Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Permission for crossing of GAIL's 8” dia steel Natural Gas Pipeline along with 40 mm duct for OFC across NH-316 (Bhubaneswar- Puri) at Km.55+637 in village- Harekrushnapur, Tehsil- Purisadar in Puri District

    Upload Document File:  gidefojcoisjohckpjh.pdf ...

    morthadmin - 05/25/2022 - 09:52 - 0 comments

  2. Permission for laying of 02 Nos. 3x300mm XLPE Cable width 150mm dia each Pipeline (HDPE) across with NH-19 (Chak Katoghan - Allahabad Section) one crossing at Ch.588.152 at Haswa near Village-Katoghan & Bilinda Canal in District Fatehpur in the State of Uttar Pradesh

    Upload Document File:  Letter no 1347 dated 24 05 2022 ( Public Comments)_00001.pdf ...

    morthadmin - 05/25/2022 - 09:46 - 0 comments

  3. Permission for laying of 02 Nos. 3x300mm XLPE Cable width 150mm each dia Pipeline (HDPE) from Km. 558.980 to Km.558.976 along with NH-19 (Bilinda- Allahabad Section) total length of ROW applied for 86 mtr. and once crossing (100 mtr.) 558.976 at Haswa near Village-Bilinda in Distt. Fatehpur in the State of U.P, by PVVNL

    Upload Document File:  Letter no 1349 dated 24 05 2022 ( Public Comments)_00001.pdf ...

    morthadmin - 05/25/2022 - 09:44 - 0 comments

  4. Permission for laying GAIL's 8” dia steel Natural Gas Pipeline along with 40 mm duct for OFC across NH-316 (Bhubaneswar- Puri) from Km.16.110 to Km.16.420 (310 meters) and across to NH at Km.16#420 in Village- Pabasan, Tehsil- Pipili in Puri District

    Upload Document File:  1505-1506_00001.pdf ...

    morthadmin - 05/25/2022 - 09:43 - 0 comments

  5. Permission for laying of steel gas pipeline (8” dia) & MDPE pipeline (90 mm dia) parallel to NH-316 (Bhubaneswar: Puri) from Km.13.700 to Km.53,000 (Uttara Chowk to Tulasi Chaura Chowk) & from Km.13.700 to Km. 16.000 (Uttara Chowk to GAIL LCNG Plant)

    Upload Document File:  1502-1501(1).pdf ...

    morthadmin - 05/24/2022 - 17:36 - 0 comments

  6. Permission for laying of Optical Fiber Cable by aerial methodology on existing MSEDCL Pole and I or erecting new poles along NH-52 starting from Taluka Office T point to Bhambarwadi village total length 28.900

    Upload Document File:  656 - 24.05.2022.pdf ...

    morthadmin - 05/24/2022 - 13:29 - 0 comments

  7. Permission to lay 12” dia Natural Gas Pipeline along with OFC Cable across National Highway-320 at Ch. Km. 24+390 & Pipeline Ch. 1+129 for Tie-in Connectivity of ONGC Bokaro into JHBDPL Network

    Upload Document File:  2233(1).pdf ...

    morthadmin - 05/23/2022 - 17:08 - 0 comments

  8. RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State Fiber Net Limited) using HDD Method across the road of NH-65 at Km. 31/600, Km.38/600, Km.45/980, Km.51/900, Km.55/250 and Km. 63/670 for a total length of 360 mtrs (Across the road each 60 mts) in Vuyyuru Pamarru, Movva, Guduru and Machilipatnam Mandals, Machilipatnam, Krishna District of Vijayawada -Machalipatnam section of NH-65

    Upload Document File:  1628 20.5.2022 APSFL OFC proposal at 31.600 for public comments_00001.pdf ...

    morthadmin - 05/23/2022 - 10:47 - 0 comments

  9. RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State Fiber Net Limited) using HDD Method across the road of NH-65 at Km. 11/250, Km. 13/465 and Km.21/100 for a total length of 180 mtrs (Across the road each 60 mts) in Kankipadu and Vuyyuru Mandals, Machilipatnam, Krishna District of Vijayawada - Machalipatnam section of NH-65

    Upload Document File:  1625 20.5.2022 APSFL OFC proposal at 11.250 for public comments_00001.pdf ...

    morthadmin - 05/23/2022 - 10:46 - 0 comments

  10. Grant of ROW permission for laying of underground 125mm dia MDPE pipeline along NH-71 from Ch. 178/450 to Ch. 179/770 (length 1320 mtrs) on LHS by open cut method and 4” dia steel pipeline & 125mm dia MDPE pipeline in one trech along NH-71 from Ch. 179/770 to 182/270 (length 2500 mtrs.) by open cut method and 125mm dia MDPE pipeline along NH-71 from Ch. 179/680 to Ch. 182/270 (length 2590m) on RHS by open cut method & two crossings for 4” dia steel pipeline (Casing pipe 8” dia), one at Ch. 178/450 (width 60 mtrs) and another one at Ch. 179/810 (width 30 mtrs) on NH-71 by HDD Method

    Upload Document File:  RO - VJA NOC 1620(1).pdf ...

    morthadmin - 05/20/2022 - 14:15 - 0 comments

Pages