Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal for NOC permission for crossing of water supply pipeline in Km.01.50 to km.04.85 of NH-235 (Hapur road) in the state of Uttar Pradesh

    Upload Document File:  Scan Mar 23, 2022 (1).pdf ...

    morthadmin - 03/24/2022 - 10:15 - 0 comments

  2. Permission for laying sewer pipe along and across NH-113 for work of “Construction of Sewerage system includes sewerage Network, sewage treatment plant, sewage pumping station and house sewer connection along with all allied works and operation services of the entire system 10 years at Pratapgarh Town Contract Package No.RSTDIP PRT 01 in the state of Rajasthan

    Upload Document File:  mnoisijhvdshsakjhbsajhbSAXS.pdf ...

    morthadmin - 03/23/2022 - 17:29 - 0 comments

  3. Permission for laying Optical Fiber cables from Bijwanpar to Devi Sarai Chowk MS- 118+000 to MS-122+000 along 4 Km of NH-31 section in the state of Bihar

    Upload Document File:  PIU Lt-1469 Dt-19.03.2022-1.pdf ...

    morthadmin - 03/23/2022 - 11:34 - 0 comments

  4. Proposal for grant of permission for laying Optical Fiber along Pune to Male Village NH-753-F, Ch. Km, 1/275 to 31/400 Km, in the following stretches, a) From Ch. Km, 04/850 to 05//50, (from Bhugaon Internal road to Reliance Jio OFC Chamber) total length 1000 Mtrs. b) From Ch. Km, 8/130 to 9/130, (from Hariram Ashray Math to Reliance Jio OFC Chamber) total length 1000 Mtrs. c) From Ch. Km, 11/000 to 13/150, (from Lavale Phata to Ghotawade Phata) & Km, 13/150 to 13/825 for the total length of 2825 Mtrs. d) From Ch. Km, 1/275 to 19/950 (from Lavale Phata to Paud Bus Stand) for the total length of 18675 Mtsr. Total length of 23500 Mtrs., in the State of Maharashtra Applicant: Jio Digital Fibre Pvt Ltd, 9th Floor, Maker Chambers IV, 222, Nariman Point, Mumbai-400021

    Upload Document File:  P-10-OFC-CE-MSRDC-Mum-1955-NH-753-F-Pune to Male Vill-1.pdf ...

    morthadmin - 03/22/2022 - 16:50 - 0 comments

  5. Six Laning of Bengaluru-Nidaghatta Section of NH-275 - Issue of NH Access permission for laying of underground 12” NB Steel gas Pipeline along NH-275 (Bengaluru- Nidaghatta-Mysuru) from Km 31/5 Bidadi to Km.135.304 near Mysuru Ring road junction for length of 103/804km and crossing at Km 135/304 near Mysuru Ring road junctionalong with installation of sectionalizing valve of chamber size 2mx2.5m at an interval of 3km

    Upload Document File:  3351 2022 AGP PUBLIC COMMENTS-1.pdf ...

    morthadmin - 03/21/2022 - 12:14 - 0 comments

  6. Proposal seeking permission for laying of underground 12”/8”" dia steel Gas pipeline along with 125mm MDPE Gas pipelines and installation of sectionalizing valve of chamber (Size 1.00M X 2.5 M) along NH-275K- 41.535 through open trench method and 5 nos crossings at km. 1.87, Km. 23.920, Km. 28.260, Km 29.080, Km. 34.857 through HDD method by AGP City gas private limited, Mysuru

    Upload Document File:  AGP City Gas pvt. ltd. NH-275K.-1.pdf ...

    morthadmin - 03/21/2022 - 10:25 - 0 comments

  7. Permission for the proposal to lay OFC along NH-766 (Old NH-212, Khozikod - Kollegala) from Forest Check post Km 136.600 to Maddur Km 138.000 on LHS for total length of 1.40 Kms, near Gundlupet Taluk, Chamarajanagara District in the state of Karnataka

    Upload Document File:  3558 lay OFC along NH-7661.pdf ...

    morthadmin - 03/21/2022 - 10:24 - 0 comments

  8. NHAI, PIU, Chennai — Permission for laying of underground Gas pipeline along the road from Km 03/770 to Km 16/000 (12230 m) on LHS by Open Trench Method and HDD Method in the State of Tamil Nadu in Tirupathi -Tiruttani - Chennai section of NH-205

    Upload Document File:  51848720981-2176321215.pdf ...

    morthadmin - 03/21/2022 - 10:23 - 0 comments

  9. NHAI, PIU, Chennai — Permission for laying of underground Gas pipeline along the road from Km 286/870 to Km 338/030 (51160 m) on LHS by Open Trench Method and HDD Method in the State of Andhra Pradesh and from Km 0/000 to Km 03/770 (3770 m) on LHS by Open Trench Method and HDD Method in the State of Tamil Nadu in Tirupathi -Tiruttani - Chennai section of NH-205

    Upload Document File:  50783190272138021983.pdf ...

    morthadmin - 03/21/2022 - 10:20 - 0 comments

  10. RO - Vijayawada - Permission for laying of OFC Cable (M/s.Vodafone Idea Telecom Infrastructure Limited) using HDD Method along the road on LHS & RHS from Km. 430/140 to Km. 430/600 and across the road from LHS to RHS at Km. 430/140 and Km. 430/600 on Chilakaluripet - Vijayawada section of NH-16 at Vaddeswaram Village | & Tadepalli Mandal, Guntur District, Andhra Pradesh

    Upload Document File:  865 17-03-2022 Vodafone OFC proposal-1.pdf ...

    morthadmin - 03/21/2022 - 10:19 - 0 comments

Pages