Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Fire Detection and Alarm System (FDAS) & Fire Detection and Suppression Systems (FDSS) for Buses

    Language English Status:  Draft Upload Document:  ...

    morthadmin - 04/26/2021 - 15:20 - 0 comments

  2. Six laning of Surat-Dahlsar Section of NH-8 from km 263.000 to Km 502.000 (Length Km 239.000) in the State of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V

    ... the State of Gujarat and Mahara Language English Document Date:  Thursday, April 22, 2021 ...

    morthadmin - 04/23/2021 - 22:41 - 0 comments

  3. Proposal for NOC permission for laying of 324 mm dia LPG pipeline( under Unnao-Gorakhpur Pipeline Project) & 89 mm MS duct for OFC cable across NH-31 at Km 264.668 through trenchless method In Village Jamalpur, Tehsil-Pindra, District Varanasi in the state of Uttar Pradesh

    ... Project) & 89 mm MS duct for O Language English Document Date:  Monday, April 19, 2021 ...

    morthadmin - 04/23/2021 - 12:23 - 0 comments

  4. Code of Practice for Type Approval of Trailers / Semi-trailers of categories T2, T3 and T4 being towed by Motor Vehicles of categories N2 and N3- Inclusion of Road Trains

    Language English Status:  Draft Upload Document:  ...

    morthadmin - 04/23/2021 - 12:19 - 0 comments

  5. Rehabilitation and up-gradation to 2-lane with paved shoulder for Jind-Karnal section from existing km 68+660 (Design km 68+857)i.e junction with Narwana Road (NH-352) at Subhash Chow kana ends at km. 153+700 (Design 154+219) at ITI Chowk which is the intersection with NH-1 of NH 709 A in the State of Haryana under NH (O) (Package-II)-NOC Proposal for laying of 12” carbon steel pipeline for CNG station of Indraprastha Gas Ltd. on Jind-Karnal-Meerut Road (NH-709A) from Km 145.685 to Km 148.865 (LHS) in District Karnal

    ... km 68+660 (Design km 68+857) Language English Document Date:  Tuesday, April 20, 2021 ...

    morthadmin - 04/22/2021 - 15:38 - 0 comments

  6. Proposal of M/s Tata Communications Ltd. for laying Optical Fiber cable from Km. 86.250 to Km. 92.500 (BHS) through HDD method along NH-1 (new NH-44) in the state of Haryana

    ... (BHS) through HDD method a Language English Document Date:  Tuesday, April 20, 2021 ...

    morthadmin - 04/22/2021 - 15:35 - 0 comments

  7. Permission for Laying of OFC along NH-40 from Km.6.200 to Km.36.650 on RHS, from Km.6.200 to 32.650 total length at different locations of RoW applied for 26.630 Kms (26630 mtrs) in Kadapa -Kurnool Section of NH-40

    ... Km.6.200 to 32.650 total le Language English Document Date:  Sunday, March 28, 2021 ...

    morthadmin - 04/22/2021 - 11:04 - 0 comments

  8. Operation & Maintenance Period of Tada – Nellore (Km. 52.800 to Km.163.600) Section of NH-5 (New NH-16) (BOT – Toll) – Permission for laying 8"gas steel pipeline from Km.120/140 to Km.120/280 on RHS, crossing at Km.120/280, from Km.120/280 to Km.133/960 on LHS and crossing at Km.126/330 for a length of 13.92 kms in the state of Andhra Pradesh

    ... (BOT – Toll) – Permissio Language English Document Date:  Monday, April 19, 2021 ...

    morthadmin - 04/20/2021 - 23:49 - 0 comments

  9. Permission for laying of underground power cable from proposed 132/33KV Badagada GIS s/s existing 132/33 KV Gride S/S at Kesura, Laying Underground Cable from Km. 4.500 to 7.750 km LHS & Crossing at km. 7.750 in Bhubaneswar to Puri section of NH-316

    ... 132/33 KV Gride S/S at Kesura, Language English Document Date:  Tuesday, April 20, 2021 ...

    morthadmin - 04/20/2021 - 23:47 - 0 comments

  10. Permission for laying of drinking water supply pipelines of DI Pipes of maximum dia 600mm under Mega Rural Piped water supply project consisting of 33 GP.s under Ghasipura & Anandapur Blocks . of Keonjhar

    ... Rural Piped water supply pr Language English Document Date:  Monday, April 19, 2021 ...

    morthadmin - 04/20/2021 - 17:43 - 0 comments

Pages