from Chainage 54+160 Km (RHS) opposite Flipkart Office to Chainage 55+100 (RHS) opposite Birohi Bazar for 11 KV Borohi Agriculture Feeder under Deen Dayal Upadhya Gram Jyoti Yojona (DDUGJY) Sheme Nadia district, West Bengal by micro tunnelling method (988.51 Kb application-pdf)
09-03-2021
5237 West Bengal Permission for laying of underground natural gas supply pipeline of EFIPCL along NH-34 from Barajaguli ( Km 48.553) to Ranaghat (Km 78.200) (818.32 Kb application-pdf)
09-03-2021
5238 West Bengal Proposal for permission for laying of 18" OD underground LPG Pipeline of IOCL alongwith OFC across NH-2 at Km 583.570. (864.61 Kb application-pdf)
09-03-2021
5239 Odisha ROW Permission for laying of Iron ore Slurry pipelines water pipelines in the RoW of NH from Pankapal-Dakbangal Chhak to Chandikhole Ch.397.000 to ch.427.400 (1.38 Mb application-pdf)
09-03-2021
5240 Rajasthan Permission for laying of underground Optical Fiber Cable on ATRU-BARAN Section of NH-752 from CH.Ms.4.110 to CH.Ms.3.766 Km & MS.3.849 Crossing 34 MT.Total Route 344+34=378 mt. in the state of Rajasthan (553.09 Kb application-pdf)
09-03-2021

Pages