  1. Proposal for permission for laying of 11 KV Electric Underground cable road crossing Ch. Km 96.000 & km 102.659 (Total length 120m) under RDSS Scheme of Ausa-Chakur section of NH-361 in the State of Maharashtra

    Upload Document File:  8-Inv-2445 - 29.12.2023.pdf ...

    morthadmin - 12/29/2023 - 14:18 - 0 comments

  2. Proposal seeking ROW Permission for Crossing NH-53 Hazira-Palsana Highway by exiting 66KV Overhead Tower Line D/C Panther Tower with ASCR Panther Conductor for 66KV D/C Navsari Eklera Line at Km 36+710, near Sachin Over Bridge Bypass Surat in the State of Gujarat

    Upload Document File:  7-Inv-108. IPC_D-3850 dt.27.12.2023_GETCO-Navsari_Km 36+710_PD-Surat-233234.pdf ...

    morthadmin - 12/29/2023 - 14:15 - 0 comments

  3. Proposal seeking ROW Permission for laying of 1800mm x 16mm (with casing of 2500mm) Thick MS Carrier Water Trunk Main Line across NE-1 at Km 4+750 on Ahmedabad-Vadodara section of NE-1 in the State of Gujarat

    Upload Document File:  5-Inv-107. IPC_D-3813 dt.27.12.2023_AMC-Abad_Km 4+750_PD-Abad-232730.pdf ...

    morthadmin - 12/29/2023 - 10:56 - 0 comments

  4. Proposal seeking ROW Permission for laying of 450mm Dia Water Pipeline across National Highway-48 at Km 15+400 on Ahmedabad-Vadodara section of NH-48 in the State of Gujarat

    Upload Document File:  4-Inv-106. IPC_D-3812 dt.27.12.2023_AUDA-Abad_Km 15+400_PD-Abad-232727.pdf ...

    morthadmin - 12/29/2023 - 10:52 - 0 comments

  5. Proposal seeking ROW Permission for laying of 11KV Line across NE-1 (Ahmedabad-Vadodara section) at Km 57+950 & Km 57+800, Village-Samarkha, Taluka & Distirct-Anand in the State of Gujarat

    Upload Document File:  3-Inv-105. IPC_D-3811 dt.27.12.2023_MGVCL-Anand_Km 57+950_PD-Abad-232702.pdf ...

    morthadmin - 12/29/2023 - 10:47 - 0 comments

  6. Proposal of “West Bengal State Electricity Transmission Ltd. (WBSETCL) regarding ROW permission for crossing in between Tower Loc No.- AP-16/0(DD+3) to AP 17/0 (DD+15) over NH-60 (New NH-14) crossing at km 153.807 in between km 153.00 to km 154.00 in respect of “Construction of 132 KV D/C from Chandracona Road 132 KV Substation to propose Goaltore 132 KV Substation”

    Upload Document File:  2-Inv-cmt-4044708-document-38.pdf ...

    morthadmin - 12/29/2023 - 10:27 - 0 comments

  7. Proposal of Hindustan Petroleum Ltd. for ROW permission for laying Haldia–Panagarh LPG Pipeline of 10" NB dia (254 mm) with 16” diameter(406 mm) casing pipe along with 6” dia (153 mm) for OFC (conduit) across NH-116B (Nandakumar-Contai-Chandaneswari) at km 1.465 at Village-Bhabanipur-73 in the District of Purba Medinipur, West Bengal

    Upload Document File:  1-Inv-comment-40447-document-37.pdf ...

    morthadmin - 12/29/2023 - 10:22 - 0 comments

  8. Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Abohar Bypass from Ch. 66+300 Km to Abohar Bypass (Ganganagar side) Section CH. 76+500 along LHS Approx. 10.200 Km.

    Upload Document File:  4-Inv-82-4750-document (20).pdf ...

    morthadmin - 12/28/2023 - 17:17 - 0 comments

  9. Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Malout Bypass from Ch. 80+200 Km to Abohar Section CH 58+400 Km. (New CH. 44+500 to CH. 66+300 Km) along LHS Approx. 21.8 Km.

    Upload Document File:  3-Inv-86-4752-document (19).pdf ...

    morthadmin - 12/28/2023 - 17:14 - 0 comments

  10. Proposal for requesting permission for laying optical fiber cable and 40 mm 2 HDPE Pipe from Km. 00/000 to Km. 11/400 (Talegaon Dabhade to Dehu Cross Road) on LHS along NH-548 D

    Upload Document File:  2-Inv-cmt-4741-document (18).pdf ...

    morthadmin - 12/28/2023 - 14:29 - 0 comments