  1. Gas Distribution Network for Sirohi GA in Rajasthan State - (Jay Ganpati Petroleum Connectivity): Request for granting permission for laying 6” dia Steel Natural Gas Pipeline to supply the natural gas to Jay Ganpati Petroleum near Village-Parlai, Tehsil-Pindwara, Distt-Sirohi in Rajaasthan State - Pipeline laying parallel NH-62 (Sirohi-Pindwara) from NH km, 729/944 to 729/022 (L=0.922 km) and cross at km. 729/022 by M/s. Gujarat Gas Ltd.

    Upload Document File:  3368 dt 23-02-2022(1).pdf ...

    morthadmin - 02/24/2022 - 10:25 - 0 comments

  2. Two-laning of Shillong connecting NH-40 and NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 under SARDP-NE on BOT (Annuity) mode: permission for laying proposed carbon steel natural gas pipeline along with Carbon steel OFC conduit across shillong NH Bypass en-route National Highway under shillong spurline

    Upload Document File:  gewdwqd738hiue9021ks.pdf ...

    morthadmin - 02/17/2022 - 10:13 - 0 comments

  3. 4-laning of Khalghat-MP/Maharashtra Border Section of NH-3 from Km 84.700 to 167.500 in the State of Madhya Pradesh under NHDP Phase IIl on DBFOT basis — Proposal for permission for High Tension line (132 kv) line crossing of NH-52 (old NH-3) at Ch. 120+700, Village-Ajandi, Tehsil Thikri, Distt. Barwani under Nagalwadi Micro Lift irrigation Scheme of ND Division 14, Thikri, District Barwani in the state of Madhya Pradesh

    Upload Document File:  45835-02162022171039(1).pdf ...

    morthadmin - 02/17/2022 - 10:09 - 0 comments

  4. Six-laning of Samakhiali-Gandhidham (Km 306+000 to Km 362+160 =Length-Km 56+16) section of NH-8A in the state of Gujarat to be executed as BOT (Toll) on DBFOT under NHDP Phase-V. Reg. Proposal for ROW permission for laying of OFC Cable and 40mm HDPE Pipe along Km 306+000 to Km 331+500 on LHS & Across at Km 330+750 on NH-41

    Upload Document File:  011. IPC_D-422 dt. 11.02.2022_Telesonic_Km 306 to Km 331+500_PD-Palanpur-128524 (1).pdf ...

    morthadmin - 02/15/2022 - 10:10 - 0 comments

  5. Four/Six Laning of Gujarat/ Maharashtra Border - Surat - Hazira Port Section of NH-6 (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Proposal for ROW Permission for carrying out trenching work by HDD from Km. Parallel to Road 24.500 RHS and from O.P. Farm to Luthara Farm of NH- 53 in the state of Gujarat

    Upload Document File:  010. IPC_D-345 dt. 08.02.2022_DGVCL_Km 24+500_PD-Bharuch-128145(1).pdf ...

    morthadmin - 02/10/2022 - 11:41 - 0 comments

  6. Construction of Six-lane access controlled highway (NH-152D) starting from junction with NH-9 (Rohtak-Jind section) near Kharkara to Junction with NH- 334B (Charkhi Dadri- Jhajjar section) near Charkhi Dadri (Ch. 131+000 to 165+000; length 34 Km) on EPC mode under Bharatmala Pariyojna in the State of Haryana (Pkg-6) - Permission to lay Sultanpur-Jhajjar-Hisar Natural Gas pipeline along with OFC across under construction road b/w Ch. 142.800 to 143.000 at village- Kherari, Tehsil Kalanaur, Dist.- Rohtak

    Upload Document File:  8616(1).pdf ...

    morthadmin - 02/08/2022 - 12:46 - 0 comments

  7. Four laning of Solapur - Yedshi Section of NH-211 from Km. 0.00 to Km. 100.00 (Design length 98.717 km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase IVB - Submission of proposal for permission of laying of 11 KV electric fine underground cable work at Ch.89+835 near Chorakhali, Tal. Kalamb, Dist. Osmanabad on Solapur Yedshi Section of NH-211 in the State of Maharashtra

    Upload Document File:  5572(1).pdf ...

    morthadmin - 02/07/2022 - 10:23 - 0 comments

  8. O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 -Permission for laying of cables laong NH-44(Old NH-7) from Chandapura Circle Km 24.350 to Thirumagondanahalli Km 26.550 on LHS and Halechandapura Km 24.860 to Km 25.270 on RHS and Five Road Crossings at Km 24.350, Km 24.400, Km 24.860, Km 25.270, Km 26.550 for a total length of 2.61 Km in the State of Karnataka

    Upload Document File:  20220201195841(1).pdf ...

    morthadmin - 02/01/2022 - 16:44 - 0 comments

  9. O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore- Hosur Section of NH-7 -Permission for laying of cables along NH-44(Old NH-7) from Balagaranahalli Km 28.600 to Km 28.800 on LHS for a total length of 200 mts in the state of Karnataka

    Upload Document File:  20220201195819(1).pdf ...

    morthadmin - 02/01/2022 - 16:43 - 0 comments

  10. O&M and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6- laning from Electronic city to Attibele (Km 18.750 to Km 33,130) on Bangalore- Hosur Section of NH-7 -Permission for laying of cables along NH-44(Old NH-7) from Electronic city BMTC depot Km 17.650 to Hebbagodi PS Km 20.110 on LHS and one road crossing at Km 20.110 for a total length of 2.46Km in the State of Karnataka

    Upload Document File:  20220201195756(1).pdf ...

    morthadmin - 02/01/2022 - 16:42 - 0 comments