Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Proposal of Shri.S.Govindasamy & P.Ramesh for laying of underground Agricultural pipeline from Km 62/200 to Km 62/975 (LHS) and across the road at Km 62/975 in the Project Highway Thoppur – Mettur – Bhavani – Erode section of NH-544H in the limit of National Highways by Shri.S.Govindasamy & P.Ramesh

    ... 62/200 to Km 62/975 (LHS) and Language English Document Date:  Monday, November 2, 2020 ...

    morthadmin - 11/03/2020 - 13:46 - 0 comments

  2. Proposal seeking permission for laying of underground LPG GAS pipeline along with OFC cable across NH 234 Huliyar-Sira section at KM 257.450 and across NH 150A at Km 470.282 by M/s.HPCL, Bangalore through HDD method

    ... NH 234 Huliyar-Sira section a Language English Document Date:  Wednesday, October 21, 2020 ...

    morthadmin - 11/03/2020 - 13:37 - 0 comments

  3. Laying of water supply pipeline along the road from Km 166/305 to km 169/925 (RHS), From Km 169/925 to Km 169/995 (PWD Stretch), From km 169/995 to km 170/055 for a length of 3.750 Km and across the road at Km 166/620, Km 167/670, Km 169/995 and across existing NH-66 in Uthangarai Union and from Km 200/530 to Km 200/580 (RHS), Km 200/000 to Km 201/300 (LHS), Km 201/940 to Km 204/280 (RHS) for a total length of 3.69 Km and across the road @ km 198/400, Km 200/580, Km 201/270, Km 202/740 and Km 204/280 in Burgur Union in Tindivanam Krishnagiri Section of NH-66.in the State of Tamil Nadu

    ... to Km 169/995 (PWD Stretch), Language English Document Date:  Friday, September 25, 2020 ...

    morthadmin - 11/03/2020 - 12:03 - 0 comments

  4. NHAI – RO Hyderabad – PIU Nirmal– Construction of 132 KV DC line from proposed 220/132 KV SS Indravelly (Utnoor) to the existing 132/33KV SS Adilabad in Adilabad district- National Highway NH-44 crossing near Seetagondi (V) and Gudihatnoor (M) span between loc.No.133 C+6(TSP) and Loc.134 (TSP) in 190 m- Stringing of line across NH-44

    ... (Utnoor) to the existing Language English Document Date:  Thursday, October 29, 2020 ...

    morthadmin - 11/03/2020 - 11:57 - 0 comments

  5. NHAI – RO Hyderabad – PIU Hyderabad– Proposal for laying of OFC Cables of Telesonic Networks Limited from Km.23+680 to Km.24+550 (LHS), & Km.29+700 to Km.30.140 (LHS), Km.31+500 to Km.32+250(LHS) and across the road between Km.24+500-600, Km.30+100-200, Km.31+500-600 & km.39+200-300 for a total length of 2250m on Hyderabad- Bangalore section of NH-44 in the State of Telangana

    ... from Km.23+680 to Km.24+550 Language English Document Date:  Thursday, October 29, 2020 ...

    morthadmin - 11/03/2020 - 11:48 - 0 comments

  6. NHAI – RO Hyderabad – PIU Nirmal– Construction of 132 KV DC line from proposed 220/132 KV SS Indravelly (Utnoor) to the existing 132/33KV SS Adilabad in Adilabad district- National Highway NH-44 crossing near Gudihatnoor (V) and (M) span between loc.No.4C+6(TSP) and Loc.5 C+6 (TSP) in 238 m- Stringing of line across NH-44

    ... (Utnoor) to the existing Language English Document Date:  Thursday, October 29, 2020 ...

    morthadmin - 11/03/2020 - 11:43 - 0 comments

  7. Four/Six Laning of Km 198.00 to Km 263.00, Bharuch to Surat Section of NH-8 in Gujarat on BOT Basis, Package BOT-2

    ... on BOT Basis, Package BOT-2. Language English Document Date:  Saturday, October 31, 2020 ...

    morthadmin - 11/03/2020 - 11:35 - 0 comments

  8. Six Laning of Samakhiali-Gandhidham (306+000 to 362+160) section of NH-8A (Total length Km.56.16) in the state of Gujarat to be executed as BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) under NHDP Phase-V

    ... in the state of Gujarat to be Language English Document Date:  Monday, November 2, 2020 ...

    morthadmin - 11/03/2020 - 11:28 - 0 comments

  9. Proposal for seeking ROW permission for laying OFC along NH-27 Jetpur-Rajkot section from Km 132+800 to Km 133+800, Km 141+700 to Km 142+700, Km 144+100 to Km 146+000, Km 172+850 to Km 173+100 & Km 179+600 to Km 180+100 and 10 Nos. of Crossing at Km 119+100, Km 125+800, Km 141+700,Km 144+100, Km 145+800, Km 150+000, Km 173+100, Km 176+100, Km 177+550 & Km 179+600 for BharatNet Phase-Il Project by M/s. Gujarat Fibre Grid Network Limited, in the state of Gujarat.

    ... to Km 133+800, Km 141+700 t Language English Document Date:  Monday, November 2, 2020 ...

    morthadmin - 11/03/2020 - 11:08 - 0 comments

  10. Proposal for NOC permission for laying of TGPL Underground Gas Pipe of 8" Dia (200mm) Carbon Steel Pipeline from km.168.300 to km.174.900 (Dilari to Munda Pande) towards (Lucknow Road) and Crossing at two locations at ch. 166.200 & ch. 144.300 under NH-9 (Old NH-24) Laxmipur Katai Near Gopalji Filling Stating and Dhanupura Village Near CNG Station on NH-9 (Old NH-24) in the State of Uttar Pradesh

    ... Pipeline from km. 168.300 to Language English Document Date:  Thursday, October 29, 2020 ...

    morthadmin - 11/03/2020 - 11:02 - 0 comments

Pages