Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Permission for laying of 8" Dia (200mm) Carbon Steel Gas Pipeline with OFC along the NH-43 from Kathotiya Village to Near Charcha Village at Right side from ch.251+276 to ch.285+500 (old ch.261+276 to ch.295+500) approx. length 34.224 km. & section from Kharwat Chowk to Koriya/Surajpur Border at Right side ch.289+800 to ch.313+100 (old ch.299+800 to ch. 331+000) approx length 23.300km, total applied length-57+524km

    Upload Document File:  5-Inv-98 dt. 23.04.2025-(Kathotiya village to Charcha Village).pdf ...

    morthadmin - 04/30/2025 - 16:37 - 0 comments

  2. Permission for laying Water pipeline from Km.0/0 to Km.2/197; Km.2/861 to Km.12/450; Km.13/050 to Km.18/250; Km.28/165 to Km.28/290; Km.34/400 to Km.34/660 & Km.44/385 to Km.44/920 of NH-18 (NH-40) LHS & RHS and crossing at Km.11/400 LHS to RHS Chittoor water supply scheme with Adavipalli Reservoir as source under AMRUT 1.0

    Upload Document File:  4-Inv-Out 39-Invitation-peline from Km.0.0 to Km.2.197.pdf ...

    morthadmin - 04/23/2025 - 16:49 - 0 comments

  3. Permission for MPMKVVCL for laying underground road crossing of 11 KV line by Trenchess (HDD Method) on NH-46 Bhopal-Betul at Km 482 between Ch. 483 at Village-Dhokheda, Tehsil-Itarsi, District-Narmadapuram, in the State of Madhya Pradesh

    Upload Document File:  3-Inv-cmt-oo-53844.pdf ...

    morthadmin - 04/23/2025 - 16:48 - 0 comments

  4. Proposal for the permission of laying U/G & O/H 33Kv, 3x300Sqmm XLPE cable through HDD & Overhead method along NH-731, Sultanpur - Lucknow Road from CH.213.988 to CH.214.788 LHS (Length= 800.00M, U/G Method) and CH.214.788 to CH.215.214 RHS (Length=426.00M, O/H method) total length=1226.00M at Village-Khurdahi Bazar, Block-Lucknow Sadar, District-Lucknow, in the State of Uttar Pradesh

    Upload Document File:  1-Inv-cmt-U-Letter No. 96.pdf ...

    morthadmin - 04/23/2025 - 16:48 - 0 comments

  5. Four Laning of Rewa-Katni-Jabalpur Section of NH-7 from Km 397.000 to Km 465,500 (Package-IV) in the State of Madhya Pradesh under NHDP Phase IV on EPC mode Application for permission of pipeline laying and various crossing on NH-30(Khajuri to Dhangawa)-MPJNM-Jabalpur

    Upload Document File:  3-Inv-cmt-05052025-53951.pdf ...

    morthadmin - 05/05/2025 - 10:54 - 0 comments

  6. Permission for NOC for laying pipeline Crossing at Km. 727+800 at Sanivada Village, Kurmanpalem Mandal, Visakhapatnam District in the section of Anandpuram-Visakhapatnam-Ankapali (city limits) on NH-16 in the State of Andhra Pradesh

    Upload Document File:  9-Inv-commenttt-document (30).pdf ...

    morthadmin - 04/16/2025 - 15:06 - 0 comments

  7. Submission of proposal for obtaining road crossing and along the road permission to underground and standing 22 kV power line through HDD at NH- 965 D crossing at Pune to Satara Road at Ahilyadevi Holkar Chowk

    Upload Document File:  8-Inv-my-maha-document (29).pdf ...

    morthadmin - 04/16/2025 - 15:04 - 0 comments

  8. Permission for laying water supply pipeline crossing and along NH-965 DD near Mahad-Pandharpur along LHS Ch. 91/365 to Ch. 87/665 crossing at Ch. Km. 91/365, Total Length= 3.7 km

    Upload Document File:  7-Inv-mmt-document (28).pdf ...

    morthadmin - 04/16/2025 - 15:02 - 0 comments

  9. Proposal for grant of permission for erection of 33 KV underground cable/overhead line for road crossing at Km. 125/570 across NH-65

    Upload Document File:  6-Inv-cmt-document (27).pdf ...

    morthadmin - 04/16/2025 - 15:00 - 0 comments

  10. Submission of proposal for obtaining road crossing and along the road permission to underground and standing 22 kV power line through HDD at NH- 965 DD crossing at Pune to Lonand Road (Village-MIDC Lonand, Tal. Khandala, District-Satara) across NH-965 DD

    Upload Document File:  5-Inv-public-document (26).pdf ...

    morthadmin - 04/16/2025 - 14:58 - 0 comments

Pages