Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1331 Maharashtra Improvement, Operation and Maintenance including strengthening; ans widening and existing 2 lane carriageway to 4/6 lane adivided carriageway configuration for Kondhali-Talegaon section (50.000 to 100.000) of NH-53 in the State of Maharashtra on BoT basis-Laying of 11 KV underground HT cable across NH-53 at km 87.320 in Mouza Parola, Ta. Karanja, District-Wardha (552.23 Kb application-pdf)
03-04-2024
1332 Uttar Pradesh Proposal for laying Over Head 11KV ACSR & Weasel Conductor Cable from Km 140+360 to Km 142+375 (2015m) RHS & Km 140+360 to Km 140+435 (75m) LHS & Km 142+120 to Km 142+300 (180m) LHS & crossing by HDD Method at Km. 138+720, Km 140+435 & Km 142+120 on NH-09 (Old NH-24) (Delhi-Moradabad Section) at District-Moradabad in the State of Uttar Pradesh (3.72 Mb application-pdf)
03-04-2024
1333 Maharashtra Proposal to lay underground electrical cable crossing National Highway at 11 KV XLPE cable 185 sqm National Highway at crossing 20.779 on NH-53 from Gondkhairi Ta. Kamlmeshwar, District-Nagpur in Nagpur-Kondhali section of NH-6 (554.59 Kb application-pdf)
03-04-2024
1334 Maharashtra Proposal for permission for laying of 33KV Overhead line crossing at Ch. Km 08.500 at village Takwiki, ta. & Dist. Dharashiv & Chi. Km 13.700 at village Wadgaon Lakh, Ta. Tuljapur & District-Dharashiv of Tuljapur-Ausa section of NH-361 (529.33 Kb application-pdf)
02-04-2024
1335 Jharkhand Proposal for use of ROW for laying of water pipeline in the area of Sunder Pahari and Godda along & across the four Laning of Mehgama-Hansdiha section of NH-133 from Km. 00+000 (existing Km. 41+900 to Km. 51+825 (existing Km. 93+000) in the State of Jharkhand on Hybrid Annuity Mode (1.70 Mb application-pdf)
02-04-2024
1336 Kerala Laying of 33KV 3CX300 SQMM XLPE UG cable through 150mm dia HDPE pipe along NH-66 from Ch. Km 280+277 to Ch. 280+557(RHS) and across at Ch. Km 280+557 in Ramanattukara-Valanchery stretch by M/s KSEBL (371.09 Kb application-pdf)
02-04-2024
1337 Odisha Rehabilitation and up gradation of Jharpokharia-Baripada-Baleshwar section of NH-5 from Km.0+000 to Km.80+600 in the State of Odisha under NHDP Phase-IV on EPC Mode-Proposal for laying of 11 KV cable (2 run) near Panchabanda at Km.35+560 of NH-18 (10.76 Mb application-pdf)
02-04-2024
1338 Maharashtra Application for Access permission for laying of 12" dia CS & 125mm MDPE Natural Gas Pipeline along the road for development of city gas distribution network in the Geographical Area (GA-11.33) of Nagpur District from km 14.585 to km 25.200 (length 10615m) through open trench method (RHS) and 8 nos. of crossings through HDD Method on Nagpur-Hyderabad section of NH-44 in the State of Maharashtra (576.77 Kb application-pdf)
02-04-2024
1339 Maharashtra Submission of proposal for laying/crossing at Near Forest Office, Deori, village of Sixteen (3) locations of 11 KV Deori Electrical Feeders XLPE Cable of 300 sqmm 3 core across the NH-6 under Deori Division of Gondia Circle (543.07 Kb application-pdf)
02-04-2024
1340 Tamil Nadu Proposal for laying of water pipe line in Madurai-Ramanathapuram Section of NH-85 & 87 (old NH-49) along the road from Km 81+064 to Km 83+100 (LHS & RHS), Km 84+200 to Km 84+300 (LHS), Km 84+200 to Km 85+900 (RHS), Km 88+500 to Km 89+100 (RHS), Km 91+800 to Km 93+400 (RHS), Km 94+600 to Km 97+600 (RHS), Km 100+500 to Km 101+100 (RHS), Km 107+700 to Km 109+700 (RHS), Km 116+800 to Km 117+200 (RHS) & Km 118+600 to Km 120+484 (RHS) and crossing @ Km 84+285, Km 96+820 & Km 108+800 for a total length of 16.057 Kms (along the road length=15,956m open trench method & across length=101m HDD method) (9.44 Mb application-pdf)
01-04-2024

Pages