Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1651 Madhya Pradesh Proposal for permission of underground road crossing of 33KV line by trenchless (HDD) method at Ch 153.452 of Sindoor-Bareli section of NH-45 in Village-Bhopatpur, Tehsil-Deori, District-Raisen in the State of Madhya Pradesh (64.93 Kb application-pdf)
03-09-2024
1652 Madhya Pradesh Proposal for seeking water pipeline crossing permission at Ch. 600+160 and laying from Km. 600+160 to Km. 600+378 LHS on NH-3, Bypass A.B.Road, under right of way for laying water pipeline at Village-Khajrana, Indore in the State of Madhya Pradesh (1.41 Mb application-pdf)
03-09-2024
1653 Uttar Pradesh Providing NOC for laying 100 mm (4") Dia Cs pipeline on NH-29E at km. 90.871 to km. 91.441 in District-Gorakhpur in the State of Uttar Pradesh (946.91 Kb application-pdf)
02-09-2024
1654 Rajasthan Regarding Permission of Utility laying along and across places at Dungarpur Division for the "Construction of works of Water Supply Production and Distribution Network Improvements with house service connections for nonrevenue water reduction and continuous water supply and providing Sewer Network with house connections, and construction of Sewage Treatment plant & Sewage pumping Station and all allied works and operation services of the entire system for 10 years at Dungarpur" (300.04 Kb application-pdf)
02-09-2024
1655 Haryana Regarding issue of NOC NH-44 at Km. 146.180 w.r.t. 220 KV D/C line from 800 KV S/Stn. PGCIL Bhadson to 220 Kv S/Stn. Ramana-Ramani with 0.5 Sq. Inch Conductor (404.74 Kb application-pdf)
02-09-2024
1656 Jharkhand NOC regarding laying of water pipeline in the area of Saraiyahat and Ramgarh under Bahugramin Jalpurti Yojna (1.19 Mb application-pdf)
02-09-2024
1657 Tamil Nadu Request for permission to lay underground Optical Fiber Cable (OFC) on NH 544H Thoppur Bhavani Section) Along the road from Km 12+400 to Km 12+900 (LHS), Km 25+950 to Km 26+200 (RHS) and crossing at Km 12+400, Km 12+900, Km. 25+950 and Km. 26+200 in the State of Tamil Nadu (510.78 Kb application-pdf)
02-09-2024
1658 Uttar Pradesh Providing NOC for laying 100 mm MDPE gas pipeline on NH-29E (New NH-24) from km. 89.000 to km. 94.800 at District-Gorakhpur in the State of Uttar Pradesh (908.38 Kb application-pdf)
02-09-2024
1659 Jharkhand Four Laning of Mehgama-Hansdiha section of NH-133 from Km 0+000 (existing Km 41+900) to Km 51+825 (existing Km. 93+000) in the State of Jharkhand on Hybrid Annuity Mode-Proposal of laying water pipeline in the area of Pathargama Block (943.63 Kb application-pdf)
01-09-2024
1660 Jharkhand Permission of overhead crossing for U/C 400 KV D/C Quad moose PVUNL (Pairatu)-Koderma Transmission line (819.60 Kb application-pdf)
01-09-2024

Pages