Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Permission to lay underground Optical Fibre Cable (OFC) on NH-79 (Salem - Ulundurpet Section) along the road between Km 92/600 to Km 92/800 (LHS) and across @ Km 92/800 for a total length of 250m in the limits of National Highways by M/s. Vodafone Idea Telecom Infrastructure Limited, Chennai

    Upload Document File:  Ro - 3020 - Domain.pdf ...

    morthadmin - 09/09/2021 - 13:43 - 0 comments

  2. Permission to lay underground Optical Fibre Cable (OFC) on NH-47 (New NH-544) (Chengapalli - Walayar Section) along the road between Km 133/670 to Km 134/000 (LHS), Km 143/300 to Km 143/800 (LHS) & Km 134/600 to Km 135/000 (RHS) and across @ Km 143/300 for a total length of 1290m in the limits of National Highways by M/s. Jio Digital Fibre Private Limited, Chennai

    Upload Document File:  Ro - 3018 - Domain (1).pdf ...

    morthadmin - 09/09/2021 - 13:43 - 0 comments

  3. Permission to lay underground Optical Fibre Cable (OFC) on NH-7 (Krishnagiri Thumbipadi Section) along the road between Km 105/900 to Km 106/660 (RHS), Km 143/800 to Km 144/350 (LHS) & Km 143/800 to Km 144/350 (RHS) and across @ Km 106/660, Km 144/350 for a total length of 1984m in the limits of National Highways by M/s. Jio Digital Fibre Private Limited, Chennai

    Upload Document File:  Ro - 3019 - Domain (1).pdf ...

    morthadmin - 09/09/2021 - 13:43 - 0 comments

  4. Permission to lay Underground Optical Fiber Cable (OFC) on NH-7 along the road from Km 185/800 to Km 186/600 (RHS) and across at Km 185/800 of Thumbipadi - Namakkal section of NH-44 for a total length of 843 meter in the state of Tamil Nadu by M/s. Telesonic Networks Limited, Chennai

    Upload Document File:  Ro - 3010 - Domain (1).pdf ...

    morthadmin - 09/09/2021 - 13:42 - 0 comments

  5. Permission to lay underground OFC along the road from km.33/130 to km.91/050 (RHS), km.91/050 to km.92/350 (LHS) and one road crossing at km.91/050 on Hosur - Krishnagiri section of NH-44 (Old NH-7)

    Upload Document File:  3028.pdf ...

    morthadmin - 09/09/2021 - 13:42 - 0 comments

  6. Permission to lay the water pipeline on NH-47 (Salem to Kumarapalayam section) from Km 14/006 to Km 14/100 (LHS) and across the road at Km 14/100 by Open trench & HDD Method by the Executive Engineer, TWAD Board, RWS Division, Salem

    Upload Document File:  Ro - 3064 - Domain.pdf ...

    morthadmin - 09/09/2021 - 13:42 - 0 comments

  7. Permission to lay the water on NH-47 (Salem to Kumarapalayam section) from Km 12/410 to Km 12/505 (LHS) and across the road at Km 12/505 by Open trench & HDD Method by the Executive Engineer, TWAD Board, RWS Division, Salem

    Upload Document File:  Ro - 3077.pdf ...

    morthadmin - 09/09/2021 - 13:42 - 0 comments

  8. Permission to lay underground Electrical Cable along the road on NH-4 (Maduravoyal to Sriperumbudur Section) from Km 21/000 to Km 18/100 (RHS) - 2900m by Open Trench Method and diagonally across the road from KM 18/100 to Km 18/000 - 70m by Trenchless Method (HDD) for a total length of 2970m in the limits of National Highways by M/s TANTRANSCO, Chennai Development Circle -II

    Upload Document File:  2616 (1).pdf ...

    morthadmin - 09/09/2021 - 13:41 - 0 comments

  9. Permission for laying of underground Gas Pipeline of M/s Baghpat Green Energy Private Limited for 4” Dia of Carbon Steel Pipe from Design Ch. 38+260 to Design Ch. 41+360 (along Right Hand Side of the National Highway) and for 5" Dia of MDPE pipe from design Ch. 40+760 to Design Ch. 41+360 (along Right Hand Side of the National Highway). Across the National Highway with 4" Dia of Carbon Steel Pipe at Design Ch. 38+450 (30m). The total section length for ROW applied for 4" Dia of Carbon Steel Pipe is 3.13Km. (3130m) and for 5" Dia of MDPE Pipe is 0.6Km (600m) on along Meerut-Baghpat Road, National Highway, New NH-334B (Old SH-14) (Total applied length = 3730m) in the State of Uttar Pradesh

    Upload Document File:  Letter no 918 dated 07.09.2021 UGL BAghpat Green Energy Baghpat PC.pdf ...

    morthadmin - 09/09/2021 - 13:40 - 0 comments

  10. Permission for laying of 1200 mm dia pipeline (MS Pipe) across NH-19 (Old NH-02) across Ch.460.213 length 60 mtr. Bhaunti (Near SAIL Plant) Kanpur in the State of Uttar Pradesh

    Upload Document File:  Letter no 904 dated 07.09.2021 KAnpur PC.pdf ...

    morthadmin - 09/09/2021 - 10:28 - 0 comments

Pages