Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal of M/s DFCCIL (Dedicated Freight Corridor Corporation of India Ltd.) for permission of NH-334 NOC for Overhead Power Line crossing at 58+973 in District-Bulandshahr for 132 KV D/C Gulaothi-Wair overhead Transmission Line in District- Bulandshahr

    Upload Document File:  letter no. 1212 dated 15 02 2022 letter with pic(1).pdf ...

    morthadmin - 02/15/2022 - 16:49 - 0 comments

  2. Proposal of M/s DFCCIL (Dedicated Freight Corridor Corporation of India Ltd.) for permission of NH-334 NOC for Overhead Power Line crossing at 46+791 in District-Hapur for 132 KV D/C Hapur-Gulaothi overhead Transmission Line in District-Hapur

    Upload Document File:  letter no 1211 dated 15 02 2022 Public Comments letter with Pic(2).pdf ...

    morthadmin - 02/15/2022 - 16:41 - 0 comments

  3. Proposal for Permission to laying Underground Water pipe line across NH-04 on Nava-Shiva Water Supply Scheme along & across Mumbai - Pune National Highway NH-04, at Ch. Km, 116/500 (Kalamboli Junction) to Km, 124/750 (Rohinjan) in the State of Maharashtra

    Upload Document File:  P-01-WS-MSRDC-10612.pdf ...

    morthadmin - 02/15/2022 - 14:28 - 0 comments

  4. Proposal seeking permission for laying of OFC cable from Honnvara Km 0.00 to Gerusoppa Km 31.000 on LHS of NH 69 (Old NH 206) for a total length of 31.00 Kms and 7 Nos. crossings at Km 8.80, Km 9.00, Km 13.300, Km 13.500, Km 22.300, Km 22.500 & Km 31.00 for a total length of 31.210 Kms through HDD method by M/s. Jio Digital Fibre Pvt. Ltd

    Upload Document File:  0.00 to 31 NH 69 kms(1).pdf ...

    morthadmin - 02/15/2022 - 10:29 - 0 comments

  5. Proposal seeking Permission for laying of OFC cable along NH - 73 (Old NH 234) from Kakkainje Km 72.500 to Charmadi Km 74.600 on LHS for a total length of 2.10 Kms and 1 no. crossing at Km 73.100 through HDD method by M/s. Telesonic Networks Ltd.

    Upload Document File:  NH 73 72 to 74(1).pdf ...

    morthadmin - 02/15/2022 - 10:27 - 0 comments

  6. Permission for laying 18" OD x 0,251” WT MS Natural gas pipeline along with 40 mm OFC duct along NH-53 (Old NH-5A) from chainage 72+250 Km to 68+750 km (From Zero Point, Paradeep to near Kuldia village) & across NH-53 (Old NH-5A) at chainage 68+750 Km (Near Kuldia Village)

    Upload Document File:  461-462(1).pdf ...

    morthadmin - 02/15/2022 - 10:26 - 0 comments

  7. Proposal seeking permission for laying of OFC cable along NH - 169 from Koppa Km 85+500 to Ammadi Km 84+500 on RHS for a total length of 1.0 Kms through HDD method by M/s. Telesonic Networks Ltd.

    Upload Document File:  NH 169 84 to 85 (1).pdf ...

    morthadmin - 02/15/2022 - 10:14 - 0 comments

  8. Proposal seeking ROW permission for laying of OFC Cable and 40mm HDPE Pipe of M/s. Telesonic Network Limited along from Km 268+500 to Km 306+000 on NH-8A (New NH-27) in Garamore-Samakhiyali section of NH-27 in the state of Gujarat

    Upload Document File:  012. IPC_D-424 dt. 11.02.2022_Telesonic_Km 268+500 to Km 306+00_PD-Palanpur-128282 (1).pdf ...

    morthadmin - 02/15/2022 - 10:12 - 0 comments

  9. Proposal seeking Permission for laying proposed 12” Guwahati to Panisagar underground Natural Gas Pipeline along with 6" CS conduit for OFC cable through HDD method across National Highway at Ch 12.120 Km of NH-53(Old)/NH-37(New) and Ch 197.227 Km on NH-44(Old)/NH-06(New) by Indradhanush Gas Grid Limited

    Upload Document File:  RO letter dated 14.02.2022 Public Comments (1).pdf ...

    morthadmin - 02/15/2022 - 10:08 - 0 comments

  10. Permission for laying underground Optical Fibre along Mana Basti to Abhanpur Bus Stand, MS: Km.10.20 to MS: Km.23.60 on NH-30, total section length ROW applied for 13.40 Km. in the State of Chhattisgarh

    Upload Document File:  7175 (1).pdf ...

    morthadmin - 02/15/2022 - 10:06 - 0 comments

Pages