Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
5191 Gujarat IPC-D-1120 dt. 17.07.2020_Guj.Gas Ltd_Gas Pipeline laying from Km 310+80 to Km 312+592 (118.68 Kb application-pdf)
17-07-2020
5192 Punjab 4-laning of Rohtak to Hisar section of NH-10 (from km 87.000 to km 170.000) including connecting link from Km 87.000 (NH-10) to Km 348.000 (NH-71) to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III in the state of Haryana- NOC for access to Retail Outlet of M/s IOCL at km 172.620 (LHS) on NH -9 (Old NH-10) at village Satrod Khas Tehsil & Distt. Hisar - Approval of EOT and Final Permissions –reg (2.87 Mb application-pdf)
17-07-2020
5193 Gujarat Proposal for seeking permission for laying 6" dia Steel Pipeline to set up a Piped Natural Gas distribution network in Chikhli Taluka & surrounding area of Navsari District from Krn 310.800 to Krn 312.592 of NH-48 by Mls. Gujarat Gas Limited in the state of Gujarat. (127.58 Kb application-pdf)
17-07-2020
5194 Gujarat Proposal for seeking permission for laying 6" dia Steel Pipeline to set up a Piped Natural Gas distribution network in Chikhli Taluka & surrounding area of Navsari District from Krn 310.800 to Krn 312.592 of NH-48 by Mls. Gujarat Gas Limited in the state of Gujarat. (127.58 Kb application-pdf)
17-07-2020
5195 Tamil Nadu HAI - RO Madurai – Highway Adminsitration - Crossing of 33KV Overhead Power Supply line at Km 244/230 on Madurai Tuticorin section of NH38(Old No 45B) - Invitation of public comments – Reg (415.73 Kb application-pdf)
16-07-2020
5196 Gujarat Six-laning of Ahmedabad-Vadodara (Km 6.400 to Km 108.700) section of NH-8 and improvement of Ahmedabad-Vadodara Expressway from KM 0.000 to Km 93.302 in the state of Gujarat under NHDP Phase-V on DBFOT Pattern. (113.31 Kb application-pdf)
15-07-2020
5197 Punjab Four laining of HIsar to Dabwali Section of NH-10 from Km.170.00 to 227.00 with paved shoulder in the State of Haryana on EPC Mode (Pkg.-I): Permission for laying of water supply system on NH-9 (Old NH-10) at Ch.170.200 to Ch.172+600 (LHS) at Hisar in the State of Haryana. (934.25 Kb application-pdf)
15-07-2020
5198 Gujarat Projects comprising of 9 National Highway stretches (Bundle-1) on Toll Operate Transfer Mode - Bamanbore to Garamore (Km 182.600 to Km 254.537) section of NH-8A in the state of Gujarat. (131.98 Kb application-pdf)
14-07-2020
5199 Gujarat Two-lane with paved shoulder of Padhi-Dahod (Km 180.000 to Km 267.000) section of NH-113 in the state of RajasthanlGujarat (Length 85.588 Kms) (126.17 Kb application-pdf)
14-07-2020
5200 Kerala Proposal regarding permission for laying KWA pipe for distribution network on NH 183(Kollam-Theni road) under KIIFB 2017-18-Karimbukayam Drinking water extension project in between Km.137/970 & 144/700 in Kottayam District under NH Division, Muvattupuzha in the State of Kerala. (150.56 Kb application-pdf)
14-07-2020

Pages