Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Permission for Construction of Transmission Line package-TLO2 for 400 KV D/C (Quad Moose) Ananthapuram PS-Cuddapah Transmission line associated with "Transmission Scheme for Solar Energy Zone in Ananthapuram (Ananthapur) (2500 MW) and Kurnool (1000 MW), Andhra Pradesh" under TBCB-in Ramarajupalle Village, Gooty Mandal, Anantapur District, Andhra Pradesh–(at Km.311+394)

    Upload Document File:  5-Inv-cmt-829 & 830 18.03.2025-(Quad Moose) at Km.311+394.pdf ...

    morthadmin - 03/19/2025 - 15:34 - 0 comments

  2. Proposal for permission for 132KV overhead Crossing at Ch. 320.620 & 32:0.660 (BSH) [Location no. 44 & 45] near Village-Kalgaon, Tq. Mahagaon & District-Yavatmal

    Upload Document File:  4-Inv-cmt-2737 - 18.03.2025.pdf ...

    morthadmin - 03/19/2025 - 10:46 - 0 comments

  3. Permission for laying of underground 8” dia. Steel Gas Pipeline along with 90 mm dia. MDPE Pipeline from GAIL SV 05 Station to Murhu Town Connectivity along NH-75E at Chainage 37.550 km to 50.562 km for development of City Gas Distribution Network in Khunti City of District-Khunti, State-Jharkhand

    Upload Document File:  3-Inv-Invitation of public comments_0002_250319_074756.pdf ...

    morthadmin - 03/19/2025 - 10:42 - 0 comments

  4. Proposal seeking ROW Permission for Drainage Line Details of crossing of 1219 mm dia carrier with 1600 mm dia MS Casing pipe by pushing Method on NH-53 at km 28.240 near Khajod Junction village-Khajod, Taluka-Surat City, District-Surat in the State of Gujarat

    Upload Document File:  2-Inv-D-1083 dated 18.03.2025 reg. IPC_SMC-Surat_Khajod_256491.pdf ...

    morthadmin - 03/19/2025 - 10:38 - 0 comments

  5. Permission for Construction of 400 KV D/C (Quad Moose) Ananthapuram PS- Kurnool-III PS Transmission Line–(at Km.308+540)

    Upload Document File:  1-Inv-827 & 826 18.03.2025 Constrcution of 400 KV DC (Quad Moose) at Km. 308+540.pdf ...

    morthadmin - 03/19/2025 - 10:34 - 0 comments

  6. Proposal for the permission of laying U/G Water Pipeline (HDPE Pipe) By HDD Method along/across NH-731, Lucknow-Sultanpur Road, from Ch.- 132.129 to Ch.-133.101 (LHS, Length-972.0m), From Ch.-132.528 to Ch.-133.251 (RHS, Length-723.0m) at G.P. -Harkhi, Doulatpur, Bankepur & Mahajitpur, District-Sultanpur, in the State of Uttar Pradesh

    Upload Document File:  4-Inv-cmt-Letter No. 3357.pdf ...

    morthadmin - 03/18/2025 - 16:33 - 0 comments

  7. Proposal for the permission of laying U/G Optical Fiber Cable (OFC) From Ch. 175.916 to Ch.-176.516, LHS, (Length-600.0m), From Ch.-177.307 to Ch.-178.039, LHS. (Length-732.0m), From Ch.-193.900 to Ch.-194.900, LHS, (Length-1000.0m), at Ch.-213.150 (Length-7X36.0m=252.0m) Total Length-7634.0m. Along/Across NH-731, Lucknow-Sultanpur Road, District-Lucknow in the State of Uttar Pradesh

    Upload Document File:  3-Inv-cmt-Letter no. 3386.pdf ...

    morthadmin - 03/18/2025 - 16:28 - 0 comments

  8. Proposal for permission for underground crossing (Double Run) Across the Road of 01 Nos. 11 KV XLPE cable through (160 mm dia HDPE Pipe) HDD method at Ch. No.141.260 (RHS 27.604+LHS 32.432= 60.036 Mtr.) in NH-731(Varanasi to Lucknow Section), District-Amethi, in the State of Uttar Pradesh

    Upload Document File:  2-Inv-Letter No. 3385.pdf ...

    morthadmin - 03/18/2025 - 16:23 - 0 comments

  9. Request for grant of permission for laying of 250mm Dia DI LA Class (Ductile Iron Pipes) across at Km.47/780 in Chavadi Bypass Junction in the Cuddalore District in the State of Tamil Nadu

    Upload Document File:  4-Inv-Lr_No_487-dt-14.03.2025-PKG-II-Pipeline Km 47_780.pdf ...

    morthadmin - 03/17/2025 - 10:41 - 0 comments

  10. Permission for laying of water pipeline along the National Highway NH-52 (Solapur-Vijayapura Section) in the State of Karnataka

    Upload Document File:  2-Inv-cmt-4484_4485_merged.pdf ...

    morthadmin - 03/17/2025 - 10:34 - 0 comments

Pages