Sorry, you need to enable JavaScript to visit this website.

You are here

Print

Search results

  1. Approved Sanction Ceiling for NH(O) Works for NHIDCL for the FY 2021-22

    Language English Upload Document File:  Approved Sanction Ceiling ...

    morthadmin - 08/26/2021 - 14:24

  2. Proposal of Permission to lnstallation Overhead Optical Fiber Cable (OFC) along Malegaon - Risod Road section of NH-461-B from Km, 0/000 to Km,43/800, (Total Length: 56.190 Km,) in the state of Maharashtra

    ... OFC Malegon - Risod.pdf Language English Document Date:  Thursday, August 26, 2021 ...

    morthadmin - 08/26/2021 - 14:17 - 0 comments

  3. Proposal for Permission for laying steel pipeline 8" diameter and 40 mm PE pipe carrying OFC along and 125 mm MDPE pipeline across NH-43 (Shahdol Bypass at Kotma Village, Under Construction) at Ch.139.07 km in the State of Madhya Pradesh

    ... File:  850.pdf Language English Document Date:  Tuesday, August 17, 2021 ...

    morthadmin - 08/26/2021 - 14:08 - 0 comments

  4. Four laning of Hisar to Dabwali section of NH-10 from Km. 227.000 to 314.600 in the State of Haryana (Pkg.-ll) - Regarding permission for laying of HDPE sewer pipe of 1200 mm diameter from km 251.431 to km 250.640 (LHS)

    ... 02-2888_dated_24.08.2021[1].pdf Language English Document Date:  Tuesday, August 24, 2021 ...

    morthadmin - 08/26/2021 - 14:02 - 0 comments

  5. Permission for laying of 2 no. water pipeline (underground) across National Highway-53 at km 316/600 near Talcher Degree College for NTPC/Talcher Thermal Power Station in the state of Odisha

    ... of public comments(3) (1).pdf Language English Document Date:  Wednesday, August 25, 2021 ...

    morthadmin - 08/26/2021 - 13:53 - 0 comments

  6. Permission for Crossing of 132 KV S/C line on D/C Towers with 0.4 square inch ACSR Zebra conductor at km 122.828 to km 122.855 on NH 65 (New NH 52) section from Kaithal to Rajasthan /Haryana Border in District Hisar in the State of Haryana by overhead method with Clearance under maximum Sag condition between Road level and lowest line conductor and between road level is 11.6 m.

    ... 02-2795 dated 23.08.2021.pdf Language English Document Date:  Monday, August 23, 2021 ...

    morthadmin - 08/26/2021 - 13:45 - 0 comments

  7. Permission for trenching and laying OFC cables along with Ducts (2 Ducts) Crossing in NH-53 (old NH-6) at km 9.200 to Km.113.210 near (Wadi to Tiwasa) on Nagpur-Kondhali, Kondhali-Talegaon & Talegaon- Amravati section of NH-53

    ... 1648 - 21.08.2021.pdf Language English Document Date:  Saturday, August 21, 2021 ...

    morthadmin - 08/26/2021 - 13:44 - 0 comments

  8. Permission for Ianing of underground Pipeline approx.10 km in length, out of 10 km approx. 2.5 km Kamptee (Ch. 719+850) to the factor situated at village Dhargaon, Tehsil Kmaptee Dist. Nagpur (Ch. 722+350) & crossing 'the Road from underground pipeline by push through method at village Lihigaon under flyover (Ch.720+200)

    ... 1649 - 21.08.2021.pdf Language English Document Date:  Saturday, August 21, 2021 ...

    morthadmin - 08/26/2021 - 13:44 - 0 comments

  9. Laying of Underground OFC along the road from Km 11/000 to Km 12/145 (1145m) on LHS and from Km 12/145 to Km 21/400 (9255m) on RHS for a total length of 10400m and across the road at Km 12/145 by HDD method in Chennai – Tada section of NH-5

    ... File:  ROC2467.pdf Language English Document Date:  Thursday, August 19, 2021 ...

    morthadmin - 08/26/2021 - 13:44 - 0 comments

  10. Proposal - Rerouting for EHVT lines in section Q-R of Khandealgaon-Kharghar line (K-K) for NMIA from Proposed Switching station plot near Khandeshar railway station to Switching station plot 2 sector 15, Panvel passing below ROB of NH-48 and laid across the ROW between Km, 114/173 Km, to Ch 114/196 Km, in the State of Maharashtra

    ... P-18- NH-48 EHVT cable line.pdf Language English Document Date:  Thursday, August 19, 2021 ...

    morthadmin - 08/26/2021 - 13:43 - 0 comments

Pages