Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2591 Assam Construction of proposed Fuel Station (Retail Outlet), on a plot of land abutting on the right hand side boundary of NH-37 towards increasing chainage in Km. 1022.420 at village; Banglipara, Mouza – Bhabanipur, District-Barpeta, Assam (1.07 Mb application-pdf)
22-12-2022
2592 Madhya Pradesh Proposal for permission for crossing of 2 nos Transmission Electrical line 132KV overhead of National Highways, Narmada Valley Development Authority Division No.08, Sanawad at proposed 4 laning of Raghavgarh to Nanasa section of NH-47, design Ch. 36+602, Ch. 35+545 at Village-Bhamori, Tehsil- Bagli, District-Dewas in the State of Madhya Pradesh (800.73 Kb application-pdf)
22-12-2022
2593 Madhya Pradesh Application for the permission to lay off 12” dia Natural Gas Pipeline along with 40mm OFC Parallel to NH-44 at Km. 550+057 to 549+519 Village-Madai, Tehsil-Lakhnadon, District- Seoni in the State of Madhya Pradesh.Application for the permission to lay off 12” dia Natural Gas Pipeline along with 40mm OFC Parallel to NH-44 at Km. 569+885 to 568+150 Village-Dungariya, Tehsil-Chhapara, District- Seoni in the State of Madhya Pradesh. (114.11 Kb application-pdf)
21-12-2022
2594 Assam Approval of installation of a new Fuel Station (Retail Outlet) on a plot of land abutting on Left hand side boundary of NH-37(old)/27(new) towards increasing chainage in Km. 226.905 at village-Kholapather, Mouza-Uttar Khula, dag No. 348, District-Marigaon, State-Assam (1.12 Mb application-pdf)
21-12-2022
2595 Karnataka Proposal seeking permission to laying of water pipeline for drinking water scheme along NH 275 from Kabaka Km 10.200 to 10.850 on LHS (650 m), from Km 10.850 to Km 11.100 on LHS (250 m), from Km 11.100 to Km 11.400 on LHS (300 m), from 11.400 to Km. 12.000 (600 m) on LHS, Km 12.000 to Km 12.400 (400 m) on LHS, from Km 12.400 to Km 13.600 (1200 m) on LHS, Km 13.600 to Km 14.150 on LHS (550 m), from Km 14.150 to Km 16.200 on LHS (2050 m), and from Km 16.200 to 16.450 on RHS (250 m), from Km 16.450 to Km 16.850 on RHS (400 m), from Km 16.850 to Km 18.100 on RHS (1250 m) for a total length of 7.90 m through open trench method and three road crossing at Km 11.400, Km 14.100 & Km 16.850 through HDD method in the State of Karnataka by Municipal Commissioner, Puttur City Municipal Council (2.74 Mb application-pdf)
20-12-2022
2596 Haryana Four laning of Rohna-Hassangarh-Jhajjar section of NH-334B (Pkg-II) from Km.44.800 to km.80.250 (Total Length 35.450 Km.) on HAM basis in the State of Haryana-Proposal for laying of underground electric cable line of 33KV for crossing NH-334B at km. 61+028 for UHBVN Rohtak in District Jhajjar in the State of Haryana by HDD method (410.15 Kb application-pdf)
20-12-2022
2597 Punjab Proposal for grant of Permission for laying of Sewerage Pipe Line from Km. 450.204 to Km. 451.117 (RHS) and Km. 450.211 to Km. 450.321 (LHS) along old NH-01 (New NH-03), at Amritsar Bypass in the State of Punjab by HDD method (764.65 Kb application-pdf)
20-12-2022
2598 Rajasthan Proposal for grant of permission for laying 8”/4” NB MS Gas Pipeline along/across NH-79 (New NH-48) from Km. 170.250 to 182.650 (LHS) (Ajmer to Bhilwara road), total 12.580 Km. length to develop City Gas Distribution Network in Bhilwara City and its surrounding area under Bhilwara & Bundi GA by M/s. Adani Gas Ltd. (AGL) (4.37 Mb application-pdf)
20-12-2022
2599 Rajasthan Proposal for grant of permission for laying proposed 8” dia Steel Gas Pipeline encased in 14” dia casing underground crossing across NH-25 (Sangariya Bypass Jodhpur Ring Road) by HDD method for 60 mtr at Ch. 26.172 to develop City Gas Distribution Network in Jodhpur City and its surrounding areas en-route NH under Jodhpur Geographical area by M/s. AGP CGD India Pvt. Ltd. (5.18 Mb application-pdf)
20-12-2022
2600 Haryana Proposal for grant of permission for 220 KV overhead transmission line crossing NH-8 (New NH-48) of Delhi-Jaipur road, Haryana. The work of diversion/height raising work at Ch. 66.050, Ch. 74.750, Ch. 75.840 & Ch. 86.00 (total 04 nos. crossing) of 220 KV Transmission lines infringing Delhi-Gurugram-SNB Regional Rapid Transit System (RRTS) Corridor by M/s NCRTC in the State of Haryana (6.28 Mb application-pdf)
20-12-2022

Pages