Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Minimum eligibility criteria in National Highways Fee (Determination of rates and collection) Rules 2008, for levying of user fees

    ... Friday, September 9, 2016 Issue by:  Toll Sequence no:  0 ...

    morthadmin - 06/10/2024 - 11:46 - 0 comments

  2. 100 Cr circular-Minimum eligibility criteria

    ... Friday, September 9, 2016 Issue by:  Toll Sequence no:  0 ...

    morthadmin - 06/10/2024 - 11:45 - 0 comments

  3. Minutes of the Meeting of the Inter-Ministerial Committee held on 19.07.2023 at 4:00PM to discuss the changes in model RFP and MCA of EPC, HAM and BOT (Toll) modes of contract

    Document Category: BOT ...

    morthadmin - 05/27/2024 - 15:42

  4. Minutes of the Inter-Ministerial Committee (IMC) meeting held on 08.01.2024 and 02.02.2024 under the Chairmanship of Secretary (RT&H) to discuss the changes in MCA (Capacity Augmentation) on BOT(Toll) and MCA for TOT

    Document Category: BOT ...

    morthadmin - 05/27/2024 - 15:35

  5. Proposal for ROW permission for laying Water supply line parallel to NH-8E near Kobadi Toll Booth by Gujarat Water Infrastructure Limited, from Km 17+180 to Km 19+080 Budhel to Borda Bulk Pipeline Project NC-41, Dist: Bhavnagar on National Highway-8E (New 51) in the state of Gujarat

    Upload Document File:  62. IPC_D-1770 dt. 17.06.2022_GWIL-Barwala_Km 17+18_PD-Bhav-147121_00001.pdf ...

    morthadmin - 06/20/2022 - 10:16 - 0 comments

  6. NHAI-RO Kerala-4-laned Walayar-Vadakkancherry (Km.182+250-Km.240+000) section of NH-544 on BOT(Toll basis)-O&M Stage and 6 Laning of Vadakkanchery-Thrissur (Km.240+000-Km.270+000) of NH-544 on BOT(Toll) basis-Under construction-Laying of OFC on 40mm HDPE duct in between Km.235+120 to Km.237+500(LHS) of NH544 for a length of 2.080Km by M/s Telesonic Network Ltd. (Airtel)

    Upload Document File:  1457-2021(1).pdf ...

    morthadmin - 11/02/2021 - 11:40 - 0 comments

  7. Project comprising of 9 National Highway Stretches (Bundle-1) on toll operate Transfer Garamore to Samakhiyali section (From Km.354+537 to Km 306+000) of NH SA in the state of Gujarat. - Proposal for ROW permission for laying of 200mm Dia PVC GWSSB Pipeline crossing NH-27, at Km 291+550 in the state of Gujarat

    Upload Document File:  42. IPC_D-1117 dt. 18.04.2022_GWSSB-Bhachau_Km 291+550_PD-Palanpur-140877(1).pdf ...

    morthadmin - 04/19/2022 - 11:45 - 0 comments

  8. Project comprising of 9 NH Stretches (Bundle-1) on Toll Operate Transfer Garamore- Samakhiyali section (Km 354+537 to Km 306+000) of NH-8A in the state of Gujarat. - Proposal of ROW permission for laying 12" Dia Gas Pipeline parallel to NH-27 from Km 271+850 to Km 264+750 (LHS) for a length of 7100Mtr along the pipeline route in Taluka-Maliya, District-Morbi in the state of Gujarat

    Upload Document File:  32. IPC_D-873 dt. 25.03.2022_GGL_Km 271+850_PD-Palanpur-128256-1.pdf ...

    morthadmin - 03/25/2022 - 16:50 - 0 comments

  9. Project comprising of 9 National Highway Stretches (Bundle-1) on toll operate Transfer Garamore to Samakhiyali section (From Km 204+000 to Km 306+000) of NH-8A in the state of Gujarat. Reg. Proposal seeking ROW permission for crossing 700mm Dia GWSSB Pipeline, at Km 304+750 of NH-27 in the state of Gujarat

    Upload Document File:  33. IPC_D-874 dt. 25.03.2022_GWSSB-Bhachau-Km 340+750_PD-Palanpur-130966-1.pdf ...

    morthadmin - 03/25/2022 - 16:49 - 0 comments

  10. Projects Comprising of 9 NH Stretches (Bundle-1) on Toll Operate Transfer Mode for Garamore to Samakhiyali section in the State of Gujarat. - Proposal for ROW permission for Pipeline laying parallel to NH-27 (Morbi-Samakhiyali Road) from Km 254+537 to Km 254+817 (RHS) for a Length of (L=280m) along the pipeline route in District Morbi in the state of Gujarat

    Upload Document File:  31. IPC_D-872 dt. 25.03.202_GGL_Km 254+537_PD-Palanpur-128251-1.pdf ...

    morthadmin - 03/25/2022 - 16:44 - 0 comments

Pages