Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal for the permission of laying U/G XLPE-HT cable (3 Core 185 Sqmm) by HDD method along/across NH-30, Lucknow Raebareli Prayagraj Road, 2 No. crossing at 64.605 & CH.68.645 at Harchandpur, Block-Harchandpur, District-Raebareli in the State of Uttar Pradesh

    Upload Document File:  1-Inv-cmt-pub-070725-740 25.06.2025.pdf ...

    morthadmin - 07/07/2025 - 10:20 - 0 comments

  2. Proposal for permission of laying overhead electric line from Km. 52.820 to Km. 54.120 (RHS) on NH-34 (Ghaziabad– Aligarh Section) to Government Hospital, Sikandrabad in District-Bulandshahar in the State of Uttar Pradesh

    Upload Document File:  9-Inv-comment-pub-040725-24708.pdf ...

    morthadmin - 07/04/2025 - 16:47 - 0 comments

  3. Proposal for permission of underground road crossing of water supply pipe line at Km. 85+665 on Ghaziabad – Aligarh Section of NH-34 in District-Bulandshahar in the State of Uttar Pradesh

    Upload Document File:  8-Inv-comment-pub-040725-24705.pdf ...

    morthadmin - 07/04/2025 - 16:43 - 0 comments

  4. Requesting permission for the erection of 110/22 KV Electrical cable line with pole along the road from Km 137/990 to Km 140/000 (RHS) with 35 nos. of RSJ poles for a total length of 2010 meters in Thanjavur to Manamadurai section (NH-36)

    Upload Document File:  7-Inv-com-pub-040725-E-284820_merged.pdf ...

    morthadmin - 07/04/2025 - 15:16 - 0 comments

  5. Proposal for permission for overhead crossing of 132kv SC DC Akhada Balapur-Nandapur TSS line (Tower Loc. No. 01 NMS+9) & Tower Loc. No. 02MS+9) at Ch. 157.710 from LHS to RHS near Village-Akhada Balapur Tq. Kalamnuri & District-Hingoli

    Upload Document File:  6-Inv-comment-pub-040725-1042 - 04.07.2025.pdf ...

    morthadmin - 07/04/2025 - 15:13 - 0 comments

  6. NOC permission for laying of 6" (150mm) Dia Steel Natural Gas Pipe Line, Part-1 along the NH-05 from Sher Shah Wali Chowk to Chungi No.7, from Km 11.245 to 12.805 (LHS) = 1560.00m & Crossing at Km 11.245 (LHS to RHS), Length = 60.00m, on Ferozepur - Ludhiana Road, Part-2 along the NH-354, from Sher Shah Wali Chowk to Gandhi Garden, from Km 223.140 to 224.278 (LHS), Length = 1138.00m, on Ferozepur - Sri Muktsar Sahib road, (Total Length = 1560+60+1138=2758.00m) at Ferozepur, Tehsil & District-Ferozepur in the State of Punjab-Gujrat Gas Limited (GGL)

    Upload Document File:  5-Inv-cmt-04072025-pub-699-700.pdf ...

    morthadmin - 07/04/2025 - 15:10 - 0 comments

  7. NOC permission for laying of proposed Water Supply Pipe Line part-1 from Km.91.463 to 93.228 (RHS), Total Length = 1765.00m, part-2 from Km.93.491 to 93.535 (LHS), Length = 44.00m, along the NH-703A, at Mallanwala Khas, on Makhu-Ferozepur Road, District Ferozepur in the State of Punjab-M/s Punjab Water Supply & Sewerage Division, Ferozepur

    Upload Document File:  4-Inv-comment-pub-040725-697-98.pdf ...

    morthadmin - 07/04/2025 - 15:07 - 0 comments

  8. Proposal for permission for laying of underground laying of 11 KV HT XLPE Electric Cable (185 sq. mm) M/s Indian Infrastructure & Projects India (P) Ltd. along/ across at km 142/930 to km 143/360 of NH-51 Botad-Ranpur road for connecting 66 KV substation Ranpur to Solar Power plant, Taluka-Ranpur, District-Botad in the State of Gujarat

    Upload Document File:  3-Inv-cmt-04072025-Untitled_07042025_123613.pdf ...

    morthadmin - 07/04/2025 - 12:54 - 0 comments

  9. Permission for pipeline crossing at Chainage Km 353+500 of 250 mm 2 PVC pipe with 500 mm & MS casing pipe on NH-41, Samakhiyali-Gandhidham road, District-Kutch

    Upload Document File:  2-Inv-cmt-D-2733-040725-IPC-NH-41 at Ch Km 353+500_PD-Gandhidham-281149.pdf ...

    morthadmin - 07/04/2025 - 10:10 - 0 comments

  10. NOC permission for laying of proposed Water Supply Pipe Line part-1 from Km.76.150 to 76.520 (LHS), Length = 370.00m, along the NH-703A, at makhu, on Makhu-Ferozepur Road Distt Ferozepur. Part-2 from Km.75.672 to 76.094(RHS), Length = 422.00m, along the NH-703A, at makhu, on Jalandhar-makhu Road, part 3 from Km.33.285 to 33.611(RHS), Length = 326.00m along the NH-703B, at Makhu, on Moga-Makhu road, District-Ferozepur in the State of Punjab

    Upload Document File:  1-Inv-comment-040725-pub-683-84.pdf ...

    morthadmin - 07/04/2025 - 10:06 - 0 comments

Pages